Renovation Company London

Whole-house and single-room renovations across London and the surrounding counties. One team for structure, services and finishes, with building control arranged for you.

A renovation in London can mean anything from reworking one tired bathroom to stripping a Victorian terrace back to brick and rebuilding it. This page sets out what each scale actually involves, the order the trades have to run in, what moves the price, and which consents you need before anything starts.

What counts as a renovation

Most enquiries fall into one of three scales, and they behave very differently on cost, programme and disruption. Being honest about which one you are actually planning is the single most useful thing you can do before asking anyone to quote.

  • Single room. A kitchen, a bathroom, or a room reconfigured and redecorated. Two to six weeks, no structural work, you can usually stay in the house.
  • Whole house, no structural change. Rewire, replumb, replaster, new kitchen and bathrooms, floors and decoration throughout. Eight to twenty weeks, and most people move out for part of it.
  • Whole house with structural reconfiguration. The above plus walls removed, a side return infilled or a rear extension built. Four to nine months, engineer and building control involved throughout.

The jump in price between the second and third is not gradual. Structural work brings an engineer, building control inspections, temporary propping, party wall notices where a neighbour is affected, and a longer programme for every trade that follows. It is usually worth it, but it should be a decision rather than something discovered halfway through.

Which part of the job you are planning

This page is the overview. Each part of a London renovation has its own page with the detail, the prices and the questions specific to it, so start with the one that matches what you are planning.

The order renovation work has to run in

Sequence is what separates a renovation that runs to programme from one that stalls. The order below is not a preference, it is the order the trades physically depend on each other, and getting it wrong is the most common reason a job doubles in length.

  1. Survey and design. Measure up, agree the scope in writing, appoint the structural engineer where the work needs one.
  2. Consents. Building control notification, planning where the outside changes, listed building consent if the house is listed, party wall notices served by you as building owner, freeholder licence to alter if it is a flat.
  3. Strip out and structure. Demolition, propping, steel beams set on padstones, new openings formed. Everything above depends on this being right.
  4. First fix. Wiring, pipework, drainage and any underfloor heating, run while the walls are open.
  5. Plastering and screeds. The point of no return. Anything you have not decided by now becomes expensive.
  6. Second fix. Kitchen and bathroom installation, sockets, radiators, doors, skirting and joinery.
  7. Decoration and snagging. Painting, flooring, then a written snagging list worked through before handover.
  8. Sign-off. Building control completion certificate and the paperwork you will need when you sell.

Two decisions have to be made far earlier than most people expect. Kitchen and bathroom selections need to be locked before first fix, because the position of every waste, cable and pipe depends on them. And if a wall is coming out, the engineer needs instructing at the start, not once the strip out has revealed something unexpected.

What a London renovation costs

Ranges rather than prices, because the honest answer depends on the size, the specification and the condition of the building. These are the same indicative London figures used across the rest of this site.

WorkIndicative London rangeNotes
Full house refurbishment£40,000 to £150,000+Whole house, services and finishes, no structural change
Kitchen renovation£18,000 to £60,000+Design, units, worktops, appliances, services and fitting
Bathroom renovation£6,000 to £20,000+Full refit including tanking, tiling and ventilation
Single-storey rear extensionfrom £40,000Rises with size, glazing and specification
Removing a load-bearing wall£2,500 to £6,500+Complete opening: engineer, steel, propping, removal, making good
Steel beam only£1,500 to £4,000Supply, installation and building control sign-off on one opening
Chimney breast removal, one floor£2,200 to £3,250 on a steel beam; £1,500 to £2,500 with bracketsA steel beam is the usual route; lower where the engineer and building control accept gallows brackets
Indicative London ranges, MyBuilder and Checkatrade, 2026. Every project is priced after a survey; these are not a quotation.

What actually moves a London figure, in rough order of impact: how much structure is involved, the condition of what is behind the plaster, access at the property, the specification you choose for kitchens, bathrooms and glazing, and whether you are living in the house while the work runs. The first two are the ones no one can price from a photograph, which is why we survey before quoting.

Consents you need before starting

Five separate systems can apply to one renovation, and they are independent of each other. Satisfying one does not satisfy another.

  • Building regulations. Apply to structural work, notifiable electrics, drainage, insulation and ventilation. They apply whether or not planning does, and completion certificates matter when you sell.
  • Planning permission. Needed where the outside changes beyond permitted development. Conservation areas remove permitted development for side extensions, two storey rear extensions, roof enlargements and cladding, and an Article 4 direction can remove more. Flats have no householder permitted development.
  • Listed building consent. On a listed building it covers internal work that affects its character, including removing walls and chimney breasts, as well as external changes. Working without it is a criminal offence.
  • Party Wall etc. Act 1996. Notice must be served on a neighbour before beams bear into a shared wall, a chimney breast in a party wall is removed, or you excavate near their foundations. You serve the notice as building owner, or your surveyor does; we give you the drawings and programme it needs and build to any award.
  • Freeholder consent. In a flat, the lease governs almost everything. A licence to alter is usually required, and structural change between flats is often prohibited outright.

We are a contractor, not a design practice: we appoint and coordinate the structural engineer, build precisely to the design produced, and manage the building control applications and inspections. Where a scheme needs an architect or a party wall surveyor, we will say so at survey rather than after the work starts.

