Office Fit-Out Hanwell
Office fit-outs for small and medium office suites in Hanwell, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Hanwell is small-suite work. Ealing's Development Strategy names Hanwell a District Centre, and the office space you find here is upper floors above shops, small professional suites and studios rather than large floorplates. We strip out, partition, light, power and finish those spaces, coordinate the data cabling with your IT supplier, and hand back a working office on the date your lease or move needs.
For Hanwell, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hanwell: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The office space Hanwell actually has
Hanwell is a District Centre, not an office district, so expect a first-floor suite over a shop, a converted upper floor or a small studio. The questions are about fitting a working office into an older building: whether the floor is level, whether the windows open, and whether a WC and a tea point fit without losing a desk. Office jobs here are sized to match: a few rooms, one stair, and shared services with the unit below.
The London Plan names Croydon town centre as the strategic outer London office location, which puts large-floorplate office work a long way from Hanwell. For a Hanwell office that scale shapes the practical questions. The stair is the only way in for materials, the fire escape is often the same stair the shop staff use, and the electrics may share a supply or a riser with the flat or shop next door. We survey those first, because they decide what the fit-out can change.
Cat A and Cat B in a small Hanwell suite
Cat A is the landlord's base build and Cat B is your own layout on top of it. In a small Hanwell suite, Cat A usually means a clear floor with lighting, heating or cooling, power at the perimeter, finished walls and a working WC. Cat B is the partitions and glazed screens, the meeting room, the tea point, desks with small power, data containment and your signage and decoration inside. Ask the agent which of the two the lease hands over.
An upper floor can come back from the last tenant half stripped, and then the first job is finishing a Cat A the landlord never completed. After that the Cat B work is ordered: strip-out, first fix for power, lighting and data containment, partitions and ceilings, second fix, then floor finishes and decoration. Your IT supplier cables and patches the data; we install the routes and boxes to their layout so the two trades meet on site.
Building regulations for an office fit-out in Hanwell
An office fit-out that moves partitions, changes escape routes or renews lighting is controlled non-domestic work. The usual headings are Part B for fire and means of escape, Part M for access and WCs, and Part L for lighting and services. Ealing says a building notice is only suitable for small domestic works, so an office using Ealing goes in as a full plan application, where the plans are checked within 10 working days and a list of observations is produced.
Ealing runs its own building control service and remains the provider of last resort, and it also reports severe backlogs from customers who came back after their private sector company failed. A formal decision on a full plan application is issued within five weeks unless an extension to two months is agreed. As a commercial client you carry client duties of your own under the CDM Regulations, including allowing enough time and passing on what you know about the building.
Leases, occupied buildings and the Class MA question in Hanwell
An office fit-out over a Hanwell shop runs inside a building with a business trading below and sometimes a flat alongside. The landlord's licence for alterations sets what you may change and when, and noisy work such as breaking out, drilling and chasing goes into hours agreed with the landlord and the neighbours. Plan dilapidations from the start: record the condition you took on, keep the drawings, and know what the lease asks you to reinstate when it ends.
Owners of upper-floor offices here sometimes weigh a change to flats instead. Class MA permits a change from Class E to dwellinghouses, with prior approval covering adequate natural light in every habitable room, and London Plan Policy SD8 says boroughs should introduce targeted Article 4 Directions, where justified, to sustain town centres. That is background on the office stock. Whether a direction covers a building, and whether to convert it, is the owner's planning question, not part of your fit-out.
- Small power to desks, floor boxes and perimeter trunking
- Metal stud office partitions boarded both sides
- Suspended grid ceilings and plasterboard ceilings with access panels
VOA Council Tax stock of properties, March 2025, for Hanwell, Elthorne Park and Cuckoo Park. Counts rounded by the VOA.
Working With GS Renovation in Hanwell
A small office needs a builder who can run the whole fit-out without a chain of subcontracted packages. We visit, measure, read the lease obligations with you, and give you a written quotation and programme that separates Cat A and Cat B items. We coordinate with your IT supplier and landlord, keep noisy work to the agreed hours, bring in the registered electrician who certifies the installation, and hand over drawings and certificates for your file and your eventual dilapidations.
- Itemised pricing, so you can see what every stage costs
- Fire alarm, emergency lighting and air conditioning specialists on one programme
- Method statement and programme supplied for your landlord's licence for alterations
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about Office Fit-Out Hanwell
What should a business budget for an office fit-out in Hanwell?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Hanwell quote follows a survey of the space.
Is Hanwell a real location for office fit-out work?
Yes, at a small scale. Ealing's Development Strategy names Hanwell a District Centre, and the London Plan names Croydon town centre as the strategic outer London office location, so large floorplates are elsewhere. The office work here is upper-floor suites, studios and professional offices over shops, and that is the work we price and run.
What is the difference between Cat A and Cat B fit-out?
Cat A is the landlord's base build: a clear floor with lighting, heating, power at the perimeter, finished walls and WCs. Cat B is the tenant's layout on top: partitions, meeting rooms, tea point, desk power, data containment and decoration. The lease tells you which one you receive and which one you pay for.
Can a Hanwell office fit-out go in under a building notice?
No. Ealing says a building notice is only suitable for small domestic works where detailed plans are unnecessary. An office is non-domestic, so with Ealing the fit-out goes in as a full plan application, with the plans checked within 10 working days and a list of observations produced. We build to the approved plans and any conditions.
How long does Ealing take to decide on office fit-out plans in Hanwell?
A formal decision notice within five weeks, unless an extension to two months has been agreed. Ealing checks the plans within 10 working days and issues its observations first. Allow for that in the lease start date, because partitions and ceilings should not close until the fire and escape details are agreed.
When is the Ealing building control charge paid on a Hanwell office?
In two parts. On an Ealing full plan application only 40% of the building control charge is payable on submission, and the remaining 60% is invoiced when work starts. Budget the second payment into the start of the programme rather than the end, alongside the landlord's licence costs.
Should a Hanwell office use Ealing or a private building control approver?
Either can work, but ask how a mid-job failure is handled. Ealing runs its own building control service and acts as provider of last resort, and it reports severe backlogs with customers who reverted to it after their private company failed. Weigh that before the application goes in, so inspections do not hold up the move-in date.
What do the CDM Regulations ask of a business commissioning an office fit-out?
You are the client, and the client has duties of its own. They include allowing enough time and resources, providing the information you hold about the building, such as an asbestos survey, and making sure the contractor has a construction phase plan before work starts. We prepare that plan and run the site to it.
What happens to the fit-out when the office lease ends?
The lease decides whether it stays or goes. Where the lease requires reinstatement to the condition at the start, that means removing partitions, making good ceilings and returning the services layout. Keep a schedule of condition and the as-built drawings from day one, because they are your evidence in any dilapidations claim.
Every Service, One Team
More GS Renovation Services in Hanwell
One team for every GS Renovation service in Hanwell:
Same Service, Nearby Areas
Office Fit-Out Near Hanwell
We carry out office fit-out across Hanwell and the surrounding areas. Explore a nearby location:
Ready to Start Your Hanwell Project?
Free, no-obligation quote for office fit-out in Hanwell.