Every trade under one contract across Mayfair and W1. Structural work, extensions, kitchens and bathrooms, building control handled for you.
Very little in Mayfair can be changed on the outside, which is precisely why the renovations here are so involved on the inside. The houses around Berkeley Square and Grosvenor Square are grand period buildings, a high proportion of them listed, and listing covers the staircase, the joinery and the plasterwork as readily as the front elevation. Behind the Bond Street frontages and around Shepherd Market the grain gets tighter, with residential upper floors sitting over shops and offices. A renovation in W1 is a question of consent first and construction second, and that order almost never reverses.
Listed building consent is a separate application from planning permission, and Westminster City Council determines it. What triggers it is alteration to fabric contributing to the special interest of the building, which in a Mayfair townhouse can mean a cornice, a shutter box, a run of original boards or the stair balustrade. We are the contractor. We build to consent that has been granted and to the drawings your architect and conservation adviser produce, and we will say plainly when something shown on a drawing appears to need a consent nobody has yet obtained.
Where the fabric is protected, the gains come from the parts of the plan nobody sees from the street. Lower ground floors that began as service rooms become kitchens and family space. Rear closet wings get rationalised. Daylight is drawn down through the section instead of being added to the front. These are the moves that make an eighteenth century plan work for a modern household, and they are also the moves most likely to be approved, because they leave the elevation and the principal rooms as they were found.
Solid brick laid in lime mortar behaves differently from modern cavity construction, and treating it otherwise is how period houses get damaged. Lime lets a wall move slightly and dry outwards. Repointing in a hard cement mix traps moisture and pushes the damage into the face of the brick instead. The same logic governs plaster: lime plaster on lath wants a breathable finish, not a sealed one. On listed work we repair with matched materials rather than replacing wholesale, which is generally what the consent requires in any case. Matching a historic mix is skilled work and it takes longer, which we say at the outset.
Floor structures in these houses are generous but not modern. Deep joists span further than you would expect, yet a century of notching for pipes and cables has often taken a good deal of their strength away. Any new opening, and any change of use that adds load, goes to a structural engineer we appoint before a saw is picked up. We install to the design issued, keep the structure propped while load transfers across, and leave bearings open for building control to inspect before anything is closed up. It is slower than guessing, and it is the only way to be certain of the result.
Kerbside space is the scarce commodity here. Bays are controlled, loading windows are short, and a skip needs a permit from Westminster City Council before it lands, assuming a skip is workable at all. On several streets it simply is not, so waste goes out bagged on staged collections and materials arrive on the day they are needed rather than in bulk. That has to be priced and programmed honestly at the outset, because pretending otherwise is what turns a fixed completion date into a moving one. Neighbours and the managing agents either side are told what to expect and when.
Mews properties behind the main terraces are a separate proposition again. Narrow, often only two storeys, with a former coach house at ground level and no rear access whatsoever, they take every material through the front door. Renovating one is rewarding work, but the sequencing has to be exact: once a staircase or a ground floor slab is out, there is no second route in. We plan those jobs backwards from the largest single item that has to fit through the opening. Once that sequence is agreed it is followed exactly, because there is no room to improvise.
Every Service, One Team
One accountable team for every trade in Mayfair. Choose the work you need:
RSJ and Steel Beam Installation in Mayfair: steel beam installation, RSJ and structural alterations.
Load-Bearing Wall Removal in Mayfair: safe load-bearing wall removal with steel beam support.
Structural Alterations in Mayfair: structural alterations, new openings and steel support.
Chimney Breast Removal in Mayfair: chimney breast removal with gallows bracket or beam support.
Open-Plan Conversions in Mayfair: open-plan kitchen, diner and living conversions.
House Extensions in Mayfair: single and double storey extensions.
Loft Conversion in Mayfair: dormer, hip to gable and mansard loft conversions.
Home Renovation in Mayfair: full refurbishments and whole-house renovations.
Kitchen Renovation in Mayfair: bespoke kitchen design and installation.
Bathroom Renovation in Mayfair: luxury bathroom and wet-room refurbishment.
Nearby
FAQ
Yes, where the work affects fabric of special interest, because listing covers the interior as well as the exterior. Cornices, panelling, shutters, staircases and original joinery are routinely protected. Listed building consent is applied for separately from planning permission and determined by Westminster City Council. We build only to consent already granted, and we flag anything on a drawing that looks as though it needs one.
Only with planning consent in place and a structural design from an engineer, both of which sit well ahead of any building work. Basement schemes are assessed against the council's own policies, so the position for your address has to be confirmed with Westminster City Council at the outset, and the engineer must assess neighbouring buildings as part of the design. We build to a consented scheme. We do not price a basement from a description.
We do, as part of the project. GS Renovation is a building contractor, so we appoint an independent structural engineer, arrange access for the survey, and then build precisely to the beam and bearing design that comes back. We never size steelwork ourselves. Building control applications and inspections are coordinated the same way, and you deal with one named project manager rather than chasing separate consultants.
Almost certainly, given how tightly the terraces around Berkeley Square and Shepherd Market are built, which is why it gets managed rather than ignored. Working hours are agreed and kept to, percussive work is concentrated instead of spread, and materials arrive inside the loading window rather than blocking the street. Where a beam bears into a shared wall, notice under the Party Wall Act is served by you as building owner before work begins.
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably priced quote. The work started on time and George worked really hard every day. There were…
George did a great job on our new bathroom. He is a really friendly and helpful guy and always ready to discuss any issues or concerns and come up with a sensible solution. Best of all, he works to budget and does not try and find…
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and replacing with new. Saiid was very helpful during the planning stage giving useful advice…
Free, no-obligation quote for any renovation work in Mayfair. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.