Commercial Fit-Out Canary Wharf
Shop, cafe, restaurant, salon and clinic fit-outs in Canary Wharf, shopfront to counter under one contract, built around your opening date.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £1,500 to £3,000 per m²
- Free site survey, itemised quote
Commercial fit-out in Canary Wharf means shops, cafes, restaurants, salons, clinics and gym studios in a Major Centre of the Tower Hamlets town centre hierarchy. Customer-facing units sit around West India Quay and Canary Wharf station and in the shopping levels beneath the towers, and smaller parades serve homes elsewhere in E14. We fit out the smaller of these units: the counter, the service area, the floor, the lighting, the toilets and the frontage, built to the landlord's rules and the approved drawings.
For Canary Wharf, published UK guides put refurbishing a retail space at £1,500 to £3,000 per m² and a restaurant or cafe at £2,000 to £4,500 per m², and London units usually cost more (MyBuilder, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Canary Wharf: our own trades do the strip-out, back of house, counter fitting and finishes, and we coordinate the shopfront, extraction, electrical and fire specialists the unit needs.
Price guide
| Work | Indicative range |
|---|---|
| Retail space refurbishment | £1,500 to £3,000 per m² |
| Restaurant or cafe refurbishment | £2,000 to £4,500 per m² |
| Shop fitting only: counters, display and fixtures, 2024 guide | £60 to £140 per sq ft |
| Aluminium shopfront, single bay up to about 4m wide | £2,000 to £5,000 |
| Cafe kitchen extraction with basic odour control | £5,000 to £12,000 |
Indicative ranges from published cost guides (MyBuilder, Checkatrade, Urban Shopfronts and Fan Rescue, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

What kind of trading units a Canary Wharf fit-out deals with
Canary Wharf is designated a Major Centre in the Tower Hamlets town centre hierarchy, and the London Plan network ranks International and Metropolitan centres above Major ones. For a fit-out that means a busy centre with a mix of unit types: food and drink by the water at West India Quay, and shops and services in the malls and around the station. Clinics, salons or studios take the upper floors of commercial buildings. Each change of tenant normally brings a strip out and a new fit-out.
A unit inside a managed estate is handed over as a shell or a previous tenant's layout, with a fit-out guide that sets rules on deliveries, hot works, noisy hours and approved drawings. A unit on a local parade elsewhere in E14 is simpler to access but often has flats above it, so noise and smells travel. We plan the programme to whichever set of rules applies before the first trade arrives, because it decides when the work can be done.
Shopfronts, fascias and grilles on a Canary Wharf unit
A street or quayside shopfront in Canary Wharf is judged against Policy D.DH9 of the Tower Hamlets Local Plan, which says shopfront fascias should not extend above ground floor level. The Local Plan also prefers security glass and internal retractable grilles to closed external roller shutters. A new shopfront that materially changes the building's appearance needs planning permission, and an illuminated sign usually needs advertisement consent. You or your designer apply for both.
A frontage wholly inside an enclosed mall does not usually change the outside of the building, so there the landlord's own rules on signage depth, lighting and materials decide what can be built. The shopfront itself is made by a specialist fabricator to the consented drawing. We fit it in the order that keeps the unit secure: the old frontage comes out and the new frame, glazing and door go in on consecutive days, with a temporary hoarding closing the opening overnight. Internal grilles are fitted once the glazing is in.
Use classes, extraction and drainage for Canary Wharf food units
Before a Canary Wharf unit is fitted out, check that the intended use is allowed. Class E covers shops, cafes, restaurants, clinics, gyms and offices, so a move between those uses does not normally need planning permission for the change itself. A hot food takeaway, a pub or a bar is sui generis, so changing a unit to one of those needs planning permission. Your designer also checks the unit's planning history, because a condition on an earlier permission can restrict the use even within Class E.
Food units carry the heaviest services. A cooking kitchen needs extraction with odour control, and the duct route to roof level is often the hardest part of the design in a building with flats or offices above. Drainage from sinks and dishwashers needs a grease trap or separator, and the floor falls to gullies that are easy to clean. We fix the extract route, drainage points and electrical loads first, because they set where the counter and kitchen can go.
Access, fire escape and building control for a Canary Wharf shop
A customer-facing unit in Canary Wharf has to meet building regulations for public use. Part M covers a level or ramped entrance, door widths and an accessible WC where new customer toilets are provided. Altered parts must not leave access worse than before. Part B covers escape routes, exit signs and fire separation from the rest of the building. Where the unit sits under flats or offices, the separation to the floors above is checked before any ceiling is opened. Tower Hamlets building control visits when work begins, at key stages and on completion.