What is different about renovating in London

Most of the constraints on a London job are logistical rather than technical, and they are what a quote from outside the city tends to miss. Terraced streets with no rear access mean every bag of rubble and every length of steel comes through the front door. Controlled parking bays need suspending, and a skip needs a permit from the borough before it lands. Working hours are restricted, and in a mansion block the managing agent will set them tighter still.

The building stock adds its own. Victorian and Edwardian terraces are solid nine inch brick with suspended timber floors and lath and plaster ceilings, so there is no cavity and nothing is quite square. Interwar semis are more predictable, with cavity walls and regular spans that suit a single beam. Period and listed properties in the central boroughs are governed by what you may not change at all. Each of those is a different job, and we price them differently.

Choosing a renovation company

Check the company is registered and that the registration matches the name on the quote. Ask for the insurance certificate and check it is current. Ask who will actually be on site and who you call when something goes wrong. Insist on an itemised written quote rather than a single figure, because a lump sum cannot be compared against anything and gives you no way to see what changed when it changes. There is more on vetting a contractor properly on our guide to choosing a builder in London and at builders in London.

Trading nameGS Renovation & Home Improvements
Registered companyGS Renovation Ltd, company no. 14611254, incorporated 2023
FounderAbdelaaziz Saaid, 30+ years' hands-on experience in the trade
Registered office3 Chauncy Avenue, Potters Bar, EN6 5LE
Service areaLondon and the surrounding counties, all 32 boroughs
Reviews4.9 average from 31 verified MyBuilder reviews
Insurance and complianceFully insured, all notifiable work signed off by building control
HoursMonday to Sunday, 09:00 to 17:00
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid floor and then re-tiled the bathroom floor. He had to build a timber frame for a new…
andrew_lackEnfield · via MyBuilder
★★★★★
Really happy with the quality of remedial works carried out by George in putting other previous tradesman work right. He was very helpful, honest and advised me on certain things. So happy that i am also getting him to quote for my…
archeryWaltham Cross · via MyBuilder
★★★★★
I am very happy to recommend George after he completed the work on my 2 bathrooms. He worked very hard to make sure everything was completed and even came on a Sunday evening to finish the work...which shows how committed he is to…
hit10Enfield · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions

How much does a house renovation cost in London?

A full house refurbishment in London runs roughly £40,000 to £150,000 or more, depending on the size of the property, the specification and how much structural work is involved. A single room is far less: a bathroom typically £6,000 to £20,000 and a kitchen £18,000 to £60,000. Indicative London ranges, MyBuilder and Checkatrade, 2026. Every project is priced after a survey.

How long does a full house renovation take?

Eight to twenty weeks for a whole house with no structural change, and four to nine months where walls come out or an extension is built. The variables are the size of the property, how much is hidden behind the plaster, and how quickly decisions on kitchens and bathrooms are made, because those have to be locked before first fix.

Do I need planning permission to renovate a house in London?

Not for internal work in most cases, unless the house is listed, when listed building consent covers internal work such as removing walls or chimney breasts. Building regulations still apply to structural, electrical, drainage and insulation work. Planning permission is needed where the outside changes beyond permitted development, which is narrower in conservation areas and can be removed by an Article 4 direction. We check your address before any design work begins.

Can I live in the house during a renovation?

Usually yes for a single room, often no for a whole house. A kitchen or bathroom refit is manageable if you have an alternative, and we arrange a temporary sink where a kitchen is out for weeks. A whole-house renovation means no heating, water or power at various points, so most clients move out for part of it and we sequence the work to keep that window as short as possible.

What order should renovation work be done in?

Structure first, then first-fix services, then plastering, then second fix, then decoration. Specifically: survey and design, consents, strip out and structural work, wiring and pipework, plastering and screeds, kitchen and bathroom installation, then painting and snagging. The order is dictated by what the trades physically depend on, and getting it wrong is the most common cause of a job overrunning.

What is the difference between a renovation and a refurbishment?

In practice the two words are used interchangeably in the UK trade, and both cover bringing a property back up to standard. Where people do draw a line, refurbishment tends to mean repairing and updating what is already there, while renovation implies changing the layout or the structure as well. We quote against a written scope rather than a label, so what matters is what the scope actually says.

Do I need an architect for a renovation?

Not for most internal renovation work, but yes for anything that changes the external envelope or needs a planning application. You will need a structural engineer, which is different, for any wall removal, new opening or extension. We are a contractor: we appoint and coordinate the engineer and build to their design, and we will tell you at survey if a scheme needs an architect.

How do I know a renovation company is legitimate?

Check the company number on the Companies House register and confirm it matches the name on the quote. Ask for a current insurance certificate. Insist on an itemised written quote rather than a lump sum, and ask who your point of contact is. GS Renovation Ltd is company number 14611254, registered in England and Wales, fully insured, and rated 4.9 from 31 verified reviews on MyBuilder.

Free Quote

Get a Free Renovation Quote

Tell us what you are planning. We survey the property, then quote in writing, itemised so you can see what every stage costs.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote · We reply within 24 hours · Covering London & surrounding counties

Planning a Renovation in London?

Free, no-obligation quote anywhere in London and the surrounding counties. Rated 4.9 from 31 reviews on MyBuilder, fully insured.

Get Your Free Quote
Call 07472 424 226Free quote