House Refurbishment Soho
Whole-house refurbishments in Soho, every floor of the house renewed from the roof down, in the right order.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £43,530 to £110,350
- Free site survey, itemised quote
House refurbishment in Soho is a small, specialised market: the VOA counts 2% of homes in its Fitzrovia West and Soho area as houses, and every one of them is terraced. When a whole Soho house does come up, expect an old building with lime plaster, timber floors, tired services and sash windows, quite possibly inside the Soho Conservation Area, on a street with little room for a skip. We renew the fabric room by room, to your designer's drawings where there are any, and leave the plan of the house as it is.
For Soho, published UK figures put a three-bed house refurbishment at £43,530 to £110,350, and London houses usually cost more, with a London architect allowing £1,800 to £2,200 per square metre before VAT (Checkatrade and Bradley Van Der Straeten Architects, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Soho: we renew the wiring, pipework, heating, plaster, floors and joinery of the whole house under one contract, and a registered electrician certifies the rewire.
Price guide
| Work | Indicative range |
|---|---|
| Three-bed house refurbishment, UK average | £43,530 to £110,350 |
| Non-structural house refurbishment in London, per square metre, excluding VAT | £1,800 to £2,200 per square metre |
| Full rewire, two-bed to five-bed house | £4,500 to £10,500 |
| New heating system, three-bed house | £3,000 to £8,500 |
| Re-skim walls and ceilings, three-bed house | £5,000 to £12,500 |
Indicative ranges from published cost guides (Checkatrade, Bradley Van Der Straeten Architects and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026. Full breakdown: House Rewire Cost.
Quick estimate from UK guide figures
Guide range: choose above

Why a whole house is rare in Soho, and what one needs
A whole house to refurbish is the exception in Soho. The VOA, whose figures cover Fitzrovia West and Soho together, records 98% of homes there as flats and 2% as houses, and it puts 0% in the semi-detached or detached groups, so the houses that exist are terraced. It also dates 48% of those homes before 1919. A Soho house to refurbish is therefore likely to be a narrow period terrace over several floors, where the work is renewing what is there rather than adding space.
That shapes the scope before anything is priced. On a tall, narrow Soho house the heavy work stacks vertically: a rewire and replumb run through every floor, the stair carries all the materials, and the roof and chimney stacks are reached by scaffold rather than from a garden. We walk every floor with you, note the floors, joists, plaster and joinery room by room, and turn that into a schedule you can check line by line.
Housing in Soho
The Council Tax list puts the Fitzrovia West & Soho statistical area at about 6,840 homes, 98% flats against 2% houses; 48% went up before 1919, 5% between the wars and 47% after 1945. Where most homes are flats, where most homes in Soho are flats, a whole house is refurbished as one building, with a single intake for the services and one roof to keep sound.
Sash windows, front doors and roofs in the Soho Conservation Area
The outside of a Soho house is where the planning rules bite. The Soho Conservation Area was designated in 1969 and extended in 1976, 1979, 1983, 1990 and 2005, and in a Westminster conservation area some alterations need planning permission that would not need it elsewhere. Westminster has also removed permitted development rights in eight of its conservation areas, so ask your designer whether your street is in one before any window, door or roof covering is ordered.
Listing adds a second layer. The statutory list includes around 11,000 buildings and other structures in Westminster, and the council's conservation audits also name unlisted buildings of merit. If your Soho house is listed, internal work such as removing old plaster, joinery or fireplaces can need listed building consent too. For sash windows our default is repair: new cords, weights, beads and draught seals, with slim secondary glazing inside where the rules allow it.
Scaffold, skips and working hours on a Soho street
Refurbishing a Soho house means working on a busy, narrow street, so access is planned before the start date. Westminster needs a temporary structure licence for scaffolding, fencing or a cherry picker on the road or pavement, and its building site guidance keeps the footway at 1.5m wide or more around works. For roof and chimney repairs on a terraced front, the scaffold design has to fit that width, which can mean a gantry scaffold over the footway. Repairing or rebuilding a chimney stack shared with the house next door needs a party wall notice under the Party Wall Act: you serve it, and the work proceeds on the neighbour's written consent or an award.
Noisy work runs Monday to Friday 8am to 6pm and Saturday 8am to 1pm, and a Section 61 application is needed at least 28 days ahead for anything noisy outside those hours. Small projects sit at Level 4 of Westminster's Code of Construction Practice, expected to follow its principles without formal approval or fees, and a whole-house refurbishment is likely to count as one. In practice we bag waste on the day it is made, book collections and deliveries, and give the neighbours a dated programme.
