Office Fit-Out Wembley
Office fit-outs for small and medium office suites in Wembley, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Wembley means suites, studios and upper floors in and around the town centre, often in buildings shared with shops, cafes and sometimes flats. Brent has removed part of the Class MA office to home rights on town centre upper floors, so that office space is expected to stay in business use. We strip out, build partitions and ceilings, run lighting and small power, fit tea points and WCs, and coordinate data with your IT supplier.
For Wembley, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Wembley: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Where office space sits in Wembley and why it matters
Office space in Wembley sits in and around the town centre rather than an office park. Brent removes Class M and Class MA rights at ground floor level in its town centres, and part of the Class MA office to home rights on the floors above. Expect offices on upper floors above shops, in suites within mixed-use blocks and in small professional rooms for accountants, solicitors or agencies. A fit-out in those buildings shares entrances, stairs and services with shops and sometimes flats, which shapes access, the fire strategy and working hours.
In a mixed building the landlord usually owns the fire alarm, the heating and cooling plant and the incoming supplies, and recovers their upkeep through the service charge. Your fit-out connects to those systems rather than replacing them, so ask the managing agent early for the fire strategy, the alarm zone plan and the spare electrical capacity. New detectors in your suite are normally connected by the landlord's alarm contractor, whose dates go into the programme.
Cat A, Cat B and the order of work in a Wembley suite
Cat A and Cat B describe how far a Wembley office is finished before you move in. A Cat A space is the landlord's base: open floor, suspended ceiling, raised floor or perimeter trunking, lighting, heating and cooling, and WCs. Cat B is the tenant's layer on top: partitions, glazed meeting rooms, a tea point, data points, furniture and signage. An upper-floor suite above a Wembley shop can come as a bare shell below Cat A, so the first job is checking what the lease hands over.
The building work in a Wembley office fit-out follows a fixed order. Strip-out comes first, partitions and glazed screens are set out next, services are run above the ceiling and below the floor, and then ceilings, doors and decoration close it up. Data cabling is coordinated with your IT supplier so containment and floor boxes are in place before the ceiling grid goes in. A registered electrician installs and certifies the lighting and small power, and a tea point or shower has its waste route agreed early.
Building regulations for a non-domestic fit-out in Wembley
An office fit-out in Wembley cannot go through a building notice, because in Brent a building notice applies to residential use only. Partitions that change escape routes, new WCs, new drainage and alterations to fire-separating walls are building work, so they need a full plans application to Brent or a registered building control approver, which your designer prepares. Brent aims to respond to a full plans application within three weeks, and that time belongs in the programme before strip-out starts.
Three parts of the Building Regulations shape a Wembley office layout. Part B sets fire safety and means of escape, so travel distances, door ratings, fire-stopping and emergency lighting are fixed on the drawings first. Part M covers access, including the approach, door widths and an accessible WC where one is required. Part L sets the efficiency of new lighting and controls. Approved plans in Brent are valid for three years, and Brent's building control service inspects the work and issues a completion certificate after its inspections.
Landlord consent, occupied buildings and lease end in Wembley
A Wembley office fit-out starts with the landlord's licence for alterations, which records the approved drawings, the working rules and any reinstatement the landlord will want at lease end. In an occupied building, other tenants still need quiet during the working day. Brent's conventional hours for construction noise are 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays, so drilling and breaking out cannot simply move to the evening. We agree noisy slots with the landlord and keep evenings for quiet tasks.
A business commissioning a Wembley fit-out is a commercial client under the CDM Regulations, which carries duties a homeowner does not have: making arrangements for the project, giving the contractor the information it needs and allowing enough time. Where more than one contractor is involved, it also appoints a principal designer and principal contractor. At the other end of the lease, dilapidations and reinstatement fall due. We photograph and record the space before strip-out so the starting condition is agreed, and we can price the reinstatement the lease requires when you move out.
- Small power to desks, floor boxes and perimeter trunking
- Strip-out of the previous tenant's office, with disposal
- Data containment laid for your IT supplier to cable
VOA Council Tax stock of properties, March 2025, for Wembley North, Wembley West, Wembley East and Wembley Park. Counts rounded by the VOA.