Trading neighbours shape the programme. In a busy parade or mall, deliveries and loading are booked around the other units' trading hours. Noisy work stays inside the council's 8am to 6pm weekday window, noisy work outside it needs the council's agreement, usually through a prior consent, and a mall landlord may push it before opening time. The business commissioning a shop fit-out is the client under the CDM regulations, so it passes on what it knows about the unit, such as an asbestos report and the fit-out guide. We keep hoarding, dust screens and a clean shopfront line so neighbours can keep trading.
- Programmes worked back from your opening date
- Decoration and making good to a customer-ready finish
- Clinic and treatment room fit-outs with basins in each room
VOA Council Tax stock of properties, March 2025, for the Canary Wharf, Millwall and Cubitt Town statistical areas, which together cover the Isle of Dogs. Counts rounded by the VOA.
Working With GS Renovation in Canary Wharf
A shop or cafe fit-out is judged on its opening day, so we build the programme backwards from it. One team handles strip out, services, extraction and drainage runs, counters, floors, lighting and toilets, and fits the fabricator's shopfront, in the order the landlord's rules and the building inspections allow. A registered electrician certifies the installation and a registered gas engineer connects any gas cooking. Your designer handles planning and advertisement consent, and we build to the approved drawings with one contact on site.
- Fire stopping above the shop photographed before the ceiling closes
- Free, no-obligation quotations
- Counter, display and back of house built by our own trades
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about Commercial Fit-Out Canary Wharf
How much does a shop or cafe fit-out cost in Canary Wharf?
Published UK guides put refurbishing a retail space at £1,500 to £3,000 per square metre and a restaurant or cafe at £2,000 to £4,500 per square metre (MyBuilder, 2026), and London units usually cost more. For a Canary Wharf unit the biggest variables are the kitchen and extraction, the shopfront, the electrical supply and accessible WC work. The quote after the survey itemises each of them.
What kind of commercial units do you fit out in Canary Wharf?
Smaller customer-facing units: shops, cafes and restaurants, salons, clinics and gym studios, in and around the Canary Wharf Major Centre and on the local parades of the Isle of Dogs. Office suites are a separate service. We handle the strip out, services, counters, floors, lighting, toilets and frontage, working to the landlord's fit-out rules.
Is Canary Wharf treated as a town centre in planning terms?
Yes. Canary Wharf is designated as a Major Centre in the Tower Hamlets town centre hierarchy. The London Plan network sits Major centres alongside International, Metropolitan and District centres, with Local and Neighbourhood centres set in Local Plans. That status shapes how planning views shop, cafe and service uses in the area.
Can a Canary Wharf shop have an external roller shutter?
Unlikely. The Tower Hamlets Local Plan says shopfront security should use security glass and internal retractable grilles rather than closed external roller shutters, and a new external shutter generally needs planning permission. Your designer specifies the glazing and grille on that basis. We fit the grille inside the glazing line so the frontage stays open to view when the unit is closed.
How high can the fascia sign go on a Canary Wharf shopfront?
Not above ground floor level. Policy D.DH9 of the Tower Hamlets Local Plan says shopfront fascias should not extend above ground floor level. The landlord may add its own sign rules on top. Your designer sets the fascia depth on the drawings and we fit the frame and lighting to suit.
Does turning a shop into a takeaway need planning permission?
Yes. Shops, cafes and restaurants sit within Class E, but a hot food takeaway is sui generis, so a change to takeaway use needs planning permission, as does a change to a pub or bar. Your designer or agent applies. The kitchen extraction and odour control details usually form part of that application.
Does a cafe fit-out need a grease trap?
Where food is prepared and washed up, a grease trap or separator on the kitchen drainage is the normal answer, to keep fats out of the sewer. We place it where it can be emptied without closing the kitchen, and set the floor falls and gullies around it. The water company and building control can have requirements on the drainage.
Can a Canary Wharf shop fit-out run while neighbouring units trade?
Yes, with a plan agreed with the landlord first. Deliveries, dust screens and noisy work are timed around the landlord's rules and the neighbours' trading hours. We keep the unit sealed with hoarding or a temporary screen, move materials through the agreed route and leave the common areas clean at the end of each day.
Does an illuminated sign on a Canary Wharf shop need consent?
Usually, yes. An illuminated sign normally needs advertisement consent, which is separate from any planning permission for the shopfront, and Policy D.DH9 keeps the fascia at ground floor level. Your designer or sign maker applies, and an estate landlord adds its own approval. We fit the fascia and run the power to it, and a registered electrician certifies the new circuit.
Every Service, One Team
More GS Renovation Services in Canary Wharf
One team for every GS Renovation service in Canary Wharf:
Same Service, Nearby Areas
Commercial Fit-Out Near Canary Wharf
We carry out commercial fit-out across Canary Wharf and the surrounding areas. Explore a nearby location:
Ready to Start Your Canary Wharf Project?
Free, no-obligation quote for commercial fit-out in Canary Wharf.