Flat Refurbishment Canary Wharf
Flat refurbishments in Canary Wharf, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flat refurbishment is the main refurbishment work in Canary Wharf, because the VOA counts 92% of homes across Canary Wharf, Millwall and Cubitt Town as flats and 66% as built in 2000 or later. With housing made up largely of contemporary riverside apartments, a common job is a second fit-out of a young flat in a managed block: new kitchen, bathroom, floors, lighting and heating controls. The building sets the terms. The lease, the managing agent and the block's rules decide what you can change and when the trades can work.
For Canary Wharf, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Canary Wharf: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Refurbishing a young Canary Wharf flat inside a concrete frame
Refurbishing a Canary Wharf flat is mostly a second fit-out of a building that is still young. With 66% of homes across the wider Canary Wharf, Millwall and Cubitt Town statistical area built in 2000 or later, the shell is sound but the first round of finishes is often worn. Typical signs are laminate floors lifting, kitchen doors swollen at the sink, bathroom sealant failing and downlights that no longer match. The fabric under them is likely to be a concrete or steel frame with plasterboard linings, not solid brick.
That changes what we plan for. Walls between rooms are often stud partitions, so moving a door or widening a kitchen opening can be straightforward, but the concrete slab limits where new waste pipes can fall. Services often run in ceiling voids and risers shared with the block, and the walls and floor around the flat are part of the building's fire compartments, so any hole cut through them has to be fire stopped again. We check what belongs to the flat and what belongs to the building before any ceiling comes down.
Housing in Canary Wharf
The stock in the Canary Wharf, Millwall and Cubitt Town statistical areas runs to roughly 22,070 dwellings, 92% of them flats and 8% houses, built 2% before 1919, 2% between 1919 and 1939 and 95% after 1945.
Licence to alter, managing agents and tall blocks in Canary Wharf
Across the Canary Wharf, Millwall and Cubitt Town statistical area the VOA counts 92% of homes as flats, and in a flat the lease sets the first stage of any refurbishment. Most leases require the freeholder's written licence to alter before walls, floors or services change, though covenants vary: some forbid structural work outright and some allow non-structural work without consent. The managing agent will usually want drawings, a method statement and the planned working hours before it issues that licence. We prepare the contractor side of that pack so the application is complete when it goes in.
Some Canary Wharf blocks are tall residential towers, and that changes who approves the work. Where a block is a higher-risk building under the Building Safety Act, building control for notifiable work comes from the Building Safety Regulator rather than the council. Approval has to be in place before that work starts, so the programme allows for it. Some installer self-certification still works there, but certain competent person scheme types cannot be used in a higher-risk building, so the managing agent or your designer confirms the route for each item.
Floors, leaks and working hours inside a Canary Wharf block
Hard floors are the most common sticking point in a Canary Wharf flat. Swapping carpet for timber or tile changes how footsteps travel to the flat below, so leases commonly ask for an acoustic underlay or a tested build up, and some agents want to see the product data before work starts. Kitchens and bathrooms are renewed inside the existing footprint, with waste routes kept to the falls the slab allows, and every new connection is pressure tested before boxing in so no leak reaches your neighbour.
Inside a block, the managing agent's hours decide, and they are often narrower than the council's weekday noise window, with quiet periods at lunchtime or no drilling after mid-afternoon. We book the service lift and loading bay, protect the lift car and corridors, carry waste out in bags rather than filling a skip, and place drilling and cutting inside the agreed hours. Neighbours on the same floor get notice of the noisiest days, which keeps complaints to the agent down and the licence to alter in good standing.
Letting a refurbished Canary Wharf flat: EPC and licensing
A landlord refurbishing a Canary Wharf flat between tenancies should check the energy rating before the specification is fixed. GOV.UK says that since 1 April 2020 landlords cannot let or continue to let properties covered by the MEES Regulations with an EPC rating below E without a valid exemption, and local authorities enforce it. In a flat the items that move the rating are usually lighting, heating controls, hot water and electric heaters, so the refurbishment is the practical time to deal with them.
Licensing reaches flats here too. Canary Wharf is one of the wards listed in the Tower Hamlets Additional Licensing Scheme, which also covers flats with five or more tenants in two or more households in purpose built blocks of three or more flats. Tower Hamlets has said that from 1 October 2026 there will be no selective licensing scheme in the borough. If you plan to let to sharers, the licence conditions shape the finish, so your agent confirms the position before we order.
- Managing agent liaison on working hours, access and the common parts
- Condensation control with extract fans and trickle vents
- Buy-to-let refurbishments between tenancies, with the EICR and gas safety record arranged with the certifying engineers
VOA Council Tax stock of properties, March 2025, for the Canary Wharf, Millwall and Cubitt Town statistical areas, which together cover the Isle of Dogs. Counts rounded by the VOA.
Why Choose GS Renovation in Canary Wharf
We plan a flat refurbishment around the building as well as the rooms: the managing agent's approvals, the permitted hours, the lift and loading bay, and the order in which trades need the space. One team strips out, first fixes, plasters, tiles and fits, so there are fewer handovers and fewer days of access to book. A registered electrician certifies the electrical work. You get a programme with a handover date you can plan a let or a sale around.
- Itemised pricing, so you can see what every stage costs
- Acoustic floor build-ups laid to the specification in your lease
- The lease and licence to alter read before a flat is quoted
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
FAQ
Frequently Asked Questions about Flat Refurbishment Canary Wharf
How much does a flat refurbishment cost in Canary Wharf?
Published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one at £15,000 to £18,000 (Checkatrade and MyJobQuote, 2026), and London flats usually cost more. In a Canary Wharf block the building adds its own lines: protecting the common parts, carrying materials up, working in the managing agent's hours and meeting the lease's floor rules. The quote after the survey itemises each one.
Is the freeholder's permission needed to refurbish a Canary Wharf flat?
Usually, yes, for anything beyond decoration. The VOA counts 92% of homes as flats across the wider Canary Wharf, Millwall and Cubitt Town statistical area. Most flat leases require the freeholder's licence to alter before walls, floors or services change, though the wording varies from lease to lease. Check yours and ask the managing agent early. We supply the contractor documents the agent asks for.
Can hard flooring go into a Canary Wharf flat?
Often, but the lease decides. Hard floors carry impact sound to the flat below more than carpet, so many leases and managing agents require an acoustic underlay or a specific build up. We ask for the block's flooring rules before ordering, and lay the underlay and floor to that specification so the licence to alter is met.
Does a let flat in Canary Wharf need a minimum EPC rating?
Yes, an EPC of E or better, unless a valid exemption applies. GOV.UK says that from 1 April 2018 new tenancies could not be granted at F or G, and from 1 April 2020 the rule reached existing lets too. In a flat, LED lighting, better heating controls and a modern hot water cylinder are the usual ways a refurbishment lifts the rating.
Is there selective licensing for a let flat in Canary Wharf?
Not from 1 October 2026, when Tower Hamlets says there will be no selective licensing scheme in the borough. Sharers are a different matter. The additional scheme, which lists Canary Wharf among its wards, covers privately let homes, including flats, occupied by three or more people forming two or more households. The landlord or agent checks the position and applies, and we refurbish to the conditions.
Does renewing a bathroom in a Canary Wharf flat need building control?
Replacing fittings like for like does not, but parts of the job are notifiable. A new circuit, a new consumer unit or electrical work in the bathroom zones is certified by a registered electrician, which is the route Tower Hamlets Council's domestic charges assume. A new unvented cylinder is notified by its installer in the same way. Any hole cut through the flat's walls or floor for pipes or an extract duct is fire stopped again, and the managing agent usually wants to see that done.
Who deals with the front door and fire safety in a block?
The flat entrance door and the fire separation around the flat are usually the freeholder's or responsible person's concern, not only yours, so ask the managing agent before changing them. We do not remove or alter a fire door or cut through a compartment wall without their written approval, and any hole made for services is fire stopped again.
Can a new consumer unit be fitted in a Canary Wharf flat?
Yes, as notifiable electrical work installed by a registered electrician, who certifies it. In a block the supply often comes from a landlord's riser, so the managing agent books any shutdown and may want the certificate for its records. Electric panel heaters and immersion controls are often renewed at the same time, which also helps the flat's EPC.
Can the refurbishment be finished before a flat goes on the market?
Yes, if the programme is set from the target date backwards. We allow for the managing agent's approval, material lead times and any building control visits, then plan the trades so the flat is cleaned and snagged before photographs or viewings. A new kitchen, flooring and the electrics tend to set the length of that programme, so they are ordered and booked first.
Every Service, One Team
More GS Renovation Services in Canary Wharf
One team for every GS Renovation service in Canary Wharf:
Same Service, Nearby Areas
Flat Refurbishment Near Canary Wharf
We carry out flat refurbishment across Canary Wharf and the surrounding areas. Explore a nearby location:
Ready to Start Your Canary Wharf Project?
Free, no-obligation quote for flat refurbishment in Canary Wharf.