Office Fit-Out Hayes
Office fit-outs for small and medium office suites in Hayes, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Hayes can mean an upper floor above shops in Hayes District Centre, a small suite elsewhere in UB3 or UB4, or space inside the Hayes Opportunity Area. Hillingdon counts the district centre as one of the two largest of its five. The work we do here is at the small end: partitions, ceilings, lighting, a tea point and WCs for a firm taking or reworking its own space, built to the landlord's licence and non-domestic building regulations.
For Hayes, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hayes: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

What office space in Hayes looks like to a fit-out builder
The office work that reaches a builder of our size in Hayes is small units, not headquarters floors. Hillingdon names Hayes District Centre as one of the two largest of its five district centres, and the office space to expect around it is on upper floors above shops, often reached by its own door and stair. Small professional suites and studios make up the rest. Each suggests a different fit-out, from a two room refresh to a whole floor stripped back.
The first question on a Hayes office is what the landlord hands over. A Cat A space has finished ceilings, lighting, heating and cooling and raised floors or perimeter power, ready for a tenant to plan. Cat B is the tenant's own layout on top: meeting rooms, glazed screens, a tea point, data points and finishes. Older rooms above shops often have neither, so the fit-out starts with basic services before any layout can be set.
Hayes offices and the Class MA Article 4 Direction
Hillingdon has limited office to home conversion in parts of the borough, including Hayes. On 14 July 2022 it confirmed a non-immediate Article 4 Direction removing permitted development rights to change from commercial, business and service uses to dwellinghouses. The direction first came into force on 24 September 2022. The Secretary of State then reduced its area, and the modified direction came into effect on 27 March 2024, with a map covering the Hayes Opportunity Area.
Inside that area, turning offices into homes needs full planning permission rather than prior approval. A separate strategic employment land direction has required planning permission for a change to residential in its identified locations since 22 November 2017. For a business fitting out an office in Hayes, the direction matters mainly as context. The building's lawful use stays commercial, which is the planning starting point for a tenant reworking the space for its own staff.
Building regulations for office work in Hayes
Office fit-out in Hayes is non-domestic work under the Building Regulations wherever it is building work. New partitions can change escape routes and fire separation under Part B, new WCs and entrances bring in Part M access, and new lighting and services fall under Part L. A Hillingdon full plans application covers domestic or commercial works and needs detailed plans and structural calculations. On a full plans application you will normally receive a formal decision within 5 weeks.
A building notice cannot be used for work on premises covered by the fire safety order, which includes offices, so a Hayes office goes through full plans. Hillingdon does not issue plans approval on a building notice in any case. If a previous tenant altered the space without approval, Hillingdon accepts regularisation applications for non-domestic works commenced on or after 11 November 1985, which clears the history before you invest in new finishes.
Working in an occupied Hayes building and leaving at lease end
An office floor in Hayes usually sits above or below other businesses, so the programme is built around them. Hillingdon only permits building work audible at the site boundary from 8am to 6pm Monday to Friday and 8am to 1pm on Saturday. Inside an occupied building, the landlord may also want the loudest work kept to the edges of that day. We agree those hours in writing before the licence for alterations is signed, and keep quieter work for the core day.
As the client on a commercial job, your business has duties of its own under the CDM Regulations, including appointing a principal designer and principal contractor when more than one contractor works on the project. We take the principal contractor role on our jobs. At the end of the lease, dilapidations and reinstatement follow the licence you signed, so we give you a record of what was installed to make that conversation with a Hayes landlord shorter.
- Cat B office layouts built onto a landlord's Cat A floor
- Office carpet tiles and sheet vinyl in tea points and WCs
- Strip-out of the previous tenant's office, with disposal
VOA Council Tax stock of properties, March 2025, for Hayes End, Hayes Town North, Hayes Town & Lake Farm and Hayes South. Counts rounded by the VOA.
Trusted Office Fit-Out in Hayes
An office fit-out works to a move-in date, so the programme matters more than on a house. We survey the space, read the landlord's licence conditions and give you a written quotation. We build to your designer's approved drawings, coordinate the data cabling with your IT supplier and schedule noisy work around the other occupiers. A registered electrician tests and certifies the new installation, and you get one point of contact from strip-out to handover.
- Fire alarm, emergency lighting and air conditioning specialists on one programme
- Full plans building control coordinated for the new office layout from the outset
- Itemised pricing, so you can see what every stage costs
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Hayes
How much does an office fit-out cost in Hayes?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
What is the difference between Cat A and Cat B fit-out for a Hayes office?
Cat A is the landlord's base: finished ceilings, lighting, heating and cooling and floors ready for a tenant. Cat B is the tenant's layout on top, such as meeting rooms, glazed screens, a tea point and furniture. Offices above shops around Hayes District Centre, one of Hillingdon's two largest district centres, can have neither, so the fit-out has to cover both.
Can our office in Hayes be converted to flats later under permitted development?
Not inside the areas covered by Hillingdon's Class MA Article 4 Direction. Hillingdon publishes a map covering the Hayes Opportunity Area, and the modified direction came into effect on 27 March 2024. There, a change from commercial use to homes needs full planning permission. Check the address against the current map.
Does an office fit-out in Hayes need building regulations approval?
Yes, where it is building work. New partitions that change escape routes, new WCs, accessible entrances and new lighting and services all fall under the regulations for non-domestic premises. Hillingdon's full plans route needs detailed plans and structural calculations, and a formal decision normally comes within 5 weeks, so apply early.
Can you fit out a Hayes office while other tenants stay in the building?
Yes. We seal the work area, protect the shared stair and any lift, and plan deliveries around the other tenants. Noisy work stays within Hillingdon's permitted hours of 8am to 6pm on weekdays and 8am to 1pm on Saturdays, and the landlord may ask for loud work at the edges of that window.
What duties does a business have as the client on a fit-out?
The CDM Regulations give a commercial client its own duties. They include making suitable arrangements for the project and appointing a principal designer and principal contractor where more than one contractor is involved. We act as principal contractor on our jobs and give you the information you need to meet your part.
What if a previous tenant altered the Hayes office without approval?
It can usually be regularised. Hillingdon accepts regularisation applications for domestic and non-domestic works commenced on or after 11 November 1985. The unapproved work may need opening up for inspection, so it is best handled during strip-out, before the new ceilings and partitions go in.
Who arranges the data cabling in a Hayes office fit-out?
Your IT supplier specifies it and we coordinate it. We set out containment, floor boxes and power so the cabling contractor can pull and terminate in one visit before ceilings close. Agreeing the desk layout early matters, because moving a data point after decoration costs more than planning it at first fix.
What happens to the fit-out when a lease on a Hayes office ends?
The lease and the licence for alterations decide whether you reinstate the space or leave the works in place. Dilapidations claims are argued against those documents, so keeping drawings and a record of what was installed helps. We provide that record at handover and can price reinstatement when the time comes.
Every Service, One Team
More GS Renovation Services in Hayes
One team for every GS Renovation service in Hayes:
Same Service, Nearby Areas
Office Fit-Out Near Hayes
We carry out office fit-out across Hayes and the surrounding areas. Explore a nearby location:
Ready to Start Your Hayes Project?
Free, no-obligation quote for office fit-out in Hayes.