Bathroom Renovation Hackney

Bathroom and wet-room refurbishment in Hackney, tanked, plumbed and tiled by one team.

GS Renovation refits bathrooms and en-suites across Hackney, from post-war estate flats and compact terraced houses near London Fields to warehouse conversions in Shoreditch and Hoxton. We handle the waterproofing, drainage, tiling and heating, whether you are a leaseholder in a modern block or the owner of a period home.

In Hackney, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hackney: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.

Price guide

WorkIndicative London range
Bathroom renovation, full refit£6,000 to £20,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.

Quick estimate for Hackney

Hackney range: choose above

How the job runs

  1. Free design visit at your Hackney home and an itemised quote.
  2. Strip-out, then first-fix plumbing and electrics.
  3. Tanking to the wet areas, then tiling.
  4. Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.
A bathroom fitted by GS Renovation with a panelled bath, wall-hung WC and a floating double vanity
Concealed cistern behind the tiled wall, wall-hung pan and a floating vanity, all set out to the tile grid.

Waterproofing bathrooms in Hackney flats

In Hackney's conversions and new-build apartments, a bathroom sits above someone else's ceiling, so getting the waterproofing right is not optional. We fully tank the walls and floors before tiling, form falls to the drainage, and detail wet rooms and walk-in showers so water goes where it should. Reliable extraction and ventilation keep moisture down in flats where the windows are often fixed or limited in the bathroom.

Because moving soil pipes and waste in a leasehold flat affects the units below, we plan the drainage carefully and confirm what the lease and managing agent permit before altering services. Sound and waterproofing details are built to meet building regulations, and any notifiable electrical work near the bathroom is certified by a registered electrician under Part P or notified to building control. The result is a clean, well-sealed en-suite or bathroom that protects your flat and the ones around it.

Housing in Hackney

About 120,710 homes are listed for Hackney, and the mix is 17% houses to 83% flats, with 56% built after 1945, 8% in 1919 to 1939 and 35% earlier. Most homes here are flats, and a bathroom in a flat in Hackney sits over a neighbour's ceiling, so tanking comes first.

Bathrooms over someone else's ceiling in Hackney flats

83% of homes in Hackney are flats, so a bathroom refit here usually happens above someone's bedroom or kitchen. The details that matter are the ones you cannot see afterwards: the waterproofing under the tiles, the fall of the waste to the soil stack, and whether the new pipes pass through a floor that separates two homes. A floor between flats is a sound and fire barrier, so every hole cut through it for a pipe is sealed again to the same standard. We photograph the tanking and the sealed penetrations before tiling, so if the flat below ever reports a stain there is a record of how the floor was built.

In a Hackney flat divided out of an older house, and 35% of the borough's homes were built before 1919, the bathroom floor is typically timber joists rather than concrete. A new bath or shower tray waste has to cross those joists to reach the stack, and notching deep into a joist to get the fall weakens the floor under the heaviest fittings in the flat. The structural engineer we appoint sets the limits for notches and holes where the run is long, and a raised platform for the tray is sometimes the better answer than cutting.

Space-saving bathrooms in Hackney terraces

Period terraces around Victoria Park and Stoke Newington often have the bathroom squeezed into a rear closet wing or a converted box room. We make the most of tight footprints with space-saving layouts, walk-in showers and fittings scaled to the room, without the space ever feeling cramped. Underfloor heating frees up wall space and warms the tiled floor these older, sometimes draughty homes benefit from most.

Solid floors and old joists in Hackney terraces need proper preparation, so we strengthen and level where required, then tank and tile for a lasting finish. We upgrade the drainage and ventilation, add en-suites where a bedroom allows, and route new pipework sympathetically through the period structure. Notifiable electrical work is certified by a registered electrician under Part P or notified to building control, and we make good so the bathroom sits naturally within the character of the house.

  • Bespoke vanity units and storage
  • Floor strengthening before large-format tiles or stone
  • Wall and floor tiling in stone, porcelain or mosaic
Service areaHackney · E8, E2, E5, E9, N1 and N16
Local authorityHackney Council
Part ofEast London (Inner London)
Typical homesPost-war council estates, Victorian terraces and newer apartment blocks
Housing stock35% built before 1919, 8% interwar, 56% post-war; 83% flats, 16% terraced, 1% semi-detached or detached
Also covered nearbyTower Hamlets, Islington, Haringey, Waltham Forest and Newham

VOA Council Tax stock of properties, March 2025, for all 30 statistical areas in Hackney. Counts rounded by the VOA.