Working With GS Renovation in Wembley
We fit out offices to the landlord's licence and the approved drawings, with the fire strategy settled before a partition goes up. Strip-out, partitions, ceilings, lighting, small power, tea points and WCs run under one programme, and data cabling is coordinated with your IT supplier so nothing is chased in twice. A registered electrician certifies the electrical work. We agree working hours and noisy slots with the building manager before strip-out, and you receive a written quotation after a site visit.
- Lease reinstatement clauses read before any partition is fixed to the structure
- Office strip-out and core drilling booked outside other tenants' working hours
- Registered in England, Companies House no. 14611254
Reviewed jobs near Wembley
1 MyBuilder review from Wembley, with each customer's own job title:
- Install new worktop, Wembley, 10 Jul 2024 (5 out of 5)
Read all 31 on our reviews page.
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Wembley
How much does an office fit-out cost in Wembley?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
What is the difference between Cat A and Cat B for a Wembley office?
Cat A is the landlord's finished base: open floor, ceiling, lighting, heating and cooling, and WCs. Cat B is what makes it your office: partitions, meeting rooms, a tea point, data points, furniture and signage. A suite above a Wembley shop can come as a shell below Cat A, so check the lease schedule before budgeting. We build both layers.
Can a building notice be used for an office fit-out in Wembley?
No. In Brent a building notice applies to residential use only, so office work that counts as building work, such as partitions on an escape route, new WCs or new drainage, needs a full plans application or a registered building control approver. Brent aims to respond to a full plans application within three weeks, so the drawings go in before strip-out.
Who connects a Wembley office fit-out to the landlord's fire alarm?
Usually the landlord's own alarm contractor. In a shared Wembley building the fire alarm, and often the heating and supplies, belong to the landlord and are maintained through the service charge. We install the cabling and devices in your suite to the agreed zone plan, and the landlord's contractor connects and commissions them. The alarm changes form part of the full plans application, because a building notice is not available for office work in Brent.
Can noisy fit-out work run in the evening in a Wembley office building?
Only quiet work, as a rule. Brent's conventional hours for construction noise are 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays. In an occupied building we agree noisy slots with the landlord, such as early mornings before other tenants arrive, and keep evenings for quiet tasks such as cabling, ceilings and decoration.
What does a landlord's licence for alterations cover?
It is the landlord's written consent to your fit-out. It lists the approved drawings and specification, sets working rules such as hours, deliveries and noise, and records whether the works must be removed at lease end. We build to the approved drawings and keep a record of anything that will need reinstating when you leave, which makes the dilapidations stage simpler.
What duties does a business have as a CDM client for a Wembley fit-out?
A commercial client has duties a homeowner does not. Under the CDM Regulations the business must make suitable arrangements for managing the project, appoint a principal designer and principal contractor where more than one contractor is involved, pass on the information the contractor needs and allow enough time and resources. We prepare the construction phase plan for a single-contractor job and list what we need from you at the start.
Which parts of Wembley have office space to fit out?
Mainly the upper floors in and around the town centre. Office space here is found above shops, in mixed-use buildings and in larger blocks, and Brent has removed part of the Class MA office to home rights on town centre upper floors, so that space is meant to stay in business use. We fit out small suites and single floors, and we say plainly if a job needs a larger contractor.
How long are approved office fit-out plans valid in Brent?
Three years. Approved building control plans in Brent are valid for three years, after which a new application and fee are needed if work has not started. Brent Building Control usually provides an Inspection Service Plan on approval, setting out the stages that need inspection, and must be given notice two days before work starts.
Every Service, One Team
More GS Renovation Services in Wembley
One team for every GS Renovation service in Wembley:
Same Service, Nearby Areas
Office Fit-Out Near Wembley
We carry out office fit-out across Wembley and the surrounding areas. Explore a nearby location:
Ready to Start Your Wembley Project?
Free, no-obligation quote for office fit-out in Wembley.