Office Fit-Out Hounslow
Office fit-outs for small and medium office suites in Hounslow, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Hounslow covers two quite different kinds of space. Council documents name two business parks, Chiswick Business Park and Bedfont Lakes Business Park, and an Article 4 direction protects key existing office locations. The borough also has smaller space, such as suites above shops in the town centres and offices in converted buildings. We fit out both at the scale they really are, from partitions, ceilings and lighting to tea points, WCs and the building regulations sign off.
For Hounslow, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hounslow: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Where Hounslow's office space is, and at what scale
Hounslow's larger office space sits in a few named places. The council's HMO Article 4 direction names Chiswick Business Park and Bedfont Lakes Business Park among the areas it leaves out, and its Class MA Article 4 direction protects key existing office locations alongside the town centres and neighbourhood centres. Away from those places the borough is largely residential, so office work there is more likely to be a floor above a shop or a small suite.
The scale decides the fit-out. A floor in a managed business park comes with a landlord's fit-out guide, set working hours, base building services to connect into and a sign off process of its own. A suite above a parade shop may have no lift, a shared stair and a single electrical supply, so the first job is finding out what the building can carry. We visit before pricing and work to whichever set of constraints the space has.
Cat A and Cat B work in a Hounslow office
Cat A and Cat B describe who fits what in a Hounslow office. Cat A is the landlord's base finish: raised floor or screed, suspended ceiling, basic lighting, heating and cooling, and working WCs. Cat B is the tenant's layout on top: partitions and glazed meeting rooms, a kitchenette or tea point, extra small power, feature lighting, decoration and signage. Your lease and the agent's particulars say which has been done, and the difference shows up in both the programme and the price.
Hounslow's building control charges alterations and fit-outs not covered by its other tables under Table F, by the estimated cost of the work, so the scope you settle on also sets the building control charge. Data cabling is coordinated with your IT supplier, who specifies the points and the comms room. We build the containment, partitions and ceilings around their layout, so the cabling goes in at first fix and nothing is cut open after the ceiling tiles are laid.
Fire, access and working hours in an occupied Hounslow building
Office work in Hounslow needs building regulations approval when it changes the escape routes, the fire alarm, the WCs or the fixed services. Part B governs means of escape and fire separation, so a new meeting room must not create an inner room with no second way out. Part M covers accessible WCs and routes, and Part L covers lighting and controls. Hounslow's building control says a full plans application is usually used for major projects and alterations, and because an office is covered by fire safety law, full plans is the route to plan for.
Occupied buildings need careful timing. Noisy work in Hounslow is permitted Monday to Friday 8am to 6pm and Saturday 8am to 1pm, which clashes with the other tenants' working day. Where drilling and cutting must happen when the building is empty, Hounslow can grant Section 61 consent for works at specific times under agreed conditions. As the client on a commercial job you also have duties under the CDM Regulations, which we explain and help you meet.
Leases, dilapidations and Hounslow's protected office locations
Most office fit-outs begin with the landlord's licence for alterations, and many end with dilapidations. The licence lists the drawings the landlord approves and often a reinstatement clause, meaning the partitions and fittings you add may have to come out when the lease ends. Keep the approved drawings, the building control completion and the electrical certificates together, because a surveyor measuring dilapidations in a Hounslow office will ask for them. We can strip out and reinstate to the lease at the end as well.
Planning context explains why these offices stay offices. Hounslow's confirmed Article 4 direction removes the Class MA right to change Class E use to residential, and it applies to town centres, neighbourhood centres, industrial sites and key existing office locations. It came into force on 22 April 2025. For a tenant this is background, not a hurdle: it keeps the office stock in office use, and an internal office fit-out needs no planning permission unless the outside of the building or its use changes.
If the building is listed, the works themselves are a separate question: anything that affects its character, inside or out, needs listed building consent from Hounslow Council, and carrying it out without consent is a criminal offence.
- Tea points and kitchenettes on the existing risers
- Strip-out of the previous tenant's office, with disposal
- Internal office signage and manifestation on glazed screens
VOA Council Tax stock of properties, March 2025, for all 29 statistical areas in Hounslow. Counts rounded by the VOA.
Why Choose GS Renovation in Hounslow
An office fit-out has a hard date: the day your staff move in. We plan backwards from it, with a written programme covering strip out, first fix, ceilings, partitions, second fix, testing and the building control completion. One team does the building work, while a registered electrician certifies the electrics and your IT supplier handles data. We keep the landlord's managing agent informed and work around the other tenants in the building, so the fit-out does not become a dispute.
- Fire alarm, emergency lighting and air conditioning specialists on one programme
- Asbestos survey checked before any office ceiling, floor tile or boxing is disturbed
- Building control applications and inspections coordinated for you
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Office Fit-Out Hounslow
How much does an office fit-out cost in Hounslow?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
Is there much office space to fit out in Hounslow?
Some, in specific places. Council documents name Chiswick Business Park and Bedfont Lakes Business Park, and a Class MA Article 4 direction protects key existing office locations and the town centres. Elsewhere Hounslow is mainly residential, so office work there is usually a small suite or a floor above a shop.
What is the difference between Cat A and Cat B fit-out?
Cat A is the landlord's base finish: ceilings, floors, basic lighting, heating and cooling, and WCs. Cat B is the tenant's own layout on top, such as partitions, meeting rooms, a tea point, extra power and decoration. Check your lease and heads of terms to see which the landlord has already provided before you set a budget.
How is building control charged for an office fit-out in Hounslow?
By the estimated cost of the work. Hounslow's Table F covers alterations, fit-outs and installations not described in its other tables, and sets the charge by estimated cost. Your designer submits the application, and we give them the programme so inspections are booked at the right stages.
Can office fit-out work in Hounslow be done in the evenings?
Quiet work can, and noisy work can with consent. Hounslow's standard hours for noisy work are Monday to Friday 8am to 6pm and Saturday 8am to 1pm. Hounslow grants Section 61 consent allowing construction works at specific times under agreed conditions, which suits an occupied building where daytime drilling is not practical.
Could a Hounslow office building be turned into flats without planning permission?
Not in the protected locations. Hounslow's Article 4 direction removes the Class MA right to change Class E use to residential in town centres, neighbourhood centres, industrial sites and key existing office locations, in force from 22 April 2025. For an office tenant it mainly means the building stays in office use.
Do new partitions in a Hounslow office affect the fire escape?
They can, which is why partitions are drawn before they are built. A new room must not trap people behind another room with no alternative way out, and doors on escape routes need the right fire rating, closers and signs. The fire alarm and emergency lighting are extended to cover the new rooms, and building control checks the result. Hounslow's building control says a full plans application is usually used for alterations of this kind.
Who is responsible for CDM duties on a Hounslow office fit-out?
You are, as the commercial client, alongside us as the contractor. The CDM Regulations give a commercial client duties of its own, such as allowing enough time and passing on information about the building, including any asbestos survey. We explain what that means for a fit-out of your size and prepare the construction phase plan.
What happens to a Hounslow office fit-out when the lease ends?
The landlord may ask for it to be removed. Many leases and licences for alterations include a reinstatement clause, and a dilapidations claim covers what has not been put back. Keep the approved drawings and certificates, and ask us to price reinstatement when you plan the fit-out, so the exit cost is known early.
Every Service, One Team
More GS Renovation Services in Hounslow
One team for every GS Renovation service in Hounslow:
Same Service, Nearby Areas
Office Fit-Out Near Hounslow
We carry out office fit-out across Hounslow and the surrounding areas. Explore a nearby location:
Ready to Start Your Hounslow Project?
Free, no-obligation quote for office fit-out in Hounslow.