Steel beam installation, RSJ and structural alterations in Shoreditch. Trusted, professional, 30+ years' hands-on experience.
GS Renovation installs steel beams and RSJs across Shoreditch, from the brick warehouse conversions off the E2 backstreets to the newer riverside apartments nearby. With more than 30 years opening up characterful spaces safely, The engineer sizes every beam to a structural engineer's calculations and see it through building control sign-off.

Many Shoreditch homes are former industrial buildings, so the internal structure varies from thick loadbearing brick piers to timber and cast-iron frames. Before any wall comes down in an E2 conversion, our structural engineer inspects the build-up and specifies the correct RSJ, its bearing length and the padstones it must sit on. We never guess at what is holding the floors above, because a warehouse frame rarely behaves like a standard terrace.
On site we install temporary propping first, then remove masonry in staged, controlled sections so nothing is left unsupported. The steel is lifted into place, bedded onto its padstones and packed tight, and building control inspects the finished work. In a leasehold conversion we also coordinate with your managing agent and check the freeholder's licence to alter before we start.
Shoreditch conversions frequently share dividing walls and floor structures with neighbouring units, so beam work often touches a party wall. Where the wall between you and the next flat is shared, the Party Wall Act applies and formal notice must be served before we cut in a bearing or pocket a padstone. We flag this early so the notice period runs alongside the design stage rather than delaying the build.
New-build apartments near the water bring different constraints. Structural change is limited by the building's design and management rules, and sound insulation between flats must be maintained. We work within those limits, keep the building manager informed of propping and access, and make sure any beam we introduce is signed off under building regulations rather than assumed to be permitted.
Shoreditch homeowners choose GS Renovation because we treat warehouse and new-build structures with the caution they need. One team handles the engineer's calculations, the propping, the safe demolition and the building control sign-off, with clear pricing and 30+ years of steelwork across Hackney behind every install.
He was very very good. He just got on with the job and we was beey pleased with the result. He Also cleaned everything away when he finished. Will…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
FAQ
The scope is written out rather than implied. For a Shoreditch property the RSJ and steel beam installation quotation lists the structural work, the trades that follow it, the Hackney Council inspections and the making good that modern and recently converted construction usually needs. Site protection and the daily clear-up at E2 are included as standard. GS Renovation does not treat basic care of your house as an extra. Ring 07472 424 226 and we will confirm what applies at your E2 address. As a rough guide, RSJ and steel beam installation in London runs roughly £1,500 to £4,000 for the beam itself on a single straightforward opening, covering supply, installation and building control sign-off; a full knock-through including taking the wall out, the structural engineer's fee and making good more typically comes to £2,500 to £6,500 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). Your figure depends on the size, specification and condition of the property, which is why we survey before quoting.
You hear it from us first, with the reason and the revised dates. If RSJ and steel beam installation at your E2 property runs beyond the programme, GS Renovation explains whether the cause is a discovery in a modern and recently converted structure, a Hackney Council inspection slot or something of ours. Fixed-price work does not become more expensive because it took longer. The Shoreditch updates continue weekly regardless. Ring 07472 424 226 and GS Renovation will explain how an E2 overrun is handled.
Not a call centre, and not a different voice each week. GS Renovation assigns one manager to your RSJ and steel beam installation project, who surveys the E2 property, writes the programme and stays accountable until the Hackney Council certificate is issued. That is the single biggest reason Shoreditch clients say the process felt calm. Ring 07472 424 226 and you will speak to them about your Hackney job directly. That manager is your only point of contact in Hackney.
A structural engineer, always. GS Renovation is a contractor: we appoint and coordinate the engineer, then build to their specification. The calculations size the beam, the padstones and the bearings for your E2 opening, and Hackney Council inspects against that design.
Damp, decayed timber and load paths that are not where anyone expected. Loft-style conversions with exposed brick, steel and full-height glazing hide all three, which is why RSJ and steel beam installation at an E2 address starts with careful opening up rather than demolition. GS Renovation tells a Shoreditch homeowner immediately and prices the fix in writing. Nothing proceeds on a Hackney site until you have agreed it. Email info@gsrenovationltd.co.uk and we will explain how RSJ and steel beam installation variations are agreed at an E2 property.
Usually yes. In E2 warehouse conversions the dividing wall is often shared with the flat next door, so cutting a bearing or padstone into it triggers the Party Wall Act. We identify this at the design stage and serve notice in good time, so the required period runs while the engineer finalises the beam and it does not hold up your build.
Usually yes, and you are welcome to ask what and where. GS Renovation runs RSJ and steel beam installation projects across Shoreditch and Hackney most weeks, which is why an E2 survey can often be arranged quickly. Seeing work in progress or recently finished nearby tells you more than a brochure. Ring 07472 424 226 and we will tell you what is current. References in Dalston are available too. Seeing a finished E2 project in person is worth the trip.
Every Service, One Team
The same trusted team, 30+ years' hands-on experience and free, no-obligation quotes apply to every GS Renovation service in Shoreditch. Explore what else we do locally:
Same Service, Nearby Areas
We carry out RSJ and steel beam installation across Shoreditch and the surrounding areas. Explore a nearby location:
Free, no-obligation quote for RSJ and steel beam installation in Shoreditch. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.