Open-Plan Conversions Canary Wharf

Open-plan kitchen, diner and living conversions in Canary Wharf, steel, floors, heating and finishes as one job.

GS Renovation creates open-plan living across Canary Wharf, from broken-plan layouts in older Docklands flats to bright kitchen-diners in new-build riverside apartments. We knock through safely, insert steelwork where needed and coordinate the leasehold consents so your open space is delivered without compromise.

In Canary Wharf, a knock-through finished as one room typically costs £3,000 to £8,000 or more, including the steel beam (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Canary Wharf: the structural engineer we appoint designs the steel, we install it, and building control signs it off.

Price guide

WorkIndicative London range
Open-plan conversion, steel beam and finishing£3,000 to £8,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Open-Plan Kitchen-Diner Ideas.

How the job runs

  1. Free site survey at your Canary Wharf address, covering the walls, services and floor levels, and an itemised quote.
  2. The engineer we appoint sizes the beam, and the work is registered with Tower Hamlets Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
  3. Props in, opening cut, beam on padstones; then floors, heating and electrics are joined up.
  4. Building control inspects the steel before it is covered. We finish the room, and the completion certificate follows.
A steel beam installed by GS Renovation over a widened opening onto the garden, with the floor above still propped
The beam seated over a rear opening. Props remain until the bearings are built up and the load is taken.

Open-plan living in Canary Wharf apartments

The contemporary character of E14 lends itself to open-plan living, and in many new-build apartments the wall between kitchen and living space is a lightweight partition that comes out easily to form a single sociable room. In older Docklands blocks the picture is different: generous ceiling heights and heavier structure invite broken-plan schemes and Crittall-style dividers that zone the space without closing it in.

Whether it is a simple knock-through or a wider structural opening, we start by confirming what each wall does. Where a wall is load-bearing, the engineer sizes a steel beam, seated on padstones in masonry or fixed to a concrete frame with brackets, and we prop, demolish in stages and install the steel before making good. Where it is a partition, we remove it cleanly and address the floor, ceiling and services that run through it.

Housing in Canary Wharf

The valuation list shows roughly 22,070 homes in the Canary Wharf, Millwall and Cubitt Town statistical areas, of which 2% are pre-1919, 2% interwar and 95% post-1945, split 92% flats to 8% houses. Most homes here are flats, and opening up a flat in Canary Wharf changes its fire escape route, which building control checks.

Choosing the approval route for a Canary Wharf open plan

Tower Hamlets Council states that whether you deposit full plans or give a building notice, the total building control charge payable is the same. That takes cost out of the choice between them. In Canary Wharf, where 92% of homes are flats, an open-plan layout changes how people escape from the bedrooms, and the freeholder is likely to want that settled before a licence to alter is issued. A full plans approval gives you drawings the council has already checked, which is the document the freeholder's surveyor can rely on.

The route also shapes the inspections. For full plans and building notice applications the council inspects the work at the start, at the end and at various stages. In an open-plan conversion the stage worth planning around is the one where the new ceiling, any fire doors and any detection are in place but not yet decorated. We sequence a Canary Wharf open plan so those elements finish together, which lets one visit see them all rather than several visits chasing loose ends while the decorators wait.

Consents and neighbours in E14

Open-plan work in a leasehold Canary Wharf flat runs through the freeholder and managing agent, so we put the engineer's drawings in front of them for the licence to alter and schedule the noisier work within the building's rules on hours and communal-area protection. Living close to neighbours in a riverside block, sound insulation between dwellings is designed in wherever floors or structural elements are altered.

Any structural opening is notifiable under the Building Regulations and certified by Tower Hamlets Council building control, with no planning permission needed for this internal work. We manage the sequence so your kitchen-diner or broken-plan space is delivered as one coordinated project: engineer, consents, steelwork, propping, first and second fix, and a clean finish, signed off by building control, that you can move straight back into.

A listed building is the exception: work that affects its character, inside or out, including an extension or taking out a wall or chimney breast, needs listed building consent from Tower Hamlets Council, and doing it without consent is a criminal offence.

  • Flush beam detailing where a downstand would look wrong
  • Heat loss and acoustic considerations before the wall comes out
  • Zoned lighting circuits and dimming for a multi-use room
Service areaCanary Wharf · E14
Local authorityTower Hamlets Council
Part ofEast London (Inner London)
Typical homesContemporary riverside apartments
Housing stock2% built before 1919, 2% interwar, 95% post-war; 92% flats, 8% terraced, 1% semi-detached or detached
Also covered nearbyBow, Wapping, Bethnal Green, Whitechapel and Stratford

VOA Council Tax stock of properties, March 2025, for the Canary Wharf, Millwall and Cubitt Town statistical areas, which together cover the Isle of Dogs. Counts rounded by the VOA.

Why Canary Wharf Homeowners Choose GS Renovation

Homeowners across Canary Wharf choose GS Renovation because we deliver open-plan conversions as a single accountable project: structural engineer, freeholder licence to alter, managing-agent coordination and Tower Hamlets building control all handled. We prop and cut steel safely, protect an occupied E14 flat throughout, and bring our founder's 30+ years of structural experience to every knock-through.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Adil KhanWoolwich, London · via MyBuilder
★★★★★
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
sophie35636Wanstead, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Open-Plan Conversions Canary Wharf

Can you quote open-plan conversion for an E14 property over the phone?

GS Renovation will not give a real quotation for open-plan conversion in Canary Wharf over the phone, only the range, £3,000 to £8,000 or more (indicative). On 07472 424 226 we can explain what moves the cost and whether the job needs the engineer's calculations and building regulations approval of the steel, but the E14 property has to be seen first. Builders who quote blind across Tower Hamlets revise the figure once the floor or walls are opened.

Can I make my Canary Wharf apartment open-plan if the wall is load-bearing?

Sometimes. In a concrete-framed block most walls between rooms are non-structural partitions, which can come out with consent. Where a wall does carry a floor, an opening can often be formed on a steel beam designed by a structural engineer, fixed to the frame with brackets or seated on padstones in masonry, and signed off by Tower Hamlets building control. Walls that form part of the frame, a core or a stability wall cannot be removed. In your leasehold E14 flat you also need the freeholder's licence to alter through the managing agent. We coordinate the engineer, the consents and the steelwork as one project.

Does an open-plan layout in a Canary Wharf flat need a fire strategy?

Yes. With 92% of Canary Wharf homes recorded by the VOA as flats, most open-plan conversions here change the escape route from the bedrooms to the front door. Under Part B, building control has to agree a fire strategy before the wall comes out. The block's own fire strategy may also affect what the freeholder will accept.

Where do the ducts and cables go when a Canary Wharf partition is removed?

Usually into the ceiling void. Newer apartments often run ventilation ducts, wiring and sometimes pipework above a suspended ceiling or inside partitions. Removing a partition means rerouting whatever it carried, and a mechanical ventilation system, if the flat has one, must be rebalanced afterwards so each room still gets the airflow it was designed for.

Is broken-plan a better fit than full open-plan in a Canary Wharf apartment?

Often. A glazed screen or a sliding door between kitchen and living space lets light through while keeping cooking smells and noise contained. It can also make the escape route easier to satisfy under Part B, which keeps the building control discussion shorter. The layout is agreed before first fix.

What happens to the floor when a wall comes out in a Canary Wharf flat?

The gap left at its base has to match the floor either side, including any acoustic layer. Flats above other homes usually rely on that layer for sound insulation, and the lease may set a standard for it. The floor is rebuilt to that standard before the new finish runs across the room.

Does taking out a non-structural partition in a Canary Wharf flat need building control?

Not because of the structure. Tower Hamlets Council says building regulations approval is needed for alterations to the structure of the building, which a partition that carries no load is not. The fire side is different. If the partition forms part of the protected route from the bedrooms to the front door, removing it is a change the regulations still cover, so the layout is checked before the wall comes out. We ask that question at survey, before any demolition is booked.

How much notice does building control need before a Canary Wharf wall comes down?

At least two working days. A commencement notice has to reach Tower Hamlets Council at least two working days before work starts under a building regulations application. In a Canary Wharf block the managing agent often wants longer notice than that for the lift and the corridor protection, so the agent's date sets the real start. We send the commencement notice once that date is fixed, so the council's record and the building's record show the same day.

How is the Tower Hamlets charge for an open-plan alteration worked out?

From the estimated cost of the work. For internal or structural alterations to a single domestic building, Tower Hamlets publishes a plan charge, an inspection charge and a building notice charge against the estimated cost. The figure on the application should therefore be the cost of the alteration itself, including the steel, the propping and the making good, rather than the cost of the whole Canary Wharf refurbishment. We give you that figure separately from the finishes.

Same Service, Nearby Areas

Open-Plan Conversions Near Canary Wharf

We carry out open-plan conversion across Canary Wharf and the surrounding areas. Explore a nearby location:

Ready to Start Your Canary Wharf Project?

Free, no-obligation quote for open-plan conversion in Canary Wharf.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote