Office Fit-Out Pimlico

Office fit-outs for small and medium office suites in Pimlico, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.

Pimlico is a residential district, so office fit-out here is small in scale. The work that does arise is a professional suite on an upper floor above a shop in one of the Local Centres, such as Lupus Street or Moreton Street, or a studio or practice in a converted stucco building. Office fit-out in Pimlico means working inside those buildings, often with residents on the floors above or beside.

For Pimlico, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Pimlico: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.

Price guide

WorkIndicative range
Office fit-out, construction only£70 to £120 per sq ft
London office fit-out, all-in£148 to £359 per sq ft
Metal stud partition, boarded both sides£55 to £65 per m²
Suspended ceiling, grid and tile£22 to £35 per m²
Dilapidations at lease end£15 to £20 per sq ft

Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

A test meter like this checks each new circuit before the electrician certifies it, illustrating office fit-out in Pimlico.
A test meter like this checks each new circuit before the electrician certifies it.

What office space in Pimlico actually looks like

Office space in Pimlico is mostly small, and the fit-out has to suit that. Lupus Street, Moreton Street and Pimlico are named Local Centres in Westminster's modified Class MA Article 4 Direction, and the floors above their shops are one place small offices sit. A suite may be one or two rooms reached by a shared stair, with the residential floors above it and a shop below. Where there is no lift or loading bay, that shapes every part of the programme.

That context explains why the office stock is protected. The Article 4 Direction removes the permitted development right to turn Class E space, which includes offices, into homes in those centres, and London Plan Policy E1 asks boroughs to stop office clusters being undermined by office to residential rights. For an office tenant this is background, not a task: it means the space is expected to stay in commercial use, and a Pimlico fit-out is planned on that basis.

Cat A, Cat B and the landlord's licence in Pimlico

Most fit-outs are described as Cat A or Cat B, and it helps to know which you are buying. Cat A is the landlord's base finish: suspended ceilings, raised floors where the building has them, lighting, heating and cooling, and finished WCs, ready for a tenant. Cat B is the tenant's own layout on top: partitions and glazed screens, meeting rooms, a tea point or kitchenette, reception, small power, decoration and signage inside. Knowing which you need sets the scope and the price.

In a Pimlico building the landlord's licence for alterations comes before any of it. The licence usually asks for drawings, a method statement and the contractor's details, and it sets what must be reinstated when the lease ends. We coordinate data cabling routes with your IT supplier so containment goes in before ceilings close. At lease end, dilapidations work strips the Cat B items and returns the suite to the condition the licence describes.

Building control for a Pimlico office suite

An office fit-out in Pimlico usually needs building regulations approval, because new partitions change the means of escape. Westminster runs its own building control service, the District Surveyors Building Control Service, and defines a fit out as alterations to an existing office or shop where no structural alterations take place. Its worked example for a non-structural office fit out shows full plans with separate plan and inspection charges, which your budget should allow for. Where a wall is removed, a structural engineer's calculations come first.

The route matters. Westminster says a building notice can be used only where the work does not affect the layout and is not affected by the Fire Safety Order, and an office is covered by that Order. So new partitions go in on full plans. The drawings deal with Part B fire and means of escape, Part M access to the suite and its WC, and Part L for new lighting and services. Painting and decorating are not notifiable and are left out of the estimated cost.

Working in an occupied Pimlico building

Most Pimlico office suites share a building with shops or homes, so the programme is built around them. Noisy work runs within Westminster's normal hours, Monday to Friday 8am to 6pm and Saturday 8am to 1pm. Outside those hours Westminster wants a Section 61 application at least 28 days before works start. Quiet tasks such as second fix, cabling and decoration can run later, but only with the building's agreement.

A commercial client also has duties of its own under the CDM regulations, including making sure the work is properly planned and that the right information reaches the team. We help you meet them, prepare the construction phase plan and manage the site. Deliveries to a Pimlico upper floor come up a shared stair, so materials arrive in small loads, and the common parts are protected until the suite is handed over.

