Bathroom Renovation Mayfair

Bathroom and wet-room refurbishment in Mayfair, tanked, plumbed and tiled by one team.

GS Renovation creates bathrooms, en-suites and wet rooms across Mayfair, fitting them into W1's mansion blocks, converted flats and Georgian and Regency townhouses. We handle the waterproofing, drainage, tiling and finishes, making the most of the often awkward spaces found in period homes near Hyde Park and the West End.

In Mayfair, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Mayfair: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.

Price guide

WorkIndicative London range
Bathroom renovation, full refit£6,000 to £20,000+

Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.

Quick estimate for Mayfair

Mayfair range: choose above

How the job runs

  1. Free design visit at your Mayfair home and an itemised quote.
  2. Strip-out, then first-fix plumbing and electrics.
  3. Tanking to the wet areas, then tiling.
  4. Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.
A walk-in shower built by GS Renovation, tiled in large format marble-effect porcelain with a lit recess
A low profile tray with a linear waste, black framed screen and a lit niche formed in the tiling.

Wet rooms and en-suites in Mayfair

Fitting a new bathroom or en-suite into a Mayfair townhouse means working with solid walls, existing drainage runs and rooms that were never designed for modern plumbing. We tank and waterproof thoroughly before tiling, form falls correctly for wet rooms and walk-in showers, and add proper ventilation to protect the historic fabric from damp. Underfloor heating is often the neatest way to warm these tall, cool rooms.

Space in period W1 homes is frequently tight, so we design layouts that use every inch, tucking en-suites into former dressing rooms or under staircases and choosing fittings that suit the proportions. Drainage in a multi-storey townhouse needs careful planning to run new soil pipes discreetly through the structure. New circuits, and changes to circuits around the bath or shower, are notifiable under Part P, so a registered electrician certifies them or they are notified to building control as part of the works.

Housing in Mayfair

The stock in the Strand, St James & Mayfair statistical area runs to roughly 7,560 dwellings, 96% of them flats and 4% houses, built 52% before 1919, 5% between 1919 and 1939 and 41% after 1945. Where most homes are flats, a bathroom in a flat in Mayfair sits over a neighbour's ceiling, so it is tanked before tiling and a moved WC needs the freeholder's licence.

Adding a bathroom to a Mayfair flat through Westminster building control

An extra bathroom or en-suite in a Mayfair flat is a layout change rather than a straight swap. It means a new room carved out of a bedroom or corridor, which closes Westminster's building notice route, so the work goes in as a full plans application. The charge sits on Westminster's minor works line for the fit out of a bathroom or kitchen in one property, identical on either route, so the drawings decide the route rather than the fee. What those drawings must show is the waste run to the shared stack, the extract route to outside and how the new door keeps the escape hallway protected.

Timing follows from that. Westminster aims to reach a full plans decision within 5 weeks and warns it can take longer, and in Mayfair, where 96% of homes are flats, the freeholder may ask to see the approved drawings before granting the licence. Order long lead sanitaryware while the application is live, but hold the tiles and any stone until the shower tray position and its falls are confirmed. Moving a tray after approval means revising a drawing the district surveyor has already checked, and a stone order cut to the old layout is wasted.

Period bathroom design across Mayfair

A bathroom in a Mayfair townhouse can be traditional or contemporary, but it should sit comfortably within a period home. We fit everything from classic roll-top schemes with heritage-style brassware to sleek walk-in showers finished in large-format stone, tiling to a high standard throughout. Quality tanking beneath the surface is what keeps a beautiful bathroom watertight for years, and we never cut corners on it.

Many of Mayfair's finest homes are listed or in a Westminster conservation area, so we work sympathetically with original features and use appropriate materials where consent applies. Internal bathroom work does not need planning permission, though it is governed by building regulations. From concealed cisterns to underfloor heating and considered lighting, we manage the plumbing, electrics, tiling and decoration as one coordinated job.

  • En-suite creation in bedrooms and loft rooms
  • Shower pumps and pressure improvements where flow is poor
  • Floor strengthening before large-format tiles or stone
Service areaMayfair · W1
Local authorityWestminster City Council
Part ofCentral London (Inner London)
Typical homesGrand period residences and prestige homes, most of them now flats (96% of homes)
Housing stock52% built before 1919, 5% interwar, 41% post-war; 96% flats, 3% terraced, 0% semi-detached or detached
Also covered nearbySoho, Marylebone, Belgravia, Bloomsbury and Paddington

VOA Council Tax stock of properties, March 2025, for the Strand, St James & Mayfair statistical area, which also covers St James's and the Strand. Counts rounded by the VOA.

Trusted Bathroom Renovation in Mayfair

Bathrooms in Mayfair's period townhouses hinge on getting the waterproofing, drainage and ventilation right beneath a beautiful finish. GS Renovation handles the tanking, the pipework, the notifiable electrics through a registered electrician, and the tiling as one accountable job, making clever use of tight period spaces. With our founder's 30+ years on the tools, we deliver en-suites and wet rooms that stay watertight and look the part.

30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
mr52782Barnet · via MyBuilder
★★★★★
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
andrew_lackEnfield · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Bathroom Renovation Mayfair

How accurate is a bathroom renovation quote for a Mayfair house?

A bathroom renovation quote for a Mayfair house is accurate when it is written after a survey rather than before one. GS Renovation inspects the W1 property and prices the work, including Part P certification for any new circuit or work in the bath and shower zones, against £6,000 to £20,000 or more (indicative). The figure holds unless the specification changes or opening up the period property reveals something hidden, and both risks are explained first.

Can you fit an en-suite into my period Mayfair bedroom?

Yes, en-suites are a popular addition in Mayfair townhouses. We plan the layout to fit tight period rooms, run new drainage and soil pipes discreetly through the structure, and tank the space fully before tiling. New circuits, and changes to circuits around the bath or shower, are notifiable under Part P, and if your home is listed we check whether Westminster City Council requires listed building consent.

How long does a bathroom renovation in a Mayfair flat take?

Usually 10 to 15 working days for a full strip and refit. The order is strip-out, first fix with waste falls set before the shower tray, boarding, tanking, tiling, then second fix. Noisy stages such as removing old tiles are programmed into the building's permitted hours, which is often the tightest constraint in a managed Mayfair block.

What extra care does a bathroom above a neighbour's flat in Mayfair need?

More than in a house, because any leak comes through someone else's ceiling. Waste joints are pressure tested before being boxed in, tanking extends beyond the shower zone, and a timber floor is stiffened with ply so movement does not crack grout. Flats are 96% of Mayfair's homes, so this is the usual case rather than the exception.

Can the toilet be moved in my Mayfair flat?

Only if it can still connect to the shared soil stack with a proper fall. In a period conversion, the joist direction decides whether the pipe can run through the floor; across joists usually means a raised plinth. Moving it far from the stack may need the freeholder's written consent, and a macerator is sometimes the only option.

Can new tiles go straight onto the old walls of a Mayfair bathroom?

Not onto old lime plaster. Pre-1919 buildings make up 52% of Mayfair's stock, and lime is too soft and too variable to hold heavy tiles once wet. The walls are lined with a cement-based backer board fixed back to sound masonry or studs, tanked in the wet areas, and then tiled.

Will Westminster sign off a Mayfair bathroom before the electrician's certificate arrives?

No. Westminster issues a completion certificate only once all fees are paid and all relevant electrical and gas certificates are supplied. A bathroom usually brings a new shower circuit, underfloor heating or an extract fan, and sometimes a moved boiler, so each installer's certificate is collected at handover. Without them the job has no completion certificate, which matters when a Mayfair flat is sold or the freeholder audits alterations.

Does a bathroom in a Mayfair flat built since 2000 need different care?

Yes, around the floor and the walls. 23% of homes in Mayfair were built in 2000 or later, and in those buildings the floors and the walls between flats are fire compartment lines, with pipes passing through sealed collars. Moving a waste or adding a shower means a new penetration, which has to be fire stopped to the same standard. The managing agent's as-built information shows where the compartment lines run.

Does a new Mayfair en-suite need planning permission for its pipes or vents?

Only where they appear on the outside. The room itself is internal work, but a new soil pipe or extract grille on an elevation is an external alteration, and in a Westminster conservation area some alterations need planning permission that would not elsewhere. The Mayfair conservation area was first designated in 1969. Routing waste and extract internally keeps the en-suite out of planning. A rear face out of view is the next option to put to the planners.

Ready to Start Your Mayfair Project?

Free, no-obligation quote for bathroom renovation in Mayfair.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote