Flat Conversions Pimlico

Houses divided into self-contained flats in Pimlico, separating floors, a protected stair and separate services for every flat.

Few houses in Pimlico are left to split: 94% of homes here are already flats, and the 6% that are houses are terraced. So flat conversion work in Pimlico can mean reworking an older conversion inside a stucco townhouse or joining flats back into one home, as well as dividing a house for the first time. Dividing a house always needs planning permission, and the new flats are tested against London's space standards and the building regulations for separation between flats.

In Pimlico, converting a house into two or three flats is published at £50,000 to £120,000 including professional and council fees, and an England-wide guide puts a straightforward two-flat split at £40,000 to £80,000 in construction alone, which is the part a builder prices (indicative London ranges, Architectural Drawings and Mayfair Studio, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Pimlico: we build the conversion to the approved drawings, building control inspects the fire and sound separation, and a registered electrician certifies each flat's electrics.

Price guide

WorkIndicative range
House into 2 to 3 flats in London, fees and build (Architectural Drawings)£50,000 to £120,000
Build cost per square metre, London (Architectural Drawings)£1,000 to £2,000
House into 2 flats, construction only, England-wide guide (Mayfair Studio)£40,000 to £80,000
Sound insulation and fire separation, England-wide guide (Mayfair Studio)£5,000 to £15,000
Separate utility connections, 3 flats, London (Architectural Drawings)£3,000 to £6,000

Indicative ranges from published cost guides (Architectural Drawings and Mayfair Studio, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.

Quick estimate from published guides

Guide range: choose above

A steel beam fully boxed in fire-rated board by GS Renovation and waiting for its skim coat
A steel boxed in and ready to skim. In a building of flats, the encasement is part of the fire separation, not decoration.

Planning a house into flats in Pimlico

Turning a Pimlico house into flats needs planning permission, because it is a material change of use that creates new dwellings. The application is judged against Westminster's City Plan, whose current version was adopted on 21 January 2026 after a Partial Review, and against the Pimlico Neighbourhood Plan, adopted on 7 December 2022. Your designer reads both before fixing the number and mix of flats, and in particular any policy on keeping family sized homes.

Two further planning points follow from new homes. Westminster charges CIL per square metre on new dwellings of any size, so the levy is part of the budget from the first sketch. The London Plan also counts residential conversions among the forms of small site intensification where they add housing. Where the house is in the Pimlico Conservation Area, external changes such as new entrances or meter boxes on the front are drawn with the council's conservation rules in mind.

Housing in Pimlico

Pimlico has around 10,180 homes on the Council Tax list: 34% post-war, 10% interwar and 55% predate 1919, with 94% flats and 6% houses. Since most homes here are flats, a flat in Pimlico can be split or combined only with the freeholder's consent, and changing the number of homes usually needs planning permission as well.

Space standards for new flats formed in Pimlico

New flats carved out of a Pimlico house must meet the London Plan's minimum sizes. Policy D6 applies its space standards to every tenure, and counts conversions and changes of use as new dwellings. A single bedroom needs 7.5 square metres and 2.15m of width, and a double or twin 11.5 square metres. Narrow rear rooms can fail the width test first, so the stair position drives the plan. Your designer tests each proposed flat before the layout is fixed.

Height is tested as well. D6 wants 2.5m from floor to ceiling across at least 75 per cent of the internal area of each new flat. The main floors of a stucco townhouse tend to clear that, while a top floor under the roof slope or a low lower ground floor may fall short. D6 also asks for dual aspect flats where possible and, where Westminster sets no higher standard, private outdoor space of at least 5 square metres for a one or two person flat. Your designer measures each level of the Pimlico house first.

Fire and sound separation between flats in a Pimlico conversion

Separation under Part B is the heart of the building work in any Pimlico conversion. Each new flat becomes its own fire compartment, so the floors and walls between flats are upgraded to the fire resistance the approved design sets and building control agrees. In a stucco townhouse that usually means new fire-rated ceilings under the old joists, fire-resisting doors onto a protected stair, and linked detection in the common parts. Every pipe and cable that passes through a separating floor is fire stopped before the ceiling is closed, because a gap there defeats the whole compartment.

Sound is the other half, because each flat sits on top of another. Approved Document E asks converted flats to reach 43 dB airborne sound insulation through separating walls and floors and no more than 64 dB impact sound through floors. In a timber floored Pimlico townhouse that usually means a new ceiling on resilient bars, insulation between joists and an upgraded floor. Pre-completion sound tests are booked before decoration, while any remedial work is still easy to do.

Services, addresses and party walls for Pimlico flats

Each new flat in a Pimlico conversion needs its own services, so the utility work starts early. That means separate electricity and gas meters where gas is kept, a water supply and drainage for each kitchen and bathroom, and new postal addresses through the council's street naming and numbering. Meter positions in a stucco front are awkward, so they are often placed in the lower ground floor or the entrance hall.

