Office Fit-Out Soho
Office fit-outs for small and medium office suites in Soho, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Soho tends to mean an upper floor or a small suite in a period building, taken by a studio, an agency or a professional practice, sometimes with a shop below and flats above. Westminster's building control, the Fire Safety Order and your landlord's licence for alterations set the rules, and the neighbours set the hours. We strip out and build partitions, ceilings, lighting, power, tea points and WCs to your designer's drawings, and hand the floor back ready to work in.
For Soho, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Soho: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Soho office floors and the Central Activities Zone
Soho's offices sit in the Central Activities Zone, where Westminster has protected office floor space from conversion. Its Article 4 Direction removing Class E to C3 rights in the zone was made on 14 July 2021, modified by the Secretary of State on 22 July 2022, and as modified covers the Soho Special Policy Area. For an office tenant that is background rather than a task: it keeps these floors in commercial use, so fitting out for a business stays the working assumption.
An office in Soho can be a floor above a shop, a studio in an old workshop building or a suite of rooms off a narrow stair, often with period windows, timber floors and limited riser space. That is why a Soho office fit-out is planned around the building rather than a grid: where the cables can run, how the stair doubles as the escape route, and how much weight an old floor takes. If the building is listed, listed building consent covers works inside as well as out, so new partitions, ceilings and cable routes may need it too.
What Westminster counts as a fit out in a Soho office
Westminster building control defines a fit out as alterations to an existing office or shop where no structural alterations take place. That covers most of what a small Soho office job involves: new partitions, ceilings, lighting, power, data, toilets and a finish, inside a shell that stays as it is. Once a beam is cut or a floor is opened for a new stair, the work stops being a fit out in that sense and needs a structural engineer's design.
Because an office is a workplace, the Fire Safety Order applies to it, and Westminster only accepts a building notice where the work is outside that Order and does not change the layout. A Soho office fit out therefore needs full plans, whether it goes to the council or to a registered building control approver. We ask your designer for fire strategy drawings early, since escape routes, alarm zones and door ratings decide where the partitions can go, with Part M access and Part L lighting checked alongside.
Cat A and Cat B on a Soho office floor
Cat A and Cat B are the two halves of an office fit-out, and it helps to know which one you are buying. Cat A is the landlord's shell made usable: a clean ceiling, lighting, heating and cooling, small power, finished floors and working WCs. Cat B is the tenant's layer: meeting rooms, glazed screens, a tea point or kitchenette, furniture, signage inside and the data cabling your IT supplier specifies. We price the two separately so each side sees its share of a Soho floor.
Westminster publishes a worked example for the building control charge on a non-structural fit out of three storeys of an office, split into a plan charge and an inspection charge. The point for a Soho tenant is that fees follow the cost of the notifiable work. A Cat B layout with new partitions, lighting and fire alarm changes is still a building control job, even where the landlord's Cat A work was signed off before you moved in.
Working in an occupied Soho building, and leaving it
A Soho office fit-out rarely has an empty building around it. Noisy work runs Monday to Friday 8am to 6pm and Saturday 8am to 1pm, and anything noisy outside those hours needs a Section 61 application at least 28 days ahead. Quiet work such as data cabling, ceiling tiles and decoration can go into evenings where the landlord agrees. As the client of a commercial project, you also have duties of your own under the CDM Regulations, which we explain before the start.
Think about the end of the lease before the start of the fit-out. If your lease carries a reinstatement clause, at the end a landlord can claim dilapidations for partitions, cabling and finishes left behind. We record the Soho floor as found, with dated photographs, and keep a schedule of what we installed, so the strip out at lease end is scoped from facts rather than argued about, and the landlord's surveyor sees the same record.
- Data containment laid for your IT supplier to cable
- Strip-out of the previous tenant's office, with disposal
- Raised access floors laid, repaired or adapted for new desk layouts
VOA Council Tax stock of properties, March 2025, for the Fitzrovia West & Soho statistical area, which also covers west Fitzrovia. Counts rounded by the VOA.
Trusted Office Fit-Out in Soho
An office only earns its rent once your team can work in it, so the fit-out has to run to a date agreed at the start. We work from your designer's drawings and fire strategy, set out a programme with strip out, first fix, ceilings, partitions and finishes in order, and coordinate the data cabling with your IT supplier. One contact runs the site, and the fire alarm, electrical and gas certificates come from the registered installers before handover.
- Neighbours given notice before the noisy stages
- Office strip-out and core drilling booked outside other tenants' working hours
- One named contact for the landlord, the building manager and your office manager
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Soho
What should a business budget for an office fit-out in Soho?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Soho quote follows a survey of the space.
Does the office Article 4 direction in Soho change anything for a business fitting out a floor?
Not directly. Westminster's Article 4 Direction removing Class E to C3 rights in the Central Activities Zone, made on 14 July 2021 and modified by the Secretary of State on 22 July 2022, covers the Soho Special Policy Area. It stops office floors there becoming homes under Class MA, which keeps them in business use. Your fit-out still turns on the landlord's licence for alterations and building control.
Is a non-structural office fit out in Soho still a building control job?
Usually yes. Westminster building control treats a fit out as alterations to an existing office or shop with no structural work, and new partitions, escape routes, toilets and electrics are still building work. An office falls under the Fire Safety Order, so Westminster will not take a building notice and the application goes in as full plans.
What is the difference between a Cat A and a Cat B fit out?
Cat A makes the shell usable, Cat B makes it yours. Cat A covers ceilings, lighting, heating and cooling, small power, floors and WCs, usually paid for by the landlord. Cat B covers the tenant's layout: meeting rooms, screens, a tea point, furniture and data. The two are often priced and programmed as separate packages.
Can office fit-out work in Soho carry on in the evenings?
Quiet work can, noisy work needs consent. Westminster asks for a Section 61 application at least 28 days ahead for noisy construction outside Monday to Friday 8am to 6pm and Saturday 8am to 1pm. We keep drilling and cutting inside those hours and move cabling, decoration and snagging into the evenings where the building allows.
What duties does a business have under CDM on an office fit-out?
A commercial client has duties of its own under the CDM Regulations. You make suitable arrangements for managing the project, give the contractor the information you hold about the building, such as asbestos surveys, and allow enough time and resources. Where more than one contractor is involved, you appoint a principal designer and a principal contractor in writing. We act as principal contractor and prepare the construction phase plan for the works.
What happens to an office fit-out when the lease ends?
Check the reinstatement clause now. A lease can require the tenant to remove its alterations and return the space as it was, and a landlord can claim dilapidations for what is left. A dated record of the floor as found, and a schedule of what was installed, makes the end of lease strip out simpler to agree.
How long does Westminster take to approve full plans for a Soho office fit-out?
Allow at least five weeks. Westminster building control aims to contact applicants within 5 weeks with a decision on a full plans application, and says it may take longer. Work can start before the decision once the council has at least 2 days' notice of the start date, but anything built ahead of approval is at risk if the plans change.
How does Westminster work out building control charges for a Soho office fit out?
From the estimated cost of the notifiable work. Westminster publishes a worked example for a non-structural fit out of three storeys of an office, split into a plan charge and an inspection charge. Painting and decorating are left out of the estimate, so an itemised quote gives you the right figure to enter.
Every Service, One Team
More GS Renovation Services in Soho
One team for every GS Renovation service in Soho:
Same Service, Nearby Areas
Office Fit-Out Near Soho
We carry out office fit-out across Soho and the surrounding areas. Explore a nearby location:
Ready to Start Your Soho Project?
Free, no-obligation quote for office fit-out in Soho.