House Extensions Hertford
Single storey rear and double storey extensions in Hertford, planning, structure and build under one contract.
- Rated 4.9 from 31 reviews on MyBuilder
- Guide from £40,000 (London-derived)
- Free site survey, itemised quote
An extension in Hertford is judged against a district plan, and in three wards against a neighbourhood plan on top of it. The ground under your garden changes across the town. We build the extension and coordinate the structural engineer, the applications and the inspections.
For Hertford, on London-derived ranges a single-storey rear extension typically starts from £40,000, or £2,000 to £2,800 per m²; Hertfordshire work generally runs below that. GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hertford: the structural engineer we appoint designs the structure, we build it, and building control signs it off.
Price guide
| Work | Indicative range |
|---|---|
| Single-storey rear extension | from £40,000 |
| Rear extension, per m² | £2,000 to £2,800 |
| Side return, per m² | £2,400 to £3,200 |
| Wraparound, per m² | £2,400 to £3,200 |
| Double storey, per m² | £1,800 to £2,600 |
| Basement extension | see the basement page |
Indicative London ranges (Architecture for London, Resi, MyBuilder and Checkatrade, 2026), not a quotation. Hertfordshire work generally runs below the London figures; your price follows a site visit. Prices checked September 2026. Full breakdown: Extension Costs & Planning.
Quick estimate for Hertford
Hertford range: choose above

Which plans your extension is judged against
East Herts District Council is the local planning authority for Hertford. It adopted its District Plan on 23 October 2018, for the period 2011 to 2033, and that is the starting point for any application.
Three Hertford wards have made neighbourhood plans of their own: Bengeo and Sele in July 2021, and Kingsmead on 26 July 2023. A fourth area, Hertford Castle Plus, covering Castle, Kingsmead West and Bengeo South, was designated in July 2024, and that plan has not yet been made. Which ward you are in decides whether there is a second layer of policy to answer.
Housing in Hertford
Of the 14,040 homes the valuation list records in Hertford, 16% were built before 1919, 9% between the wars and 74% since 1945; 31% are flats and 69% are houses. 33% of homes here are terraced; a rear extension on a terrace in Hertford digs foundations close to both neighbours, so notices to both are normal.
A neighbourhood plan rule that caps your roof height
In Kingsmead, roof height is capped by policy. Kingsmead neighbourhood plan policy HKBE4 requires rooflines of development in residential areas to be limited to the height of the homes immediately adjacent or opposite.
For a two storey rear extension in that ward, that is a constraint to design to before drawings are submitted. We work to it from the first sketch, so the scheme that goes in is the scheme that can be built.
What is under your garden
Under the built up part of Hertford the bedrock is chalk. British Geological Survey 1:50,000 mapping shows it as the Lewes Nodular Chalk Formation and Seaford Chalk Formation, undifferentiated. The south east of the town is the exception, where the Lambeth Group of clay, silt and sand comes to bedrock. That includes the south east end of Mangrove Road, the southern part of Balls Park, London Road and Foxholes Business Park.
Groundworks in the historic core can also meet archaeological interest. The county Historic Environment Record holds about 350 records within Hertford Conservation Area. Foundation depths and trial holes are set by the engineer for your address, and we build to that design.
Water and trees before you dig
Water is a standing constraint in Hertford. The Environment Agency runs four separate flood warning areas that name the town, one for each river. They are the River Beane at Hertford, the River Lee at Hertford and Ware, the River Rib at Wadesmill to Hertford, and the River Mimram from Tewin to Hertford. The Kingsmead neighbourhood plan also attributes drainage pressure in that ward in part to Victorian and Edwardian properties having been substantially extended since its two ditches were designed.
Trees carry their own timetable. You must give the council six weeks notice under section 211 before carrying out work to a tree in a conservation area that is not already covered by a Tree Preservation Order. That notice sits at the front of the programme, not in the middle of it.
Kitchen extensions in Hertford
48% of the houses in Hertford are terraced. On a terrace the kitchen extension is built out from the back, into the side return where the house has one or across the full rear width, and a steel beam takes the old back wall so the kitchen and the new room become one space. The fit-out is priced on its own page, kitchen renovation in Hertford; the build figures are in the table above.
Side return extensions in Hertford
Side returns belong to Victorian and Edwardian terraces, and only 16% of homes in Hertford predate 1919, so they are the exception here; most extensions run across the full rear width instead. Our side return extension page covers the build in detail, with build rates of £2,400 to £3,200 per m².
Double storey extensions in Hertford
Under permitted development a two-storey rear extension can go no more than 3 metres beyond the original rear wall and must stay at least 7 metres from the rear boundary, and in a conservation area it is not permitted development at all. Many gardens are too short for the 7 metre rule, so a double storey extension in Hertford often needs planning permission from East Herts District Council. On the 33% of homes that are terraced, the neighbours' windows usually decide the depth. Our double storey extension page explains the build, at £1,800 to £2,600 per m² across both floors.
- Steel goalpost frames where the rear wall opens up
- Planning applications and permitted development assessments
- Building control inspections at foundation, damp course and steel stages
VOA Council Tax stock of properties, March 2025, for Hertford Bengeo, Hertford West, Hertford Foxholes and Hertford South. Counts rounded by the VOA.
The GS Renovation Difference in Hertford
An extension here has three approval questions running at once: the district plan, any neighbourhood plan for your ward, and building regulations. Getting those in the right order is most of the job. We appoint the structural engineer, coordinate the building control application and inspections, and build to the calculations issued. One point of contact from the first survey to the final inspection, fully insured, with a free quotation and no obligation.
- Programme planned around party wall notice periods before excavation near a neighbour
- Registered in England, Companies House no. 14611254
- Garden levels and access made good where the build meets outside
Reviewed jobs near Hertford
1 MyBuilder review from Hertford, with each customer's own job title:
- Tile kitchen splash back, Hertford, 18 Jul 2021 (5 out of 5)
Read all 31 on our reviews page.
Built a new extension at rear of property. Laid foundations, drainage, raised floor, new roof and completed all fixtures and interior decoration…
Punctual, worked hard, and did exactly what he was asked and what he said he would do. Overall, a very high quality job. Will use again.
What can I say!!! George is an extremely lovely man his workmanship is second to none, he has an excellent eye for detail and nothing was to much…
FAQ
Frequently Asked Questions about House Extensions Hertford
How does your house extensions price in Hertford compare with a national firm's?
A GS Renovation price for house extensions in Hertford compares well with a national firm's because there is no head office to fund, and both should sit within £2,000 to £2,800 per m² for a rear extension (London-derived). GS Renovation is the contractor doing the work at SG13, not a broker adding a margin. Compare the scope, including building regulations approval from foundations to completion, not just the total.
Is the ground at Balls Park the same as on the Bengeo side of town?
No. At Balls Park the British Geological Survey maps Lowestoft Formation diamicton, a glacial till, over the chalk. On the higher ground at Port Hill, Bengeo Street and Sele Farm it maps Kesgrave Catchment Subgroup sand and gravel instead. Till and granular deposits are different bearing materials, so foundation type and depth follow the address rather than the town. The engineer specifies after trial holes and we build to that design.
Does the old gravel pit at Thieves Lane matter if you are digging foundations nearby?
It is a reason to dig trial holes rather than assume. The Historic England record for Sele ward includes a post medieval gravel pit at Thieves Lane, reference 6864, a post medieval brickfield at Valeside, reference 30289, and a brickground at St Andrew's Cemetery, reference 7239. Former workings can leave ground unlike the plot next door. What is under your garden is confirmed by opening up, and the engineer sets the foundation from that.
How do you find out whether an extension would sit in a flood zone?
The zone is checked against the mapping for your plot before the design is fixed. The Sele plan records land in Flood Zone 2, 3a and 3b associated with the River Beane and its tributaries. The Kingsmead plan records the same zones on the floodplain of the River Lea. Where a proposal sits in one of them, flood risk information forms part of the planning application, and the finished floor level is part of the answer.
There is a ditch crossing Tamworth Road. Does an extension nearby have to keep clear of it?
It has to be designed around, and the council will want to see how. Surface water from Kingsmead drains into two open ditches, one beside Rowleys Road and one known as the Gulches, which crosses Tamworth Road next to number 22. Building over or beside a watercourse affects foundations, access for maintenance and where rainwater goes. The position of the ditch is surveyed and the drainage design agreed before an application goes in.
Does the Bengeo neighbourhood plan carry real weight against the district plan?
Yes. A made neighbourhood plan sits in the development plan, and officers apply it alongside the district plan. Bengeo's went to a referendum on 6 May 2021, where turnout was 49.1 per cent and 2,821 votes, or 94.8 per cent, were cast in favour. Policy carrying that mandate gets quoted in decisions on householder applications. We read the ward document at sketch stage rather than after a refusal.
Every Service, One Team
More GS Renovation Services in Hertford
One team for every GS Renovation service in Hertford:
Same Service, Nearby Areas
House Extensions Near Hertford
We carry out house extensions across Hertford and the surrounding areas. Explore a nearby location:
Ready to Start Your Hertford Project?
Free, no-obligation quote for house extensions in Hertford.