Building control, certificates and the order of a Soho house job
Where a Soho house refurbishment includes work that goes to Westminster's building control, such as structural repairs, new drainage or renewed roofs and floors, the council must be told the start date at least 2 days before works begin. We sequence the house in the same order every time: strip out and open up, repairs to joists and plaster backgrounds, first fix of wiring and pipes, plastering in lime or gypsum to suit the wall, then second fix, joinery and decoration.
The paperwork at the end matters as much. Westminster issues a completion certificate only once all fees are paid and all relevant electrical and gas certificates have been supplied. A registered electrician tests and certifies the rewire, and an engineer on the Gas Safe Register commissions the boiler, so we collect both before the final inspection is booked. Where a roof, floor or wall is renewed, Part L can require that element to be insulated to current standards, and the building control surveyor checks it.
- Timber repairs where rot or beetle turns up at strip-out
- Whole-house rewires, certified at completion by a registered electrician
- New boiler, cylinder and radiators sized to every room, fitted by a Gas Safe registered engineer
VOA Council Tax stock of properties, March 2025, for the Fitzrovia West & Soho statistical area, which also covers west Fitzrovia. Counts rounded by the VOA.
The GS Renovation Difference in Soho
A Soho house is a one-off: tall, narrow, old and hemmed in by neighbours and traffic. We start with a walk through every floor, give you a written schedule of works and a programme that shows the noisy stages, and keep one contact running the trades from strip out to handover. Where you are living in the house, we phase the work floor by floor so there is always a working kitchen, bathroom and bedroom.
- Provisional sums for what lies behind the plaster shown as separate lines
- First fix cabling on each floor inspected by the electrician before the walls are closed
- A written scope and programme agreed before work starts
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about House Refurbishment Soho
Why do house refurbishment quotes in Soho differ so much?
Because they rarely price the same work. One quote includes making good, the electrician's certificate for the rewire and the Gas Safe sign-off on a new boiler; another leaves them as extras. Published UK figures of £43,530 to £110,350 for a three-bed house (Checkatrade, 2026) are a floor for London work. Compare Soho quotes line by line rather than by the total.
Are there many whole houses to refurbish in Soho?
Very few. The VOA counts 98% of homes in Fitzrovia West and Soho as flats and 2% as houses, all of them terraced. If you own one, expect a period building over several floors, with the work concentrated on services, plaster, floors, joinery and the roof rather than new space.
Do replacement windows on a Soho house need planning permission?
Check before ordering. Soho has its own conservation area, designated in 1969 and extended several times since, and in a Westminster conservation area some alterations need planning permission that would not elsewhere. Repairing the existing sashes, with new cords, beads and draught seals, avoids the question in many cases and keeps the original frames.
Does a listed house in Soho need consent for internal refurbishment?
Often, yes. Listed building consent covers works that affect the character of a listed building, inside as well as out, and the statutory list includes around 11,000 buildings and other structures in Westminster. Removing original plaster, panelling, stairs or fireplaces is the kind of work that needs it. Your designer applies; we build to the consent.
When must Westminster be told a Soho house refurbishment is starting?
At least 2 days before work starts, on the application form or by email. We confirm the start date with you and the building control surveyor so that the first inspection, usually of opened up floors or new drainage, can be booked around the programme.
What certificates do you need before Westminster signs off a house refurbishment?
The electrical and gas certificates. Westminster issues a completion certificate only once all fees are paid and all relevant electrical and gas certificates have been supplied. The registered electrician who did the rewire and the engineer on the Gas Safe Register who fitted the boiler issue them, and we collect both for you.
Can you refurbish a Soho house while the family lives in it?
Yes, in phases. We work floor by floor from the top down, keep one bathroom and a kitchen running, and seal each working floor behind dust screens. It takes longer than an empty house, so the programme shows each phase and which rooms you lose, and when you get them back.
What order does a whole house refurbishment run in?
Strip out first, then repairs, then first fix, plaster, second fix and finishes. Opening up shows the state of joists, plaster backgrounds and old pipework before anything new is committed. The wiring and pipes then go in while walls are open, plaster follows, and joinery, sanitaryware and decoration come last.
What EPC does a Soho house need before it is let again?
Band E or better, unless a valid exemption applies. Since 1 April 2018 a new tenancy cannot be granted at F or G, and since 1 April 2020 the same minimum has applied to lets that continue. A refurbishment is the time to add roof and floor insulation, a modern boiler and draught proofing to the sashes.
Every Service, One Team
More GS Renovation Services in Soho
One team for every GS Renovation service in Soho:
Same Service, Nearby Areas
House Refurbishment Near Soho
We carry out house refurbishment across Soho and the surrounding areas. Explore a nearby location:
Ready to Start Your Soho Project?
Free, no-obligation quote for house refurbishment in Soho.