Office Fit-Out Kennington
Office fit-outs for small and medium office suites in Kennington, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Kennington is small office work, and it is honest to say so. Kennington is known for its housing, post-war estates around Georgian and Victorian squares, rather than for office blocks. The office work here tends to be a suite above a shop on Kennington Road, a studio in a converted building or professional rooms near the Oval. We strip out and fit out those spaces with partitions, ceilings, lighting, power, tea points and WCs, working to the landlord's licence and to Lambeth building control's commercial process.
For Kennington, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Kennington: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

What office space in Kennington actually looks like
Expect small spaces rather than whole office floors in Kennington. The area is mainly housing, post-war council estates around Georgian and Victorian squares. The office space among it is more likely to be one or two rooms above a ground floor shop, a former house used as professional rooms, or a studio in a mixed building. A fit-out in that setting has neighbours on every side, a shared street door, and often no lift, which shapes delivery sizes and working hours.
Lambeth's three Modified Article 4 Directions withdrawing Class MA commercial to residential rights came into force on 28 October 2022, which makes office use more secure in the places they cover. For a tenant the practical questions are closer to hand. A Kennington suite above a shop often shares its electricity supply, water and fire alarm with the unit below, and the landlord decides who may alter them. We establish at survey which services are yours, which are shared and which are the landlord's, because that sets what the fit-out can change and who signs it off.
Cat A and Cat B in a small Kennington office
Cat A and Cat B describe how far the landlord has taken the space before a Kennington tenant moves in. Cat A is the landlord's base: finished ceilings, lighting, heating and cooling, raised floors or perimeter trunking, and working WCs. Cat B is the tenant's layout on top: partitions and glazed screens, meeting rooms, a tea point or kitchenette, extra small power, signage inside and the decoration that makes it your office.
Small suites above shops rarely come as a clean Cat A shell. Often the job starts with strip out of the last tenant's partitions and carpet tiles, then new lighting and power to current standards, then the Cat B layout. We coordinate the data cabling routes and containment with your IT supplier, so their engineer arrives to a finished route and the cabinet position agreed. In a Kennington suite without a raised floor, power and data usually run in perimeter trunking or through the ceiling void.
Building control, fire escape and access for a Kennington office
Office fit-out work in Kennington that is building work goes through Lambeth's commercial route. Building works to commercial properties require a full plans application, ideally sent at least five weeks before work starts, and Lambeth uses those plans to consult other authorities such as the fire authority. New partitions can change travel distances and escape routes, so the drawings settle Part B means of escape, fire doors and alarm coverage before any stud goes up.
Part M access and Part L lighting and services follow the same plans. A new WC or shower may need to be accessible, and new lighting has to meet efficiency and control requirements. Within three working days of receiving an application, Lambeth building control sends a letter confirming whether it can process it, and you arrange the first inspection with its surveyor at least two days before work begins. We build those dates into the Kennington programme.
Licences, occupied buildings and dilapidations in Kennington
A Kennington office tenant needs the landlord's licence for alterations before partitions, ceilings or services change. The licence often fixes working hours, contractor details and what must be reinstated at lease end. As a commercial client you also have duties under the CDM Regulations: appointing competent contractors, allowing time for the work and providing information about the building, such as any asbestos survey. We give you a construction phase plan for the job.
In an occupied building, noisy strip out and drilling are planned around the other occupiers, and Lambeth allows construction work Monday to Friday 8.00am to 6.00pm and Saturday 8.00am to 1.00pm. At the end of a Kennington lease, dilapidations can mean removing your partitions and cabling and returning the space to its original state. We photograph and record the space before the fit-out, so the reinstatement scope is clear when the lease ends.
- Dilapidations and reinstatement works at the end of an office lease
- Strip-out of the previous tenant's office, with disposal
- Data containment laid for your IT supplier to cable
VOA Council Tax stock of properties, March 2025, for Lambeth Walk & North Kennington and Oval. Counts rounded by the VOA.
Working With GS Renovation in Kennington
A small office fit-out lives or dies on the programme, because rent often starts before the space is usable. We work backwards from Lambeth's building control dates, agree access with the landlord and the other occupiers, and run strip out, partitions, ceilings, lighting, power and decoration under one site lead. Your IT supplier gets a clear date and a finished cable route, and you get one contact from survey to handover.
- Waste cleared as we go, not left piled up outside
- One named contact for the landlord, the building manager and your office manager
- Fire alarm, emergency lighting and air conditioning specialists on one programme
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Kennington
What should a business budget for an office fit-out in Kennington?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Kennington quote follows a survey of the space.
Is there much office space to fit out in Kennington?
Not a great deal, and it is small in scale. Kennington is mostly known for its housing rather than office blocks, so the office space that comes up is suites above shops on roads such as Kennington Road, professional rooms and studios. Those are the fit-outs we carry out here, rather than whole office floors in a business district.
Does a Kennington office fit-out need a full plans application?
Where it involves building work, yes. Lambeth building control says building works to commercial properties require a full plans application, ideally sent at least five weeks before work starts. The approved plans then govern fire doors, escape routes, accessible WCs and lighting. Your designer prepares the application and we build to it.
What is the difference between Cat A and Cat B fit-out?
Cat A is the landlord's base finish: ceilings, lighting, heating and cooling, floors and WCs, ready for any tenant. Cat B is the tenant's own fit-out on top: partitions, meeting rooms, tea points, extra power and data routes, signage and decoration. Many small suites need a partial Cat A before the Cat B work begins.
Why does Lambeth consult the fire authority on a Kennington office?
Lambeth uses commercial full plans to consult other authorities in the borough, such as the fire and water authorities. New partitions, a meeting room with no window or a kitchenette can change escape routes and fire risk, so the fire authority's comments feed into the approved plans before work starts on the Kennington suite.
Can office work in Kennington be done outside working hours?
Quiet work can, noisy work generally cannot. Lambeth allows construction and building work Monday to Friday 8.00am to 6.00pm and Saturday 8.00am to 1.00pm, and not on Sundays or bank holidays. In a Kennington building with flats above, we keep evening and weekend visits to quiet tasks such as decorating and cable pulling, where the landlord allows it.
When is the first building control inspection booked for a Kennington office?
Before work begins. Within three working days of receiving an application, Lambeth building control sends a letter confirming whether it can process it, and you arrange the first inspection with its surveyor at least two days before work starts. We put both dates into the programme, so strip out does not begin before the surveyor has been booked for the Kennington suite.
What are dilapidations at the end of an office lease?
Dilapidations are the repairs and reinstatement a lease requires when you leave, such as removing partitions, making good walls and ceilings, and returning services to their original layout. The scope comes from the lease and the licence for alterations. We record the space before the fit-out so the end-of-lease work can be priced clearly.
What duties does an office client have under CDM?
A commercial client must make suitable arrangements for managing the project, allow enough time and resources, and give the contractor the information it holds about the building, including any asbestos survey. We prepare the construction phase plan and manage the site day to day, but the client duties stay with the business commissioning the work.
Every Service, One Team
More GS Renovation Services in Kennington
One team for every GS Renovation service in Kennington:
Same Service, Nearby Areas
Office Fit-Out Near Kennington
We carry out office fit-out across Kennington and the surrounding areas. Explore a nearby location:
Ready to Start Your Kennington Project?
Free, no-obligation quote for office fit-out in Kennington.