  • Tea points and kitchenettes on the existing risers
  • Metal stud office partitions boarded both sides
  • Quiet work after hours in occupied offices, noisy work within the council's hours
Service areaPimlico · SW1
Local authorityWestminster City Council
Part ofCentral London (Inner London)
Typical homesWhite-stucco early Victorian terraces and garden squares, most of them now flats (94% of homes)
Housing stock55% built before 1919, 10% interwar, 34% post-war; 94% flats, 6% terraced, 0% semi-detached or detached
Also covered nearbyBelgravia, Vauxhall, Chelsea, Mayfair and Kennington

VOA Council Tax stock of properties, March 2025, for Pimlico North and Pimlico South. Counts rounded by the VOA.

Trusted Office Fit-Out in Pimlico

We fit out small offices as one managed job, from strip out and partitions to ceilings, lighting, WCs and decoration, so the business deals with one team. The programme is set around the landlord's licence, building control and the other occupiers of the building. A registered electrician installs and certifies the lighting and small power, and we coordinate data routes with your IT supplier. We build to your designer's drawings and the consents they obtain.

  • Fire alarm, emergency lighting and air conditioning specialists on one programme
  • Rated 4.9 from 31 reviews on MyBuilder
  • Asbestos survey checked before any office ceiling, floor tile or boxing is disturbed
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Office Fit-Out Pimlico

Why do office fit-out quotes in Pimlico vary so much?

Because the scope differs. One quote covers only partitions and ceilings; another includes fire alarm changes, lighting, data containment, the tea point and out-of-hours working. Published guides give £70 to £120 per square foot for the construction element (Oktra, 2026). Compare quotes against the same written scope.

What is the difference between Cat A and Cat B for a Pimlico office?

Cat A is the landlord's base fit-out and Cat B is the tenant's layout. Cat A gives a usable shell with ceilings, lighting, heating and WCs. Cat B adds partitions, meeting rooms, a tea point, finishes and signage. In a small Pimlico suite the two are often done together, so the lease should say who pays for which part.

Does an office fit-out in Pimlico need building regulations approval?

Usually yes. Westminster defines a fit out as alterations to an existing office or shop where no structural alterations take place, and it still falls under building control. Because an office is covered by the Fire Safety Order, Westminster says a building notice cannot be used, so the application goes in as full plans.

How long does Westminster take to decide full plans for a Pimlico office?

Allow five weeks or more. Westminster building control aims to contact applicants within 5 weeks with a decision on a full plans application, but says it may take longer. We use that period for the landlord's licence, lead times on glazed screens and booking deliveries with the building.

Can office fit-out work in Pimlico run at night or at weekends?

Quiet work can, noisy work needs consent. Westminster's normal hours for noisy construction are Monday to Friday 8am to 6pm and Saturday 8am to 1pm, and it asks for a Section 61 application at least 28 days ahead for noisy work outside them. In a building with flats it is rarely granted. Quiet evening work, such as decoration and second fix, still needs the landlord's agreement.

Can a Pimlico office above a shop be turned into a flat without planning permission?

Not in the named Local Centres. Lupus Street, Moreton Street and Pimlico are Local Centres covered by Westminster's modified Class MA Article 4 Direction, which removes the right to change Class E space to homes there. That is the owner's matter rather than a tenant's, and it is why the office floors are expected to stay in business use.

What does a Pimlico office tenant owe at the end of the lease?

Usually reinstatement and dilapidations. The licence for alterations normally says which of your Cat B items must be removed and what condition the suite goes back in. We price the strip out, making good and redecoration against that schedule, and keep a record of the works so the handback can be agreed with the landlord's surveyor.

Who has CDM duties on an office fit-out in Pimlico?

The business commissioning the work does, as the client. The CDM regulations give commercial clients duties to make sure the project is planned and managed and that information is passed on. We take the contractor's role, prepare the construction phase plan and run the site, and help you meet your own duties. Westminster building control is told the start date at least 2 days beforehand.

Is decoration counted in building control costs for a Pimlico office fit-out?

No. Westminster building control says painting and decorating are not notifiable works and should be excluded, along with VAT, from the estimated cost of works. Our quotation lists the notifiable items separately from the decoration, so the estimate given to building control is straightforward to prepare.

Ready to Start Your Pimlico Project?

Free, no-obligation quote for office fit-out in Pimlico.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote