Bathroom Renovation Stoke Newington
Bathroom and wet-room refurbishment in Stoke Newington, tanked, plumbed and tiled by one team.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £6,000 to £20,000+
- 10 to 15 working days on site
- Free design visit, itemised quote
GS Renovation refits bathrooms across Stoke Newington, making the most of the often tight spaces in the Victorian and Edwardian terraces near Clissold Park. We handle the waterproofing, drainage, tiling and heating so your new bathroom is watertight, warm and built to last.
In Stoke Newington, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Stoke Newington: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Bathroom renovation, full refit | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.
Quick estimate for Stoke Newington
Stoke Newington range: choose above
How the job runs
- Free design visit at your Stoke Newington home and an itemised quote.
- Strip-out, then first-fix plumbing and electrics.
- Tanking to the wet areas, then tiling.
- Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.

Wet rooms and walk-in showers in Stoke Newington
Many Stoke Newington bathrooms sit in a converted closet wing or a boxy back addition, so proper waterproofing is essential before anything decorative goes in. We tank the walls and floor, form the falls for a wet room or walk-in shower, and lay fully bonded tanking so water goes where it should and nowhere else. Drainage and extraction are set up correctly to avoid the damp problems these older N16 houses are prone to.
Underfloor heating warms cold ground-floor and solid-floor rooms without eating into wall space, which matters in a period home. We tile floors and walls to a high standard, fit the sanitaryware and screens, and balance ventilation so moisture clears quickly. New circuits, and changes to circuits around the bath or shower, are notifiable under Part P, so the wiring for lighting, heating and extraction is installed and certified by a registered electrician as part of the work.
Housing in Stoke Newington
The stock in Stoke Newington runs to roughly 12,540 dwellings, 74% of them flats and 26% houses, built 68% before 1919, 1% between 1919 and 1939 and 31% after 1945. Where most homes are flats, a bathroom in a flat in Stoke Newington sits over a neighbour's ceiling, so it is tanked before tiling and a moved WC needs the freeholder's licence.
Shared soil stacks in converted Stoke Newington houses
74% of Stoke Newington homes are flats, and in a house converted decades ago the bathrooms of several flats can drain into one soil stack, sometimes on the rear wall and sometimes boxed inside. Before a new branch is cut in, we find out what the stack is made of. Cast iron needs the right couplings, and a grey fibre cement stack from a mid-century conversion may contain asbestos, which is sampled and tested before anyone cuts it. That check takes days, so it happens at survey stage in Stoke Newington, not on the morning of strip-out.
Working on a shared stack also means working on a pipe other households use. A new connection is made quickly and at an agreed time, with the flats above asked not to run water while the stack is open. The lease will normally treat the stack as the freeholder's, so the connection belongs in the licence request. Where the old branch serving your bathroom is lead or has been joined with makeshift fittings, replacing it back to the stack while the floor is open avoids a leak into the ceiling of the flat below a year later.
Space-saving en-suites in N16 terraces
Adding an en-suite to a Stoke Newington terrace usually means borrowing from a bedroom or squeezing a shower room into an awkward corner of the closet wing. We plan these tight layouts carefully, using compact sanitaryware, wall-hung units and sliding or pivot doors so the room works without feeling cramped. Concealed cisterns and recessed storage make the most of every centimetre.
New drainage in a period house has to run somewhere, so we plan pipe routes and falls before we start, connecting into the existing soil stack where possible. Waterproofing, tiling, heating and ventilation are all specified for the small space, and the electrics are certified by a registered electrician under Part P. The finished en-suite adds real value to an N16 home while sitting neatly within the constraints of a Victorian floor plan.
- Drainage falls set to the gully in wet rooms
- Bespoke vanity units and storage
- Soil pipe and waste re-routing within the floor build-up
VOA Council Tax stock of properties, March 2025, for Stoke Newington East & Cazenove, Stoke Newington North and Stoke Newington South. Counts rounded by the VOA.
Why Choose GS Renovation in Stoke Newington
Stoke Newington homeowners choose GS Renovation because we get the hidden work right, from tanking and drainage to electrics certified by a registered electrician, before the tiling ever goes on. We know how N16 period bathrooms and closet wings behave, we make small spaces work hard, and our founder's 30+ years on the tools means a watertight, warm result you can rely on.
Reviewed jobs near Stoke Newington
1 MyBuilder review from Stoke Newington, with each customer's own job title:
- Install new dishwasher, Stoke Newington, 24 May 2021 (5 out of 5)
Read all 31 on our reviews page.
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
I am very happy to recommend George after he completed the work on my 2 bathrooms. He worked very hard to make sure everything was completed and even…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Bathroom Renovation Stoke Newington
How do you price bathroom renovation in Stoke Newington?
GS Renovation prices bathroom renovation in Stoke Newington project by project, never by the day, against £6,000 to £20,000 or more (indicative). After the N16 survey the figure is built up from labour, materials, any Part P electrical certificate, and any Hackney Council building control fee, each priced in the order the work runs: the fall to the waste is set and the walls tanked before tiling.
Can you fit a wet room in the closet wing of my Stoke Newington terrace?
Yes. The closet wing is a common spot for a wet room in N16 terraces, though the tight footprint and solid floors need careful planning. We tank the space fully, form the drainage falls, set up extraction, and add underfloor heating to warm the cold floor. Tiling, sanitaryware and electrics certified by a registered electrician complete a watertight, hard-wearing bathroom.
How many working days does a Stoke Newington bathroom take?
Budget 10 to 15 working days. The first days are demolition and new pipe runs, the middle is waterproofing and letting it cure, the last is tiling, sanitaryware and sealant. In a Stoke Newington flat the water may be common to the house, so we agree shut-off times with neighbours and the managing agent before the old suite comes out.
Can the bathroom in my Stoke Newington flat move next to the bedroom?
Only if gravity can get the toilet's discharge back to the vertical pipe the building shares. Each metre away needs more depth under the floor for the gradient, and in a converted Stoke Newington house that depth may not exist without lifting your floor above the hallway. Past that point a macerator pump is the fallback, and the landlord normally has to approve the relocation.
Why is my Stoke Newington shower weak on the top floor?
Older houses often have gravity-fed hot water from a tank in the loft, which gives little pressure on the top floor because the tank is only just above the shower. A combi or unvented cylinder changes that, but depends on mains pressure. We test before specifying.
Can the joists in my Stoke Newington bathroom carry a cast iron bath?
Check first. A filled cast iron bath with a bather in it concentrates a lot of weight on four small feet, and joists in Stoke Newington's Victorian houses have usually been cut into by generations of plumbers. With the boards up, we measure depth and span, sister any weakened timbers and spread the feet onto bearers so the ceiling below stays intact.
Does Hackney need to hear about a Stoke Newington bathroom when it is finished?
When the bathroom included building control work, such as new drainage, yes. Hackney asks for the notice of completion to be submitted no later than five days after that work is finished. A straight swap of fittings in the same places is not normally building control work, and new electrical circuits are usually certified by a registered electrician. We list at the start which items are controlled in a Stoke Newington bathroom, so the notice and the certificates are ready together.
Can a new soil pipe run down the outside of a Stoke Newington house?
Physically yes, but in a conservation area check first. Stoke Newington conservation area runs along Church Street to include substantial parts of the High Street. Hackney says works inside its conservation areas can need planning permission even where the same work elsewhere would not. For a house there, a soil pipe on a wall that fronts a highway and forms the front or a side elevation falls outside permitted development, and in a converted house of flats any new outside pipe can need permission. A pipe boxed inside avoids the question, and on a house a rear wall is usually fine.
Should the water supply be checked before a Stoke Newington bathroom refit?
Yes, before the fittings are chosen. 68% of Stoke Newington homes were built before 1919, and houses of that age can still have lead supply pipework or a supply shared between flats. A new shower or a second bathroom can expose low flow that the old suite never showed. We test flow and pressure at the start, and where lead is found, replacing it while floors are up is far simpler than after the new bathroom has been tiled.
Every Service, One Team
More GS Renovation Services in Stoke Newington
One team for every GS Renovation service in Stoke Newington:
Same Service, Nearby Areas
Bathroom Renovation Near Stoke Newington
We carry out bathroom renovation across Stoke Newington and the surrounding areas. Explore a nearby location:
Ready to Start Your Stoke Newington Project?
Free, no-obligation quote for bathroom renovation in Stoke Newington.