Office Fit-Out Marylebone
Office fit-outs for small and medium office suites in Marylebone, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Marylebone means fitting out workspace around Baker Street, Marylebone Road and Marylebone station. The space ranges from a floor above a shop or a small suite in a converted townhouse to a floor in a purpose-built block, and the tenant may be a professional practice or a small firm. The work is partitions, ceilings, lighting, power, tea points and WCs, fitted under the landlord's licence and Westminster's building control.
For Marylebone, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Marylebone: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Where office space sits in Marylebone
Office space in Marylebone sits in mixed streets rather than a business park. Around Baker Street and Marylebone station it takes several forms: offices above shops, suites in divided townhouses and floors in larger buildings. Each type has its own access, lift and riser limits. A townhouse suite may have one narrow stair and no lift, so partitions, ceiling grid and plant come in by hand and the programme allows for it.
Planning keeps that office stock in use. Westminster's Article 4 Direction removing Class E to C3 rights in the Central Activities Zone was made on 14 July 2021 and modified by the Secretary of State on 22 July 2022. Marylebone Road and Marylebone High Street are named CAZ Retail Clusters covered by it. For an office tenant this is background, not a task: on those streets a change to homes needs a planning application rather than the permitted route. The fit-out question is simply how to make that space work for you.
Cat A and Cat B in a Marylebone office, in plain terms
Cat A is the landlord's base finish: a clean floor with a suspended ceiling, lighting, raised floor or trunking for power, heating and cooling, and working WCs, with no rooms built. Cat B is the tenant's layer on top: partitions and glazed screens, meeting rooms, a tea point or kitchenette, small power where the desks go, data containment for your IT supplier to cable, decoration and internal signage. In a Marylebone period building the Cat A may be thin or missing, so part of it falls to the tenant.
Agree the split in writing before pricing. The lease or the agreement for lease says what the landlord hands over and what you must fit, and it often names the landlord's surveyor who approves drawings. We price Cat B against that base, flag gaps such as an old distribution board or a ceiling that cannot take new lights, and give you one programme from strip out to handover. Where a floor has been let before, strip out of the previous tenant's fit-out is the first stage.
Building regulations for a Marylebone office fit-out
Westminster building control defines a fit out as alterations to an existing office or shop where no structural alterations take place, and a Marylebone office refit usually sits in that category. The rules that bite are Part B, for fire compartments, escape routes, doors and alarms, Part M, for access and the accessible WC, and Part L, for efficient lighting and controls. New partitions can lengthen an escape route or block a corridor, so the layout is checked against the fire strategy before walls are set out.
An office in use by staff is covered by the Fire Safety Order, and Westminster allows a building notice only where work does not affect the layout and is not affected by that order. A Marylebone office fit-out therefore goes in as full plans, and Westminster aims to reply within 5 weeks, though it says it may take longer. Its worked example for a non-structural fit out of three storeys of an office shows the charges split into a plan charge and an inspection charge. Painting and decorating are not notifiable and stay out of the estimated cost.
Licence, occupied floors and lease end in Marylebone
The landlord's licence for alterations comes first: drawings, a method statement and a programme go to the landlord's surveyor before anything is stripped out. In a Marylebone building with other tenants still working, noisy work stays within Westminster's standard hours of Monday to Friday 8am to 6pm and Saturday 8am to 1pm. Noisy construction outside those hours needs a Section 61 application at least 28 days ahead. With homes nearby it is rarely granted, so drilling stays in the day and quiet work fills the evenings.
A business commissioning an office fit-out is a client under the CDM Regulations, with duties of its own. It must allow enough time and resources, supply information about the building, and appoint a principal designer and principal contractor where more than one contractor is involved. We plan and manage the site as contractor and tell you what the client role needs. At lease end, dilapidations and reinstatement may require the Cat B to come out and the space to go back to its base condition, and we price that work too.
- Office fit-out and refurbishment for small and medium office suites
- Decoration and making good to a move-in standard
- Dilapidations and reinstatement works at the end of an office lease
VOA Council Tax stock of properties, March 2025, for Marylebone & Park Lane and Bryanston & Dorset Square. Counts rounded by the VOA.
Working With GS Renovation in Marylebone
An office fit-out is judged on the day your staff move in. We work to your designer's drawings and the landlord's fit-out rules, get the partitions set out against the fire strategy before building control inspects, and coordinate the containment so your IT supplier can cable without delay. Noisy stages are timed around the other tenants, and the handover pack holds the electrical certificates and the records the landlord's surveyor will ask for at lease end.
- Founder with 30+ years of hands-on experience
- Data cable routes agreed with your IT supplier before partitions are boarded
- Full plans building control coordinated for the new office layout from the outset
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Marylebone
What should a business budget for an office fit-out in Marylebone?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Marylebone quote follows a survey of the space.
What is the difference between Cat A and Cat B for a Marylebone office?
Cat A is the landlord's base: ceiling, lighting, heating and cooling, floor finish and WCs, with an open floor. Cat B is what you add to make it your office: meeting rooms, glazed screens, a tea point, desk power, data containment and decoration. In older Marylebone buildings the base can be incomplete, so check the lease before assuming what is included.
Can a Marylebone office refit go in as a building notice?
No, if the office is a workplace. Westminster allows a building notice only where the layout is unaffected and the Fire Safety Order does not apply, and an office in use by staff falls under that order. A full plans application gives the fire strategy, escape routes and alarm design a formal check before the partitions go up.
How long does Westminster take to check plans for an office fit-out?
Westminster aims to contact applicants within 5 weeks with a decision on a full plans application, but says it may take longer. We build that time into the programme, and carry out the survey and any permitted strip out while the plans are being checked, so the site is ready when approval arrives.
Is decoration counted in the building control cost for a Marylebone office?
No. Westminster building control says painting and decorating are not notifiable works and should be left out of the estimated cost of works, along with VAT. We split decoration from the notifiable items in our quote, so the building control application for your Marylebone office is based on the right figure.
Can office fit-out work in Marylebone run at night or at weekends?
Quiet work, yes. Noisy work, rarely. Westminster's standard hours for noisy work are Monday to Friday 8am to 6pm and Saturday 8am to 1pm. Noisy construction outside them needs a Section 61 application at least 28 days before it starts, and with homes nearby it is rarely granted. Quiet work such as second fix and decoration is easier to schedule out of hours in an occupied building.
Could a Marylebone office building be turned into flats instead?
Not through the office to home permitted development route on the protected streets. Marylebone Road and Marylebone High Street are named CAZ Retail Clusters covered by Westminster's modified Class MA Article 4 Direction, so a change to homes there needs a full planning application. For a tenant, that points to the space staying in office use.
What happens to the fit-out when an office lease ends?
The lease decides. A lease can require the tenant to remove its alterations and hand back the space in its original condition, known as reinstatement, and the landlord can claim dilapidations for repairs left undone. We can price the strip out and reinstatement against the lease schedule, so you know the likely scope before you negotiate with the landlord.
What do the CDM Regulations ask of a business fitting out a Marylebone office?
It makes the business a client with duties of its own. You must allow enough time and resources, pass on information about the building, and appoint a principal designer and principal contractor where more than one contractor works on the project. We explain what the role involves at the start and run the site safely as contractor.
Every Service, One Team
More GS Renovation Services in Marylebone
One team for every GS Renovation service in Marylebone:
Same Service, Nearby Areas
Office Fit-Out Near Marylebone
We carry out office fit-out across Marylebone and the surrounding areas. Explore a nearby location:
Ready to Start Your Marylebone Project?
Free, no-obligation quote for office fit-out in Marylebone.