The GS Renovation Difference in Hackney

Hackney owners choose GS Renovation for bathrooms because a leak or poor waterproofing causes real damage, especially in flats stacked above neighbours. We tank properly, respect the lease and managing agent in conversions, and fit space-saving layouts in period terraces, handling plumbing, tiling, heating and electrics (certified by a registered electrician) as one job, backed by our founder's 30+ years on the tools.

Reviewed jobs near Hackney

1 MyBuilder review from Stoke Newington, with each customer's own job title:

  • Install new dishwasher, Stoke Newington, 24 May 2021 (5 out of 5)

Read all 31 on our reviews page.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
jessbeanWoodford Green · via MyBuilder
★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
andrew_lackEnfield · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Bathroom Renovation Hackney

How much should bathroom renovation in Hackney cost?

Expect bathroom renovation at a Hackney address to cost £6,000 to £20,000 or more (indicative), with the property rather than the postcode deciding the figure. At the E8 survey GS Renovation confirms the detail that matters most, because soil stack distance decides where a Hackney WC can go. Labour, materials and any Hackney Council building control fee are then itemised, so another Hackney quotation can be compared line by line.

Can I fit a wet room in my Hackney conversion flat?

Usually yes, provided the floor build-up and drainage allow it. In a Hackney conversion we check the existing structure and waste runs, tank the room fully to protect the flat below, and confirm what your lease and managing agent permit before moving any services. Good extraction and building-regulations-compliant detailing keep a wet room dry and problem-free.

How long does a Hackney flat bathroom refit take?

Allow 10 to 15 working days on site. In a flat, part of that time is deliberately quiet: tanking must cure before tiles go on, and it is water tested first, because a leak lands in the ceiling below. Arrange a shower elsewhere for the duration if the flat has one bathroom, and warn the flat below about noisy strip-out days.

Can I move the toilet in my Hackney flat?

A short distance at most, since the pan's outlet needs a steady fall into the shared soil stack. Under a timber floor in a converted house, the pipe slots between joists only where they run towards the stack; crossing them means raising the floor. The lease usually needs the freeholder's written consent to move sanitaryware. A macerator is a fallback, not a design choice.

Does a Hackney bathroom with a window still need an extractor fan?

Yes. Part F requires mechanical extraction ducted to outside, and in flats bathroom windows are often fixed or small. The duct goes through the external wall where possible, which in a flat usually needs the freeholder's consent, or through the ceiling void to an outlet. A fan with a run-on timer keeps working after the room is empty.

Can an original cast iron bath stay in a renovated Hackney bathroom?

Often, and it can be re-enamelled in place rather than carried down a shared stair. The bath is heavy when full, so the joists beneath are checked and strengthened where old pipes have notched them. Its waste and overflow are renewed, and it is set on its feet before the walls around it are tanked and tiled.

Can a bathroom window be replaced freely in a De Beauvoir house in Hackney?

Not without checking. The De Beauvoir conservation area Article 4 Direction requires planning permission for alterations to windows, front doors, railings and additions to the roof of a dwelling house. A bathroom window swapped for obscured uPVC, or a sash replaced with a different pattern, is an alteration to a window. Directions like this can be limited to certain elevations, so ask Hackney's planning team whether your window is covered before it is ordered. Obscure film on the existing glass avoids the question.

Does a Hackney bathroom refit need building control notice before work starts?

Where it includes notifiable work, such as new drainage or a structural change, yes. Hackney Building Control states it is a statutory requirement to notify it of commencement of works at least 48 hours before work begins. A like for like refit on the same connections may need no notice at all. Electrical work in a bathroom is normally self-certified under Part P by an electrician registered with a competent person scheme. We confirm which items are notifiable at the survey.

What is different about a bathroom in a Hackney flat built since 2000?

The floor and the warranty. 23% of Hackney homes were built in 2000 or later, and a block of that age may have concrete floors with acoustic layers and a building warranty that sets conditions on alterations. Breaking into a screed to move a waste can damage the acoustic layer, so the managing agent's drawings are read before the layout changes. Keeping the waste positions where they are is often the simplest refit.

Same Service, Nearby Areas

Bathroom Renovation Near Hackney

We carry out bathroom renovation across Hackney and the surrounding areas. Explore a nearby location:

Ready to Start Your Hackney Project?

Free, no-obligation quote for bathroom renovation in Hackney.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote