Office Fit-Out Uxbridge
Office fit-outs for small and medium office suites in Uxbridge, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Uxbridge serves businesses taking, renewing or reshaping office space in Uxbridge, from floors in larger buildings to small suites above shops on the High Street. We strip out, build partitions and ceilings, run lighting and small power, fit meeting rooms, tea points and WCs, and hand back a finished office that the landlord and building control have signed off. The decisions that matter are the lease, the fire strategy and what you hand back when you leave.
For Uxbridge, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Uxbridge: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Office space in Uxbridge and what fitting it out involves
Office space in Uxbridge runs from floors in larger buildings to suites and studios above the High Street shops. Each starts from a different point: a floor that a landlord has already fitted, or rooms with little more than lights and sockets. London Plan Policy E1 asks boroughs to protect office clusters from office to residential permitted development rights. For a business taking space here, the questions are practical: what the landlord hands over, how long the lease runs, and what you need to add.
The answer usually comes in two parts. Cat A is the landlord's base fit-out: raised floors, suspended ceilings, lighting, heating and cooling, and working WCs, with the space open and empty. Cat B is the tenant's layer on top: partitions, glazed meeting rooms, a tea point, reception, extra power and data outlets, and decoration. In an Uxbridge suite above a shop there may be no Cat A at all, so the job starts from bare walls and a single consumer unit.
What Hillingdon's Article 4 directions mean for Uxbridge office buildings
Class MA nationally allows a change from commercial, business and service uses to homes, subject to prior approval and two years in that use. Hillingdon confirmed an Article 4 Direction on 14 July 2022 removing that right in the areas it covers, in force from 24 September 2022. The Secretary of State reduced its area, and the modified direction took effect on 27 March 2024, so confirm whether your Uxbridge address falls inside it. This is the landlord's planning question, not the tenant's.
It still matters to an Uxbridge office tenant. Under a separate strategic employment land Article 4 Direction, planning permission has been required since 22 November 2017 for change of use to residential in the identified strategic locations. Where a direction covers the building, the landlord cannot switch it to flats without an application. For a tenant, that lowers one risk to a longer lease: the building being emptied for a residential scheme before the fit-out has paid for itself. Neither direction changes the fit-out itself, which still needs the landlord's licence and building control.
Building control and fire safety for an Uxbridge office fit-out
An office fit-out often needs building control approval even without structural work, because escape routes, fire separation, accessible toilets and ventilation are controlled. A building notice cannot be used for premises the fire safety order will cover, so with Hillingdon the route is a full plans application, which needs detailed plans and structural calculations. A formal decision normally follows within 5 weeks, so settle the Uxbridge drawings before any partition goes up.
Three parts of the Building Regulations shape an office layout. Part B sets escape distances and routes, so a new meeting room must not leave anyone further from an exit than the fire strategy allows, and doors on the escape route need the right hardware. Part M covers level access, door widths and an accessible WC. Part L sets the efficiency of new lighting and controls, which is why fit-outs now use LED panels with presence and daylight sensors.
Working in an occupied Uxbridge building and handing back at lease end
Other tenants may be working on the floors above and below. Noisy stripping out, core drilling and cutting therefore follow Hillingdon's limit for work audible at the site boundary: 8am to 6pm Monday to Friday and 8am to 1pm on Saturday, with none on Sundays, public or bank holidays. Quiet work such as ceiling grid, second fix electrics and decoration can run into the evening where the landlord's building rules allow it.
Two further duties sit with you as the client. Under the Construction (Design and Management) Regulations a commercial client must make suitable arrangements for managing the project, including giving the contractor information about the building, such as the asbestos survey. And the lease will say what happens when you leave. Dilapidations and reinstatement clauses can require the Uxbridge suite to be stripped back to Cat A, so we record what we install to make that later work quicker.
- Tea points and kitchenettes on the existing risers
- LED office lighting with presence and daylight controls
- Reception areas and internal joinery
VOA Council Tax stock of properties, March 2025, for Uxbridge Common & Swakeleys, Uxbridge Central & Brunel and Uxbridge West. Counts rounded by the VOA.
Why Choose GS Renovation in Uxbridge
An office fit-out in Uxbridge has several parties to satisfy at once: your business, the landlord, building control and the other tenants in the building. GS Renovation runs the strip out, partitions, ceilings, services and finishes as one team under a single point of contact, and works with your IT supplier on the data cabling. Our founder and director, Abdelaaziz Saaid, has more than three decades of hands-on building. We work to the approved drawings and the landlord's licence for alterations, and keep noisy work within the permitted hours.
- Data cable routes agreed with your IT supplier before partitions are boarded
- One named contact for the landlord, the building manager and your office manager
- Founder with 30+ years of hands-on experience
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Uxbridge
How much does an office fit-out cost in Uxbridge?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
What is the difference between Cat A and Cat B in an Uxbridge office?
Cat A is the landlord's shell: open floor, ceilings, lighting, heating and cooling, and toilets. Cat B is what you add to make it your office: partitions, meeting rooms, a kitchen or tea point, reception, furniture power and data, and branding. Check your Uxbridge lease to see which the landlord provides, because a floor let without Cat A needs a larger scope.
Is office space near Uxbridge station protected from conversion to housing?
Parts of it may be. Under Hillingdon's strategic employment land Article 4 Direction, planning permission is required for change of use to residential in the identified strategic locations from 22 November 2017. Check whether your building sits in one of those locations, because it affects what a landlord may do with the upper floors and how long a lease is worth taking.
Does an office fit-out in Uxbridge need a full plans application?
Yes, where Hillingdon is the building control body and the work affects escape, fire separation or access. The fire safety order covers offices, which rules out a building notice. Hillingdon's full plans application needs detailed plans and structural calculations, and you normally receive a formal decision within 5 weeks. A registered building control approver is the other route.
Can noisy office fit-out work in Uxbridge run in the evening?
No. Hillingdon permits building work audible at the site boundary only from 8am to 6pm on weekdays and 8am to 1pm on Saturday, and not on Sundays, public or bank holidays. Silent tasks inside a closed floor are a matter for the landlord's building rules. We put drilling and strip out in the permitted hours and quieter trades later.
What happens at completion of an office fit-out in Uxbridge?
Within 5 days of finishing, Hillingdon requires a Notice of Completion on the LABC Regulation 16(4A) Completion Notice form, and it issues a completion certificate once it is satisfied the work complies. Keep that with the fire alarm, emergency lighting and electrical certificates, because your landlord and your insurer will ask for the set.
What does a business have to do under CDM for an office refit?
As a commercial client you must make suitable arrangements for managing the project, allow enough time, and pass on what you know about the building, such as the asbestos register and drawings of the services. Where more than one contractor is involved, you appoint a principal designer and a principal contractor in writing. We explain what we need from you at the start.
Can the landlord of an Uxbridge office building turn it into flats?
Not without planning permission where Hillingdon's Class MA Article 4 Direction applies. That direction was confirmed on 14 July 2022, and the Secretary of State later reduced its area, with the modified direction in effect from 27 March 2024. Outside it, the national Class MA right to change commercial space to homes still applies, subject to prior approval.
Do you need the landlord's consent before an office fit-out in Uxbridge?
Almost always, yes. Most office leases need the landlord's licence for alterations before partitions, ceilings or services change, and the landlord will want to see drawings and a method statement first. The licence often sets working hours and says what must be removed at the end of the lease. We price and programme to the licence terms, and the dilapidations position you agree now decides the strip out you pay for later.
Every Service, One Team
More GS Renovation Services in Uxbridge
One team for every GS Renovation service in Uxbridge:
Same Service, Nearby Areas
Office Fit-Out Near Uxbridge
We carry out office fit-out across Uxbridge and the surrounding areas. Explore a nearby location:
Ready to Start Your Uxbridge Project?
Free, no-obligation quote for office fit-out in Uxbridge.