Office Fit-Out Brent
Office fit-outs for small and medium office suites in Brent, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Brent is small-scale work, and it is worth being plain about that. Brent has no central business district, and the rules that protect office space here are written for town centres and industrial land. The office work that arises is typically a suite above a shop in a town centre parade, a professional office in a converted house, or the office and welfare end of a unit on industrial land. We strip out, partition, light, power and finish the space so your staff can move in.
For Brent, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Brent: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Where Brent's office space actually is
Office fit-out work in Brent tends to come from three kinds of building, each with its own constraints. The first is the upper floors of town centre parades, where an accountant, a tutoring business or a charity takes a floor above a shop that is already in office use. If that floor is a flat, turning it into an office needs planning permission and loses a home. Brent has removed part of the Class MA office to dwellinghouse rights on those upper floors, so turning such a suite into flats is not simply a matter of prior approval.
The second is Brent's Strategic Industrial Locations and Locally Significant Industrial Sites, where Class MA and Class ZA permitted development rights have been removed. A business there often needs a small office, a meeting room and staff welfare facilities inside a warehouse or workshop shell. The third is the professional suite, such as a solicitor's or accountant's office in a former house. Each has different access, fire escape and services constraints, and we survey for those before quoting.
Cat A and Cat B in a small Brent office
Cat A and Cat B describe how far a Brent office is finished, and the lease tells you which one you are taking. Cat A is the landlord's base: ceilings, lighting, raised floor or trunking, heating and cooling, and working toilets, with open floor space and nothing else. Cat B is the tenant's layout on top of that: partitions and glazed screens, meeting rooms, a tea point or kitchenette, small power to desks, signage and decoration.
Above a Brent shop parade the base is rarely a true Cat A. Floors are often timber, heating may be domestic radiators, and the WC may be a single room at the half landing. That makes the first part of the job a strip-out and make-good before the Cat B work begins. We coordinate data cabling routes with your IT supplier so containment goes in during first fix, and your supplier then terminates and tests the network.
Brent building control for non-domestic office work
Office work needing building regulations approval in Brent goes in as a full plans application, because the building notice route applies to residential use only. Brent Building Control aims to respond to a full plans application within three weeks and gives a completion certificate after inspecting the site. On approval it usually provides an Inspection Service Plan setting out the stages it wants to inspect, and those stages go into our programme.
The drawings deal with the things an office changes. New partitions must not lengthen escape routes beyond what Part B allows, and fire doors, emergency lighting and detection follow the layout. Part M covers level access and an accessible WC where it is reasonable, and Part L covers new lighting and controls. Brent Building Control must be given notice two days before work starts. A registered building control approver is the alternative to the council service.
Working in an occupied Brent building, and leaving it
An office fit-out in Brent usually happens with other people in the building: a shop trading below, flats alongside, or another tenant on the next floor. The landlord's licence for alterations will set access times and noise limits, and we agree those before the programme is fixed. Drilling, cutting and strip-out go into agreed windows, with quieter partitioning and decoration running later where the landlord allows it. Deliveries of board and ceiling grid follow the landlord's rules for the entrance, stairs and any lift.
As a business client you have duties of your own under the CDM Regulations, chiefly to make suitable arrangements and give us the information you hold, such as the asbestos register for an older building. At the end of a Brent lease, dilapidations and reinstatement come into play, and the licence often requires your Cat B work to be stripped out. We record what was installed and how, so reinstatement can be priced accurately when the time comes.
- Strip-out of the previous tenant's office, with disposal
- Metal stud office partitions boarded both sides
- Glazed screens and glass-fronted meeting rooms
VOA Council Tax stock of properties, March 2025, for all 35 statistical areas in Brent. Counts rounded by the VOA.
Trusted Office Fit-Out in Brent
A small office fit-out lives on its programme, because every week without the space is rent paid for nothing. We visit, look at the base build, the escape route and the services, and give you a written quotation that separates the strip-out and make-good from the Cat B layout. We work to the landlord's licence and your designer's drawings, coordinate with your IT supplier, and a registered electrician certifies the new lighting and power circuits.
- Full plans building control coordinated for the new office layout from the outset
- Method statement and programme supplied for your landlord's licence for alterations
- Clean, tidy and reliable tradespeople
Reviewed jobs near Brent
1 MyBuilder review from Wembley, with each customer's own job title:
- Install new worktop, Wembley, 10 Jul 2024 (5 out of 5)
Read all 31 on our reviews page.
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Brent
What should a business budget for an office fit-out in Brent?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Brent quote follows a survey of the space.
Can an office fit-out in Brent use a building notice?
No. In Brent a building notice applies to residential use only, so office work that needs building regulations approval goes to Brent Building Control as a full plans application, or to a registered building control approver. Brent aims to respond to a full plans application within three weeks, so allow for that before the start date.
What is the difference between Cat A and Cat B for a Brent office?
Cat A is the landlord's base finish: ceilings, lighting, heating and toilets with an open floor. Cat B is the tenant's own fit-out on top: partitions, meeting rooms, kitchenette, desk power, signage and decoration. Small Brent suites above shops are often below a true Cat A, so a strip-out and make-good comes first.
Could an office floor above a shop in a Brent town centre become flats instead?
Not simply under permitted development. In Brent's town centres, Class MA rights are removed at ground floor level and part of the Class MA office to dwellinghouse rights are removed on other floors too. That is a planning question for the owner, and for an office tenant it mainly means the suite is likely to stay in office use.
Can we fit out offices inside a unit on Brent industrial land?
Yes. In Brent's Strategic Industrial Locations and Locally Significant Industrial Sites, Class MA and Class ZA rights have been removed, which protects the land for business use. The usual scope is offices, meeting rooms and welfare facilities inside the warehouse shell. We build them as partitioned rooms with their own lighting, heating and fire detection.
Does a Brent office fit-out need the landlord's consent?
Almost always. The lease will require a licence for alterations before partitions, ceilings or services are changed, and the landlord may want to see drawings and a method statement. We supply the programme and method statement to your agent, and the licence usually also sets out what must be reinstated at the end of the lease.
What notice does Brent Building Control need before office work starts?
Brent Building Control must be given notice two days before work starts, under Regulation 15(1) of the Building Regulations. After approval it usually issues an Inspection Service Plan listing the stages it will inspect. We build those stages into the programme so ceilings are not closed up before the inspector has seen what is inside them.
Who is responsible for CDM duties on an office fit-out?
The business commissioning the work is the client under the CDM Regulations and has duties of its own. The main ones are to make suitable arrangements for managing the project and to provide pre-construction information, such as an asbestos survey. As contractor we plan, manage and monitor the building work and keep the site safe.
How are dilapidations handled at the end of an office lease?
The lease and the licence for alterations say what must be removed and made good when you leave. That can mean stripping partitions, restoring ceilings and capping services. We keep a record of what we installed, which makes it easier to price reinstatement accurately and to agree the scope with the landlord's surveyor.
Every Service, One Team
More GS Renovation Services in Brent
One team for every GS Renovation service in Brent:
Same Service, Nearby Areas
Office Fit-Out Near Brent
We carry out office fit-out across Brent and the surrounding areas. Explore a nearby location:
Ready to Start Your Brent Project?
Free, no-obligation quote for office fit-out in Brent.