Bathroom Renovation Shoreditch
Bathroom and wet-room refurbishment in Shoreditch, tanked, plumbed and tiled by one team.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £6,000 to £20,000+
- 10 to 15 working days on site
- Free design visit, itemised quote
GS Renovation fits bathrooms, wet rooms and en-suites throughout Shoreditch, working in E2 warehouse conversions and new-build apartments alike. We get the waterproofing, drainage and ventilation right first, then finish with tiling, underfloor heating and space-saving layouts that suit the way these homes are built.
In Shoreditch, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Shoreditch: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Bathroom renovation, full refit | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.
Quick estimate for Shoreditch
Shoreditch range: choose above
How the job runs
- Free design visit at your Shoreditch home and an itemised quote.
- Strip-out, then first-fix plumbing and electrics.
- Tanking to the wet areas, then tiling.
- Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.

Waterproofing bathrooms in Shoreditch flats
In a Shoreditch flat, a leak affects more than your own home, so the waterproofing has to be right. We tank walls and floors properly before any tile goes on, form falls correctly in wet rooms and walk-in showers, and make sure the drainage and mechanical ventilation are up to the job. Getting the tanking and extraction right protects the flat below and keeps you onside with your neighbours and freeholder.
Warehouse conversions and apartments often carry existing soil and waste routes that cannot be moved easily. We plan the layout around those fixed points, adjusting the design rather than fighting the building, and keep sound between units in mind when we build up floors and stud walls. Notifiable electrical work is certified by a registered electrician under Part P or notified to building control, so the finished bathroom is compliant as well as watertight.
Housing in Shoreditch
Take the 11,700 or so homes the valuation list gives Shoreditch: 94% flats, 6% houses, 24% from before 1919, 4% interwar and 72% post-war. Where most homes are flats, a bathroom in a flat in Shoreditch sits over a neighbour's ceiling, so tanking comes first.
Shoreditch bathrooms in converted buildings with timber floors
24% of homes in Shoreditch were built before 1919. A bathroom in one of those older buildings, whether a converted warehouse or a Victorian house, may sit on timber joists or boards laid over an old industrial floor rather than on concrete. Timber moves, and tiles laid on a floor that flexes crack at the grout lines, which is where leaks start. We check the floor before the design is agreed, and where needed overboard or stiffen it so the tanking and tiles sit on something rigid. A shower tray waste crossing the joists is set out with the structural engineer we appoint where notching would weaken them.
Below that floor is somebody else's home. 94% of homes in Shoreditch are flats, and a bathroom leak here shows up on a neighbour's ceiling. The floor between flats is also a fire and sound barrier, so every pipe that passes through it is sealed back to the same standard. We photograph the tanking, the sealed pipe penetrations and the waste connections before tiling, and keep those photographs with the job file. If the flat below reports a mark in a year's time, there is a record of how the floor was built.
En-suites and layouts for E2 homes
Space is often tight in E2, so a well-planned en-suite or compact family bathroom can make a real difference. We design walk-in showers, wall-hung sanitaryware and clever storage to free up floor area, and add underfloor heating to keep bulky radiators off the wall. In a conversion with generous ceiling height, a walk-in wet room can feel genuinely spacious even in a modest footprint.
Because we run the whole job in-house, the first fix plumbing, tanking, tiling, heating and second fix all follow one sequence with no gaps between trades. In a leasehold building we agree access and working hours with the managing agent and protect shared areas during the work. You get a durable, well-ventilated Shoreditch bathroom, delivered tidily and finished to a high standard.
- Full plumbing, drainage and waterproofing (tanking)
- Freestanding and built-in bath installation
- Notifiable bathroom electrics certified by a registered electrician under Part P
VOA Council Tax stock of properties, March 2025, for Shoreditch, Columbia Road and Brick Lane North. Counts rounded by the VOA.
Why Choose GS Renovation in Shoreditch
Shoreditch owners choose GS Renovation because we treat waterproofing as the priority it is in a stacked building. Tanking, drainage and ventilation are done properly, layouts are planned around fixed soil pipes and sound separation, and managing agents are kept informed, all backed by one accountable team and our founder's 30+ years on the tools.
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about Bathroom Renovation Shoreditch
Which parts of a bathroom renovation project in Shoreditch cost the most?
On a bathroom renovation project in Shoreditch the approvals are a small line and the time on site the large one, within £6,000 to £20,000 or more (indicative). The cost of building regulations compliance for any new drainage, extraction or notifiable electrics is small next to labour, but skipping it costs a sale. The days on site are set by the property itself: the route for an extract duct to outside decides how much ceiling comes down.
How do you stop a new Shoreditch bathroom leaking into the flat below?
We tank the walls and floor fully before tiling, form correct falls to the drain, and make sure waste connections and ventilation are sound. In a stacked E2 building that tanking is essential, because a leak affects your neighbours as well as you. We also build up floors with sound and movement in mind, and the electrics are certified by a registered electrician under Part P.
Does electric underfloor heating in a Shoreditch bathroom need certifying?
Yes. A new circuit in a bathroom is notifiable under Part P, so the mat and its supply are installed and tested by a registered electrician who issues the certificate. The mat goes down in sequence with the tanking and tile adhesive, and its thermostat position is fixed at first fix.
Can a second bathroom be added to my Shoreditch flat?
Often, if drainage and the lease allow it. The new room needs a waste route with a proper fall to the shared stack, which decides where it can go. Where that is impossible, a pumped system can help for some fittings. The freeholder's consent is needed, and extraction must be ducted outside.
How long will my Shoreditch bathroom renovation take?
Around 10 to 15 working days on site. In a block, that also depends on lift bookings, rubbish removal routes and the managing agent's working hours, which are agreed before strip-out. Falls are set before the tray, and tanking is complete before any tile goes on.
Where can sockets and lights go in a Shoreditch bathroom?
Distance from the bath and shower decides it. Near water only fittings rated for that position are allowed, and standard sockets stay out of the room, a shaver point being the usual exception. Because this is bathroom wiring, Part P applies, and the registered electrician who installs it issues the test certificate at the end.
Does a Shoreditch bathroom refit need notice to building control?
When it includes notifiable work, such as a new drain connection or a structural change, yes. For a Hackney address, the start date has to reach Hackney Building Control at least 48 hours ahead, and that is a statutory requirement rather than a courtesy. Electrical work in a bathroom is normally self-certified under Part P by an electrician registered with a competent person scheme. A like for like swap on the same connections is simpler, and we confirm what is notifiable at the survey.
Can a bathroom be moved in a listed Shoreditch building?
Sometimes, with listed building consent. Hackney Council says there are around 1,300 listed buildings in Hackney, on a list compiled and maintained by Historic England. In one of them, running new soil pipes through original floors or walls can need consent as well as building regulations approval. Keeping the bathroom where the services already run, and fitting it without cutting historic fabric, is usually the easier route.
Why is moving a bathroom harder in a newer Shoreditch block?
The floor. 38% of homes in Shoreditch were built in 2000 or later, and in a block that recent the floor may be concrete with a thin screed and an acoustic layer. A new waste position needs a fall, and cutting a channel through the screed can damage the acoustic layer beneath. A raised floor or a pumped waste can avoid that, but both need the managing agent's agreement first.
Every Service, One Team
More GS Renovation Services in Shoreditch
One team for every GS Renovation service in Shoreditch:
Same Service, Nearby Areas
Bathroom Renovation Near Shoreditch
We carry out bathroom renovation across Shoreditch and the surrounding areas. Explore a nearby location:
Ready to Start Your Shoreditch Project?
Free, no-obligation quote for bathroom renovation in Shoreditch.