Chimney Breast Removal Epping
Chimney breast removal with steel beam support in Epping, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- Guide from £2,200 (London-derived)
- Free site survey, itemised quote
Removing a chimney breast means removing something that is carrying weight, along with whatever sits above it. The support has to be designed, whether that is a steel beam, or gallows brackets where the engineer and building control accept them, and building control has to see it before it is covered up. We appoint the structural engineer and build to the design issued. Free, no obligation quotations, and the company is fully insured.
For Epping, on London-derived ranges removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors; Essex work generally runs below that. GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Epping.
Price guide
| Work | Indicative range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Essex work generally runs below the London figures; your price follows a site visit. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your Epping address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Epping Forest District Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Epping treats chimneys as part of the town's character
The Epping Town Neighbourhood Plan lists pargeting, iron railings and tall ornate chimneys among the town's vernacular features it seeks to retain. The Epping Conservation Area Character Appraisal describes the north western side of the High Street as steeply pitched handmade red clay tile roofs at different heights, with gables, chimneys and dormer windows breaking the roofline at intervals. If your stack forms part of that roofline, taking it down is a heritage and planning question as well as a structural one. Removing the breast internally and leaving the stack standing is the alternative, and it changes what support the remaining brickwork needs.
Housing in Epping
Count the homes in Epping and you get about 6,120: 73% built since 1945, 13% between the wars and 14% before 1919, with flats at 23% and houses at 77%. 28% of homes here are semi-detached; the shared stack of a semi in Epping means a party wall notice before removal.
The older High Street buildings have complicated stacks
Numbers 98 to 102 (even) High Street, Epping are Grade II listed plastered timber framed houses of the 17th and 18th centuries with a diagonal chimney stack. 29 Church Hill is a Grade II listed former two bay open hall of about 1550, with a 17th century floor inserted over the entire plan area and an infilled inglenook at its south east end.
A diagonal stack, an inserted floor and an infilled inglenook all change where load travels. In buildings like that the breast can be doing more than carrying itself, so an opening up survey comes before any fixed price. We do not assume the arrangement above from what the room below looks like.
What it costs, and what consent it needs
A steel beam is now the usual support: for one floor on a beam, expect £2,200 to £3,250, or £1,500 to £2,500 where the engineer and building control accept gallows brackets instead. For two floors, £3,000 to £5,000 (indicative London ranges, MyBuilder and Checkatrade, 2026). Which support the engineer specifies is what moves you between those figures, so it is settled before the quotation is issued.
Consent is the other half of the answer. The Epping Town Neighbourhood Plan records 47 statutorily listed buildings in Epping High Street, and in a listed building the removal of a breast or a stack needs listed building consent as well as building regulations approval. We tell you which applies to your address before anything is opened up.
- Hearth removal and floor structure reinstatement
- Programme planned around party wall notice periods for a shared stack
- Ventilated caps and airbricks to disused flues
VOA Council Tax stock of properties, March 2025, for Epping North and Epping South. Counts rounded by the VOA.
Why Choose GS Renovation in Epping
A chimney breast is one of the few structural jobs where the heritage question can outweigh the engineering one. The neighbourhood plan names tall ornate chimneys as a feature the town wants to keep, and the High Street roofline is part of the conservation area's described character. We handle both sides: we appoint the engineer who designs the support, run the building control application, and give you a straight answer on whether consent is needed first. One point of contact throughout.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Excellent service. George's knowledge and skills are the best in the market. He knows what he is doing, does really high quality work, gives good…
He was very very good. He just got on with the job and we was beey pleased with the result. He Also cleaned everything away when he finished. Will…
FAQ
Frequently Asked Questions about Chimney Breast Removal Epping
Which parts of a chimney breast removal project in Epping cost the most?
Which part of a chimney breast removal project in Epping costs most depends on the house, which is why the survey comes first. In older stock reinstatement often outweighs the structural element; a newer CM16 property is the other way round. GS Renovation prices the two separately within £2,200 to £3,250 for one floor on a beam (London-derived), so phasing is possible, provided the order holds: the stack above is supported before the breast below comes out.
What can the roof be patched with when a stack comes down in the conservation area?
Match what is already on the roof. The Epping Conservation Area Character Appraisal names plain clay tiles, pantiles and slate as the roof coverings of the area, and the management plan asks that unsympathetic modern materials such as uPVC, untreated aluminium and concrete roof tiles are discouraged. A patch in concrete tile is a poor answer inside the boundary. The matching tile and the flashing detail are priced into the quotation.
What is behind the plaster in a house from the rebuilding after the fire?
Expect an arrangement that has changed since the house was built. The Epping Town Neighbourhood Plan records that much of the town was rebuilt in the mid 18th century after a major fire destroyed much of its earlier fabric, and the council records the listed High Street buildings as substantially altered internally during the 19th century. Flues get blocked, stacks get rebuilt above roof level and breasts get partly removed. Opening up settles it.
Can one side of a shared chimney in a semi detached house be removed?
Your side can, once the support for what remains is designed. Epping Lindsey and Thornwood Common ward alone contained 1,172 semi detached households at the 2021 census, and in that house type the stack sits in or against the party wall. Removing your half changes what carries the shared brickwork above, so the Party Wall etc. Act 1996 runs alongside building regulations approval. You serve notice on the neighbour as building owner before work starts, or your surveyor does, and we give you the drawings it needs.
Can a breast be removed from a flat when it continues into the flat above?
Not on its own. Epping Hemnall ward contained 626 households in purpose built flats at the 2021 census, and in that arrangement the breast being removed still carries brickwork belonging to another home. The support has to be designed for the whole remaining stack, the freeholder and the lease terms come into the decision, and building regulations approval covers the structural work. The survey starts with what sits above, not below.
Every Service, One Team
More GS Renovation Services in Epping
One team for every GS Renovation service in Epping:
Same Service, Nearby Areas
Chimney Breast Removal Near Epping
We carry out chimney breast removal across Epping and the surrounding areas. Explore a nearby location:
Ready to Start Your Epping Project?
Free, no-obligation quote for chimney breast removal in Epping.