Chimney Breast Removal Loughton
Chimney breast removal with steel beam support in Loughton, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- Guide from £2,200 (London-derived)
- Free site survey, itemised quote
Taking out a chimney breast frees up floor space and removes part of what holds the stack above. The support for what stays has to be designed before anything comes out. We appoint the structural engineer, build to their calculations, and coordinate building control with Epping Forest District Council.
For Loughton, on London-derived ranges removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors; Essex work generally runs below that. GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Loughton.
Price guide
| Work | Indicative range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Essex work generally runs below the London figures; your price follows a site visit. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your Loughton address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Epping Forest District Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Which Loughton houses still have chimney breasts to remove
Chimney breasts belong to the older part of Loughton's housing. Across the four Loughton statistical areas, 620 domestic properties date from before 1900 and a further 380 from 1900 to 1918. Epping Forest District Council records that, with a few exceptions, all the buildings in the Staples Road Conservation Area were built in the last three decades of the 19th century.
Houses of that date were built around their flues. A breast in a ground floor room, a breast above it and a stack at roof level are one structure. Removing part of it means carrying the rest, which is the whole of the design problem.
Housing in Loughton
Take the 14,420 or so homes the valuation list gives Loughton: 28% flats, 72% houses, 7% from before 1919, 17% interwar and 76% post-war. 32% of homes here are terraced; a terrace breast in Loughton usually sits on the party wall, so removal needs a notice.
What holds the stack up once the breast goes, and what it costs
The load left above the removal has to land somewhere. A steel beam on padstones is now the usual answer, and gallows brackets bolted to the party wall are used only where the engineer and building control accept them after the brickwork has been inspected. The Staples Road appraisal describes the street as retaining a late Victorian and Edwardian streetscape characterised by brick, bay fronted, semi-detached houses. In a semi, that party wall is shared, so the design has to consider the house next door.
Indicative ranges put a chimney breast on one floor supported on a steel beam at £2,200 to £3,250, the same removal where gallows brackets are accepted at £1,500 to £2,500, and two floors at £3,000 to £5,000 (indicative London ranges, MyBuilder and Checkatrade, 2026).
Listed buildings and work in a conservation area
A chimney breast in a listed building is a different job on paper before it is a different job on site. Epping Forest District Council states that there are over 1,300 listed buildings in the Epping Forest district, of which 16 are Grade I. Listed building consent covers internal features, so a breast, a fireplace or a stack in a listed house cannot simply be taken out.
Where the house is not listed, internal removal is a building control matter. Taking a stack down below the roof line changes the outside of the building, and in a conservation area that is worth putting to the council before the scaffold is booked.
- Hearth removal and floor structure reinstatement
- Full chimney stack removal and roof making good
- Ceiling and joist support where the breast carried them
VOA Council Tax stock of properties, March 2025, for Loughton East, Loughton North, Loughton South and Loughton West. Counts rounded by the VOA.
Trusted Chimney Breast Removal in Loughton
On a chimney breast the part you keep matters more than the part you take away. The breast above, the stack at roof level and a shared party wall all rely on what is being removed, so the survey starts at the roof and works down. We appoint the engineer, build the support to their design, and make good the floor, ceiling and wall so the room reads as though the breast was never there.
Reviewed jobs near Loughton
1 MyBuilder review from Chigwell, with each customer's own job title:
- Require an ensuite shower room to be completely redone, Chigwell, 25 Jun 2021 (5 out of 5)
Read all 31 on our reviews page.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Excellent service. George's knowledge and skills are the best in the market. He knows what he is doing, does really high quality work, gives good…
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
FAQ
Frequently Asked Questions about Chimney Breast Removal Loughton
What is included in your chimney breast removal price in Loughton?
Every chimney breast removal quotation for a Loughton property lists the structural work, the following trades, the Epping Forest District Council building control inspections and the making good, inside £2,200 to £3,250 for one floor on a beam (London-derived). Site protection and the daily clear-up at IG10 are included. The scope is written against what decides the job, because what remains of the Loughton stack above decides the beam that carries it.
What is the roof made good with where the stack came through?
With materials that match what is already on the roof. Marian and Georgiana Villas at 35 and 37 Staples Road are yellow stock brick with red brick dressings, slate roofs and brick dormers, which is the standard the making good has to reach on a roof of that kind. Slate is replaced with slate. The rafters and battens are made good where the stack passed through, and the covering is closed back to the line.
The stack is shared with next door, so can your side still come out?
Only where everything left standing keeps its support, and that includes the neighbour's flues. Loughton has 4,520 terraced houses and 3,300 semi-detached houses, and where the stack sits in a wall shared with another home the design has to account for the other side of it. Work to a shared wall can also engage the Party Wall etc. Act 1996. You serve that notice as building owner, or a party wall surveyor does it for you; we tell you when it is needed and give you the drawings for it.
Will gallows brackets hold in the brickwork of a Baldwins Hill house?
That is for the engineer and building control to decide once the wall has been inspected, and a steel beam is now the more usual route. The Baldwins Hill appraisal records a mixture of Essex red and yellow London stock bricks in the brickwork there. The reds are used as surrounds to openings and as band courses, and the yellows provide the main bulk of the wall. What a bracket can be fixed into depends on the condition of that brickwork and its mortar, so the wall is opened up first.
Does taking the stack down on a Staples Road house need planning permission?
Where the roof slope concerned fronts Staples Road, yes. The Article 4 direction covering that conservation area, made on 4 April 1996, means alteration to a roof slope fronting that highway needs planning permission, because the permitted development right has been withdrawn. A stack on a rear slope is a separate question. Removal of the breast inside remains building control work either way, and both routes are settled at survey.
Every Service, One Team
More GS Renovation Services in Loughton
One team for every GS Renovation service in Loughton:
Same Service, Nearby Areas
Chimney Breast Removal Near Loughton
We carry out chimney breast removal across Loughton and the surrounding areas. Explore a nearby location:
Ready to Start Your Loughton Project?
Free, no-obligation quote for chimney breast removal in Loughton.