Bathroom Renovation Kensington and Chelsea
Bathroom and wet-room refurbishment in Kensington and Chelsea, tanked, plumbed and tiled by one team.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £6,000 to £20,000+
- 10 to 15 working days on site
- Free design visit, itemised quote
GS Renovation refurbishes bathrooms and en-suites across Kensington and Chelsea, fitting out the townhouses and mews homes of SW3, SW7, W8 and W11. We handle full waterproofing, drainage, tiling and heating, designing wet rooms and space-saving layouts that work within the awkward proportions of period properties.
In Kensington and Chelsea, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Kensington and Chelsea: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Bathroom renovation, full refit | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.
Quick estimate for Kensington and Chelsea
Kensington and Chelsea range: choose above
How the job runs
- Free design visit at your Kensington and Chelsea home and an itemised quote.
- Strip-out, then first-fix plumbing and electrics.
- Tanking to the wet areas, then tiling.
- Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.

Wet rooms and tanking in Kensington and Chelsea
Bathrooms in the townhouses of Chelsea and Notting Hill are often carved out of former bedrooms or landing space, on upper floors with timber joists that must stay dry. We tank and waterproof the whole area before tiling, forming falls to the drain for walk-in showers and wet rooms so water goes where it should. Correct drainage and mechanical ventilation are designed in to protect the period structure below.
Underfloor heating, tiling and the finishing work follow once the waterproofing is proven. In the tall, narrow homes across SW3 and W8, running new soil and waste pipes takes planning, so we route them discreetly through cupboards and voids. Notifiable electrical work for the bathroom is certified by a registered electrician under Part P, or notified to building control, and the whole installation is designed to cope with the demands of daily use in a busy household.
Housing in Kensington and Chelsea
Take the 89,280 or so homes the valuation list gives Kensington and Chelsea: 84% flats, 16% houses, 65% from before 1919, 8% interwar and 26% post-war. Where most homes are flats, a bathroom in a flat in Kensington and Chelsea sits over a neighbour's ceiling, so tanking comes first.
Bathrooms over neighbours and below the street in Kensington and Chelsea
84% of homes in Kensington and Chelsea are flats, so a bathroom renovation here is more often done over someone else's ceiling than over your own kitchen. That changes the order of the job. Stripping out old tiles and screed is the noisiest stage, and the council's Final Draft Code of Construction Practice sets 8am to 6pm, Monday to Friday, as the permitted hours for noisy works audible at the site boundary. In a block the noise reaches the neighbours through the party floor and the shared walls, so strip-out goes into the first weekdays of the programme and the neighbours below are given the dates.
A bathroom on a lower ground floor faces the opposite problem: water arriving from below rather than leaking downwards. The publication version of the New Local Plan Review states that basements are considered highly vulnerable to flooding. For a bathroom set below the level of the street drain, the waste either falls to a drain fitted with protection against backflow or is pumped up to it, and that choice is made before the floor is laid. Without that protection, a surcharged sewer can push sewage back up through the shower waste.
En-suites and small bathrooms in Kensington and Chelsea
The period homes of Knightsbridge, South Kensington and Holland Park rarely offer generous bathroom space, so clever layout matters. We add en-suites to principal bedrooms and reconfigure tight family bathrooms, using wall-hung sanitaryware, walk-in showers and concealed cisterns to free up floor area. Every layout is planned around the existing joists, chimney breasts and window positions of the original room.
Waterproofing standards stay the same whatever the size: full tanking, proper drainage falls and adequate extraction to prevent damp in these solid-walled properties. Underfloor heating warms cold period floors, and considered tiling and lighting lift a small space. Bathroom renovation is internal work requiring building regulations rather than planning permission, though in listed homes we check whether altering the room affects anything requiring consent.
- Underfloor heating and heated towel rails
- Notifiable bathroom electrics certified by a registered electrician under Part P
- Floor strengthening before large-format tiles or stone
VOA Council Tax stock of properties, March 2025, for all 21 statistical areas in Kensington and Chelsea. Counts rounded by the VOA.
Trusted Bathroom Renovation in Kensington and Chelsea
Kensington and Chelsea owners choose GS Renovation because a bathroom in a period townhouse depends on getting the waterproofing, drainage and ventilation right on timber upper floors. We tank properly, route services discreetly and finish to a high standard, adding en-suites and wet rooms that suit tight period layouts. Our founder's 30+ years on the tools stands behind the work.
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
Really great job done in our bathroom to replace the shower head in the bathtub, and install a shower screen and caddy. We are very happy with the…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about Bathroom Renovation Kensington and Chelsea
Do you charge for a survey before quoting bathroom renovation in Kensington and Chelsea?
A bathroom renovation survey in Kensington and Chelsea costs nothing, and it is part of quoting rather than a service to bill for. GS Renovation allows enough time at W8 to check the period details that move a figure within £6,000 to £20,000 or more (indicative), and to plan the order: the waste run is fixed before the tray goes down. Nothing is owed if you go elsewhere in Kensington and Chelsea.
Can you fit a wet room on the upper floor of my Holland Park period home?
Yes. Upper-floor wet rooms in Holland Park townhouses sit on timber joists, so full tanking and correctly formed drainage falls are essential to keep the structure below dry. We waterproof the whole area, design in proper ventilation and route new pipework discreetly. This is internal work under building regulations, not planning, though in listed homes we check first whether any consent applies.
How long will a bathroom renovation take in my Kensington and Chelsea flat?
Usually 10 to 15 working days. In a flat, a leak lands in the ceiling of the home below, so the tanking and the waste joints are tested before a single tile goes on. Deliveries through common parts can shape the daily order of work. If it is the sole bathroom in the flat, the toilet is kept connected overnight for as long as the sequence allows.
Can the toilet move in my Kensington and Chelsea flat bathroom?
Only if it can still reach the shared soil stack. A toilet waste is large and needs a fall, so it can only travel a short distance. The stack usually serves flats above and below, and the lease will usually need freeholder consent to move a bathroom. We check the stack position first.
Why is the shower weak in my top-floor Kensington and Chelsea flat?
Often because of how water reaches the upper floors. Top-floor flats can see low mains pressure, and a gravity-fed tank in the roof void gives very little head to a shower directly below it. A pump, an unvented cylinder or a combi fed by adequate mains pressure can each help, depending on the flat. We measure the flow at a tap before choosing the shower.
How does an internal bathroom in a Kensington and Chelsea flat get ventilated?
Through a fan and duct taken to outside air, which Part F insists on. With no window, the duct has to travel through the ceiling void or a bulkhead to an external wall or up to the roof, and longer runs need a more powerful fan. In a mansion block that route may cross a neighbour's space or the common parts, so the freeholder agrees it at first fix.
Does a bathroom in a listed Kensington and Chelsea house need listed building consent?
For the parts that touch historic fabric, yes. The borough has over 4,000 listed buildings, according to the publication version of the New Local Plan Review, and listing covers the interior. New soil and waste runs cut through floors, joists and walls, and a new vent through an external wall alters the elevation. A like-for-like refit of an existing modern bathroom may not need consent, but the planning authority makes that call, so we ask before the layout is fixed.
Does replacing the bathroom window during a Kensington and Chelsea refit need approval?
Building regulations approval, yes. The council's Householders' Guide to windows states that building regulations apply to all replacement windows, so a new bathroom window has to meet the thermal standard and keep the room's ventilation. Planning is a separate question: the council has consulted on a Windows Local Development Order to remove the need for separate planning permission for windows in non-listed homes. Obscured glass and trickle vents are chosen at the same time as the extractor fan.
Does breaking up a concrete bathroom floor in a mansion block have set hours?
Yes, in Kensington and Chelsea. Concrete-breaking is one of the high impact activities that the Final Draft Code of Construction Practice restricts to weekday mornings from 9am to noon and afternoons from 2pm to 5:30pm. Some mansion blocks have concrete or filler joist floors under the bathroom, and forming a level-access shower means breaking into them. That work is booked into those windows, and the managing agent is told which days in advance.
Every Service, One Team
More GS Renovation Services in Kensington and Chelsea
One team for every GS Renovation service in Kensington and Chelsea:
Same Service, Nearby Areas
Bathroom Renovation Near Kensington and Chelsea
We carry out bathroom renovation across Kensington and Chelsea and the surrounding areas. Explore a nearby location:
Ready to Start Your Kensington and Chelsea Project?
Free, no-obligation quote for bathroom renovation in Kensington and Chelsea.