A registered electrician installs and certifies each new supply, and Westminster's policy is to issue the completion certificate only once all fees are paid and all electrical and gas certificates are supplied. Where a party wall is cut into for new steels or fire stopping, the Party Wall Act applies, and the building owner serves the notices on the neighbours. New openings are built to a structural engineer's design, and the party wall work goes ahead on the neighbour's written consent or under an award.

  • Common hallway, stair and entrance finishes
  • Splitting a large flat in two, or joining two flats into one
  • Steel beams and new openings built to the engineer's design
Service areaPimlico · SW1
Local authorityWestminster City Council
Part ofCentral London (Inner London)
Typical homesWhite-stucco early Victorian terraces and garden squares, most of them now flats (94% of homes)
Housing stock55% built before 1919, 10% interwar, 34% post-war; 94% flats, 6% terraced, 0% semi-detached or detached
Also covered nearbyBelgravia, Vauxhall, Chelsea, Mayfair and Kennington

VOA Council Tax stock of properties, March 2025, for Pimlico North and Pimlico South. Counts rounded by the VOA.

Trusted Flat Conversions in Pimlico

We build conversions as one managed job, from strip out and structural work to the fire and sound separation and the finished flats, so the owner has one team answering for the sequence. Your designer or agent handles planning, and we build to the consent and supply the programme and construction details they need. New openings or stairs are built to a structural engineer's design, and a registered electrician certifies the new supplies for each flat.

  • Common parts, bin stores and cycle stores finished to the planning conditions
  • Aftercare and snagging support once the job is finished
  • Full plans application to building control, never a building notice
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Flat Conversions Pimlico

Why do flat conversion quotes in Pimlico vary?

Because the scope differs. One includes separating floors built to pass the sound test, a protected stair, separate meters and fire stopping; another prices them as extras. The England-wide guide of £40,000 to £80,000 in construction for a straightforward two-flat split (Mayfair Studio, 2026) is a starting point. Compare Pimlico quotes against the approved drawings.

Does converting a Pimlico house into flats need planning permission?

Yes, always. Splitting a house into self-contained flats is a material change of use, and the application is judged against Westminster's City Plan, adopted in its current form on 21 January 2026, and the Pimlico Neighbourhood Plan. Your designer or agent makes the application. We price and programme the build once the approved drawings are available.

What room sizes does a new flat in a Pimlico conversion need?

London Plan Policy D6 sets the minimums: 7.5 square metres and 2.15m width for a single bedroom, and 11.5 square metres for a double or twin. National guidance places the space standard in planning rather than the building regulations, so your designer checks it when the application is prepared.

What fire separation is needed between flats in a Pimlico conversion?

Part B of the building regulations treats each new flat as a separate fire compartment. The floors and walls between flats, the flat entrance doors and the shared stair are built to the fire resistance set in the approved design and agreed with building control. We fire stop every service penetration before ceilings close, and building control inspects it.

Do new flats in a Pimlico conversion need sound testing before completion?

Yes. Flats formed by conversion must meet Approved Document E, which sets 43 dB airborne insulation for separating walls and floors and 64 dB maximum impact sound for floors. We book the tests once ceilings and floors are finished but before decoration. If a test fails, the remedial work is simpler while the rooms are still bare.

Is CIL payable when a Pimlico house is converted into flats?

It can be. Westminster charges CIL per square metre on new dwellings of any size, and on development where the internal area of a new building, extension or change of use exceeds 100 square metres. Your designer or agent confirms the liability with the council before work starts, because it has to be settled at the right point in the process.

How much outdoor space does a new Pimlico flat need?

Where the borough sets nothing higher, London Plan Policy D6 asks for 5 square metres of private outdoor space for a one or two person flat, plus 1 square metre per extra occupant. In a Pimlico townhouse that can mean a yard or terrace allocated to specific flats on the drawings.

Can flats in a Pimlico townhouse be joined back into one house?

Yes, but treat it as a planning question first. Joining flats reduces the number of homes, and in most London boroughs that needs planning permission, so your designer checks Westminster's current policy before drawing it. The building work removes the separating floor or wall on steel sized by a structural engineer, and combines the services and meters.

Who serves party wall notices on a Pimlico flat conversion?

The building owner does, or their surveyor on their behalf. The Party Wall Act applies where a conversion cuts into a party wall for steels, flues or fire stopping. We give the surveyors the method and programme they need, and the work goes ahead on the neighbour's written consent or an agreed award, so the neighbours in the terrace know what to expect.

Ready to Start Your Pimlico Project?

Free, no-obligation quote for flat conversions in Pimlico.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote