Open-Plan Conversions London
Open-plan kitchen, diner and living conversions in London, steel, floors, heating and finishes as one job.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £3,000 to £8,000+
- Free site survey, itemised quote
An open plan conversion in London nearly always means a knock through: taking out a wall that holds the house up and carrying its load on a steel beam you never see. This page is for the London homeowner who wants two rooms made into one, or a kitchen opened into a dining room, and who needs to know what is involved before getting quotations. It covers which walls in a London house are doing structural work, how the job runs on site, the building regulations and party wall duties, what it costs and what goes wrong. We write it as the contractor who props the floor and cuts the opening. A structural engineer we appoint designs the beam, we build to the design, building control inspects it. If the wall turns out to be a stud partition, you may not need us, and we say so.
Across London, a knock-through finished as one room typically costs £3,000 to £8,000 or more, including the steel beam (indicative ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in London: the structural engineer we appoint designs the steel, we install it, and building control signs it off.
Price guide
| Work | Indicative London range |
|---|---|
| Open-plan conversion, steel beam and finishing | £3,000 to £8,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Open-Plan Kitchen-Diner Ideas.

Which walls come out in a London knock through?
The wall you want gone is almost always doing something, and in a London house it is one of four. In a Victorian or Edwardian terrace the spine wall between the two reception rooms carries the first floor joists, and removing it is the classic front to back knock through. The rear wall between the back reception and the closet wing kitchen carries the closet wing roof and often a bedroom, and opening it makes the kitchen diner. The hall wall carries the stair and the floor above and is the one that changes the fire escape route. In an interwar semi the wall between the two reception rooms usually is load bearing, and the wall between kitchen and dining room usually is not.
Flats are different again. In a mansion block or a converted house the cross walls carry the floors of every flat above you. The engineer is designing for loads you cannot see, and the freeholder has to consent. What you get from the opening depends on how much wall you keep. A full width removal with the beam hidden gives one room. Keeping a nib either side and a boxed downstand reads as two connected rooms and costs less. A broken plan opening, with a glazed screen or a wide cased opening in the new beam, keeps sound and cooking smells apart while letting the light through. We recommend broken plan where the hall wall is involved, for the fire reasons below.
How an open plan conversion runs on site in a London home
The sequence starts with a survey and ends with a completion certificate. At the survey we trace what the wall is carrying: joist direction, the wall above, the roof, and where the load lands at each end. The structural engineer we appoint then designs the beam, its padstones and its bearings. Where two walls meet at a corner, as when a rear wall and a closet wing flank come out together, the design is usually a goalpost frame rather than a single beam. The engineer also decides between a downstand beam below the ceiling and a flush beam set within the floor depth. We build whichever is drawn, and we tell you the cost difference between the two before you choose.
On site we prop both sides of the wall and the floor above before anything is cut, then take the wall down in a controlled strip. The beam goes in on its padstones, is packed tight with dry pack mortar so the load transfers before the props come out, and building control inspects it exposed. Only then does the finishing start, and finishing is most of the programme. The floors of the two rooms are often at different levels and have to be brought to one. Radiators and pipework in the old wall are rerouted, sockets and switches moved, and the ceiling joined and skimmed. A flush beam adds joist hangers and a second inspection. Decoration comes last, after the final building control visit.
Consents and regulations for a knock through in London
You need building regulations approval for every structural opening, planning permission for none, and a party wall notice where the beam bears into a shared wall. The beam comes under Part A. Part B matters when the hall wall comes out, because a house with two or more floors above ground normally relies on a protected hall and stair as its escape route. Open the hall into the living room and that route is lost, so building control may ask for a fire door arrangement, a sprinkler, or a broken plan layout that keeps the enclosure. Part F covers extraction where a kitchen joins a living room, and Part P covers the electrical work. On a listed house, listed building consent is needed.
Where the new beam bears into the wall you share with next door, the work is notifiable under the Party Wall etc. Act 1996. You serve the notice as building owner, two months before the work starts, and the neighbour can consent or appoint a surveyor. We are not party wall surveyors and we do not serve notices, but we provide the engineer's drawings the notice relies on and we build to the award. If the wall is a timber stud partition with nothing bearing on it, none of this applies and a carpenter can take it out. The way to know is to have it checked, not to guess from how hollow it sounds. We check at the survey.
What does an open plan conversion cost in London?
A complete knock through in London costs £3,000 to £8,000+ including the steel beam and the finishing, indicative London ranges, MyBuilder and Checkatrade, 2026. That is not a quotation. A firm price follows a survey and the engineer's design, because the drawing decides half the cost. A single downstand beam on a short span, with padstones on sound brick, sits at the bottom of the range. A goalpost frame at a corner, a flush beam within the floor depth, or a long span over a full width opening moves the job up it. The finishing moves it further. Two floors at different levels, a boiler flue or radiator pipework in the old wall, and a ceiling that has to be joined all add days.
The figures that sit outside the building work are the engineer's fee, the building control charge and, where the neighbour appoints a surveyor, the party wall award. A parking suspension for the steel delivery and a skip permit are small but real on a London street. If you are refitting the kitchen at the same time, the sequence matters more than the money. The kitchen layout, the island position and the extraction route decide where the beam can land and where the services run, so the kitchen design should exist before the engineer draws. The most common way to overspend is to open the wall first and design the kitchen second, then pay to move a steel post that is in the way.
Living in your London house during the knock through
You can stay in the house, but the ground floor is a building site until the plaster is dry. If the kitchen wall is the one coming out, you are without a kitchen for the duration. The steel sets the access. A beam longer than the hall is delivered through a front bay window or spliced on site to the engineer's detail. Either way it needs a parking suspension on the day, because it comes off a lorry. Most London terraces have no side access, so every barrow of rubble and every length of steel comes through the front door. We sheet the hall, seal the stair with a zipped screen and run extraction to a window so the dust stays downstairs.
The neighbours will hear it. Cutting brickwork against a party wall carries straight into the room next door, so we tell them the programme before we start and keep to the hours the borough's noise rules allow. In a flat the managing agent will want the engineer's drawings and our insurance before we book anything, and the lift is usually off limits for rubble. Propping stays in place until building control has seen the beam, which means a few days of steel props in the room you are trying to live around, and a ceiling you cannot yet paint. Plan the kitchen fit and the decorating so that the day the props come out is not the day you expected to cook. If the new kitchen is already ordered, our kitchen fitters page covers how the fit follows the structural work.
What goes wrong with open plan conversions, and how to choose a London contractor
Knock throughs we are asked to look at after someone else built them fail in a handful of ways. A beam sized by the builder rather than an engineer, usually too shallow, so the ceiling above cracks along a line and the doors upstairs start to stick. A beam bearing on a half brick nib with no padstone, so the brickwork crushes. A floor above that was never propped during the cut, so the joists dropped before the beam was in and the crack is permanent. A hall wall removed on a three storey house with no thought for the escape route, found when the house is sold. And two floors joined with a step because levelling them was never priced.
Choosing a contractor for a knock through is a matter of asking who designs it and who signs it off. Expect a named structural engineer, not a builder who has done plenty of these. Expect a building control application number before the wall is touched, and two inspections, one with the steel exposed and one at completion. Ask whether the quotation includes rerouting the heating and electrics in the wall, levelling the floors and joining the ceiling, or whether those are extras waiting to happen. Ask who will be on site each day and who you ring. We give you one named point of contact, our own trades rather than a subcontractor chain, and building control coordinated on every notifiable job. The notice you serve where the beam bears into a shared wall is explained on our party wall page.
- Structural engineer coordination and building control sign-off
- Open-plan kitchen-diner conversions
- Rooflights and glazed roofs to bring light deep into the plan
Why London Homeowners Choose GS Renovation
London homeowners choose GS Renovation for an open plan conversion because we treat the knock through as the structural job it is and price the finishing honestly alongside it. A structural engineer we appoint designs every beam, we build to that design with our own trades, and building control is coordinated on every notifiable job. Abdelaaziz Saaid, our founder and director, brings over 30 years of hands-on structural experience to the survey, and a free, no obligation written quotation follows it. One named point of contact runs the job from survey to certificate. Fully insured, and rated 4.9 from 31 reviews on MyBuilder.
- Our own trades on site rather than a chain of subcontractors
- Broken-plan and Crittall-style options priced alongside full open-plan
- Beam depth checked against ceiling heights before you commit
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably priced quote. The work started on time and George worked really hard every day. There were…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction, fittings, appliances, installations. We are tenants and the landlord initially thought that to fit…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an interior designer, I will keep hiring his team for any incoming projects.
FAQ
Frequently Asked Questions about Open-Plan Conversions London
Is a cheap open-plan conversion quote in London worth taking?
A cheap open-plan conversion quote in London is only worth taking if it covers the same work, and usually it does not. A low figure normally leaves out the approvals (building regulations approval of the steel and interlinked alarms) or the making good, both of which still get paid for in London. GS Renovation itemises within £3,000 to £8,000 or more (indicative) so the comparison is honest.
Do I need planning permission for a knock through in London?
No, an internal knock through does not need planning permission anywhere in London. It needs building regulations approval, because a load bearing wall is coming out and a steel beam is going in, and building control inspects and certifies the work. The exception is a listed house, where listed building consent is required. Leaseholders also need the freeholder's consent.
How do I know if the wall I want to remove in my London house is load bearing?
You cannot tell reliably by tapping it, and the safe assumption in a London house is that it is. The spine wall of a terrace, the wall to the closet wing and the hall wall almost always carry floors or a roof. A structural engineer confirms it by tracing the joists and the walls above, which we arrange at the survey.
Does an open plan conversion in London need a party wall agreement?
Only if the new beam bears into the wall you share with a neighbour, which it often does in a terrace or semi. Bearing steel onto a party wall is notifiable under the Party Wall etc. Act 1996, and you serve the notice as building owner two months before work starts. On your own internal walls, the Act does not apply.
Can I remove the hall wall to open up my London terrace?
Often, but the hall and stair are your fire escape route under Part B, so building control will want that route dealt with. On a two storey house a fire door arrangement or an alternative layout is usually accepted. On a three storey house it is harder, and a broken plan opening that keeps the hall enclosed is often the answer.
Can the beam be hidden in the ceiling of my London knock through?
Yes, if the engineer designs a flush beam set within the depth of the floor above, with the joists hung off it. It costs more than a downstand because the joists have to be cut and re hung and there is a second inspection. It is worth it where the ceiling is low or the opening is full width.
How long does a knock through take in a London house?
The structural part is measured in days, the finishing in weeks. Propping, removing the wall, fitting the beam and the first inspection take a few days. Levelling floors, rerouting heating and electrics, joining the ceiling, plastering and decorating take longer, and plaster has to dry before paint. The engineer's design and the party wall notices need their own lead time first.
Will a knock through in London damage the room above?
Not if the floor is propped before the wall is cut and the beam is packed tight before the props come out. The cracks people see upstairs after a knock through come from floors that dropped during the cut or beams that were too shallow and deflected. Both are sequencing and design failures, not an inevitable cost of the work.
Should I choose open plan or broken plan for my London home?
Broken plan is the better choice where the hall wall is involved, where you want to cook without the smell reaching the sofa, or where two people work from home. Full open plan suits a kitchen diner opening onto the garden. Structurally the beam is the same either way, so the choice is about how you live, not the engineering.
Every Service, One Team
More GS Renovation Services in London
One team for every GS Renovation service in London:
Same Service, Nearby Areas
Open-Plan Conversions Near London
We carry out open-plan conversion across London and the surrounding areas. Explore a nearby location:
Ready to Start Your London Project?
Free, no-obligation quote for open-plan conversion in London.