Office Fit-Out Paddington
Office fit-outs for small and medium office suites in Paddington, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Paddington means two kinds of space: floors in the late Victorian and early 20th century buildings around the station, and suites in newer buildings towards Paddington Basin. Westminster's CAZ Class MA Article 4 Direction covers the Paddington Opportunity Area, which keeps its offices out of the office-to-home permitted development route. For a business taking, renewing or reshaping space here, the work is strip out, partitions, ceilings, lighting and power, meeting rooms, tea points and washrooms, carried out under the landlord's licence and Westminster's rules for non-domestic building work.
For Paddington, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Paddington: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Paddington offices: station buildings and Basin suites
The office floors in Paddington sit in two very different buildings. Westminster's Bayswater conservation area takes in the streets around Paddington Station, which the council describes as more commercial, with late Victorian and early 20th century buildings. Offices there tend to be upper floors and small suites with original walls, uneven floors, shallow ceiling voids and one shared stair. Cabling and ductwork have to find a route through the structure rather than above a grid ceiling.
In a newer building, such as those towards Paddington Basin, an office is usually delivered as a landlord's shell with raised floors, a ceiling grid and base building services. There the fit-out follows the landlord's tenant guide, which sets drawing approvals, contractor induction, loading bay slots and when noisy work may happen. We read that guide before pricing and build its requirements into the programme, because a missed approval step can stop work on site for days.
Cat A and Cat B in a Paddington office
Cat A is the landlord's base finish: a raised floor, a suspended ceiling, general lighting, heating and cooling, and working washrooms, with no partitions or furniture. Cat B is the tenant's layout on top of it: meeting rooms, glazed screens, a tea point, reception, small power to the desks and decoration. On a Paddington lease, check which of the two you are taking before you budget, because a Cat A floor still needs a full Cat B fit-out before your staff can move in.
In an older Paddington building the words fit less neatly. A floor near the station may come with neither a grid nor a raised floor, so the first stage is to create a base: overhaul the heating, rewire lighting and power, and form a ceiling void or dado trunking for cables. Your IT supplier specifies and terminates the data cabling, and we build the containment, the power and the comms room so their installers can work to the programme.
Building control and duties for a Paddington office refit
Westminster building control defines a fit out as alterations to an existing office or shop with no structural alterations. An office floor is covered by the Fire Safety Order, and Westminster allows a building notice only where the work is not affected by that order and does not change the layout, so a Paddington office refit goes as full plans. Westminster aims to reply on a full plans application within 5 weeks, so build that wait into the programme, because starting before approval risks rework if the plans change.
The drawings are checked against Part B for fire compartments, escape routes and alarm, Part M for accessible routes and WCs, and Part L for lighting and controls. Painting and decorating are not notifiable and come out of the estimated cost of works on which the fee is based. As a commercial client you also carry duties under the CDM Regulations, such as allowing enough time and resources, and we plan the site and paperwork so those duties can be met.
Why Paddington office space stays office space
Within the Paddington Opportunity Area, office floors cannot become homes under permitted development, which is the context for a fit-out here. Westminster's CAZ Class MA Article 4 Direction was made on 14 July 2021 and modified on 22 July 2022, and as modified it covers the Victoria, Paddington and Tottenham Court Road Opportunity Areas. The London Plan asks boroughs to use such directions so that the CAZ and other office clusters are not undermined by office to residential conversions.
For a tenant this is background rather than a hurdle: your fit-out keeps the floor in office use, which is what the direction protects. It matters more to a landlord deciding whether to refurbish a vacant floor in Paddington or seek another use. At the end of a lease the landlord's dilapidations schedule may require partitions, cabling and signage to be stripped out and the floor reinstated. We can price that reinstatement at the start, so the cost of leaving is known.
- Cat B office layouts built onto a landlord's Cat A floor
- Internal office signage and manifestation on glazed screens
- Tea points and kitchenettes on the existing risers
VOA Council Tax stock of properties, March 2025, for Paddington & St George's Fields and Bayswater East. Counts rounded by the VOA.
Trusted Office Fit-Out in Paddington
An office fit-out in Paddington has a landlord's rules, a fixed move-in date and a team that must keep working elsewhere until it is done. We read the lease and the tenant guide with you, prepare the programme and method statements that the landlord's licence needs, work to your designer's approved drawings, and coordinate our trades with your IT supplier and furniture installers. In an occupied building we keep noisy work to Westminster's normal hours and run quiet work after hours where the landlord agrees. We collect the fire alarm, emergency lighting and electrical certificates from the specialists who issue them.
- Lease reinstatement clauses read before any partition is fixed to the structure
- Fire alarm, emergency lighting and air conditioning specialists on one programme
- Itemised pricing, so you can see what every stage costs
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Paddington
How much does an office fit-out cost in Paddington?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
Does a Paddington office refit need full plans building control approval?
Yes, where Westminster is the building control body. Westminster allows a building notice only where the work does not affect the layout and is not affected by the Fire Safety Order, and an office is covered by that order. Its target for a full plans decision is 5 weeks, though it may take longer.
What does Westminster count as an office fit out?
Alterations to an existing office or shop where no structural alterations take place. That covers partitions, ceilings, lighting, power and washrooms. If the design adds a new stair, a floor opening or a cut through a structural wall, the job is no longer a simple fit out and needs a structural design first.
Is decoration included in the cost used for Westminster's building control fee?
No. Westminster says painting and decorating are not notifiable works and should be left out, along with VAT, of the estimated cost of works. We split those items out of our price so the figure used for the application covers only the regulated work, which keeps the fee in proportion.
Can the fit-out in a Paddington office building run outside working hours?
Quiet work often can, where other tenants are working on the floors above and below. The landlord's building rules set when drilling and cutting may happen. For noisy work outside Westminster's normal hours of 8am to 6pm on weekdays and 8am to 1pm on Saturday, a Section 61 application is needed at least 28 days ahead. Where homes are nearby, that consent is rarely granted.
Could a Paddington office floor be converted to flats under permitted development?
Not within the Paddington Opportunity Area. Westminster's modified CAZ Class MA Article 4 Direction covers the Victoria, Paddington and Tottenham Court Road Opportunity Areas, removing the right to change Class E space to homes without a planning application. For an office tenant this changes nothing about the fit-out itself.
What is the difference between a Cat A and a Cat B fit-out?
Cat A is the landlord's base: raised floor, suspended ceiling, general lighting, heating and cooling, and washrooms. Cat B is the occupier's own layout on top, with meeting rooms, glazed partitions, a tea point, desk power and finishes. A Cat A floor still needs Cat B work before you can use it.
Who installs the data cabling in an office fit-out in Paddington?
Your IT supplier, working to their own specification. We build the containment, floor boxes, comms room power and cooling, and give their installers access at the right stage of the programme. Agreeing that stage early keeps ceilings and floors from being reopened after they are finished.
Do we have duties as the client for an office fit-out?
Yes. Under the CDM Regulations a commercial client must make suitable arrangements for managing the project, including allowing enough time and resources and providing information about the building, such as any asbestos survey. We prepare the construction phase plan and run the site to it, and we tell you what information we need from you.
Every Service, One Team
More GS Renovation Services in Paddington
One team for every GS Renovation service in Paddington:
Same Service, Nearby Areas
Office Fit-Out Near Paddington
We carry out office fit-out across Paddington and the surrounding areas. Explore a nearby location:
Ready to Start Your Paddington Project?
Free, no-obligation quote for office fit-out in Paddington.