Steel beam installation, RSJ and structural alterations in Maidenhead. Trusted, professional, 30+ years' hands-on experience.
An RSJ is the steel beam that carries the load once a wall is taken out. Our part is the survey, the temporary support, the beam, the padstones, the making good and the inspections that sign it off. We appoint a structural engineer for the calculations and build to what they issue. We never produce those calculations ourselves. This page sets out how a beam job in Maidenhead is consented, charged and checked.

The Royal Borough of Windsor and Maidenhead runs its own building control service. It describes itself as your local, independent, impartial, not for profit service, and it is a member of Local Authority Building Control. The service is based at the Town Hall, St Ives Road, Maidenhead SL6 1RF. The application for your beam goes there, so the plan check and the site inspections sit with one body rather than two.
The council's building control charge category C3 covers structural alterations of a single beam. From 1 April 2026 the full plans charge is £300.00 with inspection included, a building notice is £345.00, and regularisation of work already done is £431.25. Each figure is inclusive of VAT at 20 per cent. Regularisation is the route for a beam already in place without a notice, and it is the dearest of the three.
That charge is separate from the build cost and from the structural engineer's fee. As a guide on the build cost, indicative London ranges, MyBuilder and Checkatrade, 2026, put an RSJ beam alone for one straightforward opening at £1,500 to £4,000. We set the council charge, the engineer's fee and our own price out separately in the quotation, so you can see which is which.
The council's recommended inspection stages include an inspection of steel beams and columns before encasing, with one day's notice required to book it. That single line governs the order of the work. The beam has to be seen bare, with its bearings and any padstones visible, before plasterboard, fire protection or plaster go near it.
We book that inspection around our own programme rather than after the fact. If the steel is boxed in first, the evidence the inspector needs is behind a wall, and opening it back up is your cost. Temporary support stays in place until the beam is in, bearing correctly, and released in the sequence the engineer sets out.
The council's Maidenhead Town Centre conservation area appraisal records a multi storey brewery stables of about 1870 immediately east of 3 and 5 King Street, and notes that its south gable end carries an RSJ over later doorways. The listed buildings inside that conservation area are all grade II. Steel worked into older brickwork is nothing new here.
It does change the consent question. Where a property is listed, or where a new opening alters what is seen from the street in a conservation area, the planning side has to be dealt with alongside building regulations. We tell you which of the two apply before a price is agreed, and we appoint the structural engineer for the calculations.
We are a contractor, not an engineering practice. For a Maidenhead beam we appoint the structural engineer, build to the calculations issued, and hold the temporary support until the steel is bearing correctly. The building control application goes to the borough's own service, and we make it and book the steel inspection before anything is encased. That gives you one point of contact for the engineer, the steel, the brickwork and the sign off. GS Renovation Ltd is fully insured, registered in England, company number 14611254, and rated 4.9 from 31 reviews on MyBuilder. Quotations are free and carry no obligation.
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
FAQ
Enough for the scoped work plus a sensible allowance for the unseen. GS Renovation prices what the SL6 survey shows, names anything that could change once RSJ and steel beam installation opens up a bay-fronted Victorian terraced structure, and leaves the decision with you. The Royal Borough of Windsor and Maidenhead fee belongs in the same budget. Nothing is added to a Maidenhead project without written agreement. Ring 07472 424 226 and we will explain the likely contingency for an SL6 property in Maidenhead. As a rough guide, RSJ and steel beam installation in London runs roughly £1,500 to £4,000 for the beam itself on a single straightforward opening, covering supply, installation and building control sign-off; a full knock-through including taking the wall out, the structural engineer's fee and making good more typically comes to £2,500 to £6,500 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). Your figure depends on the size, specification and condition of the property, which is why we survey before quoting.
That is the engineer's call once the existing footings are exposed, because a beam concentrates the load onto two small points. The British Geological Survey maps Taplow Gravel under the town centre, Furze Platt and St Mark's Road, and Boyn Hill Gravel under Courthouse Road and Wootton Way. Taplow Gravel is given an average thickness of 5 metres, locally reaching 9. We open up at each bearing and pass what is found to the engineer we appoint.
Two days before commencement of work, on the council's published stages. Each named stage after that takes one day's notice. Where the opening needs a new pad foundation, excavations for foundations and foundation concrete are separately notified stages of their own. Those notice periods sit inside our programme rather than being added to the end of it. We book each one as the work reaches it and tell you when it is booked.
Yes, through regularisation, the building control route for work already carried out without a notice. The application is made on the Royal Borough's own online forms, because it no longer accepts building regulations applications through the Planning Portal. Expect to expose the beam again, since the council's inspection stages include steel beams and columns before encasing and the bearings have to be visible. We open up, appoint an engineer to assess what is there, and deal with the council.
Under the Royal Borough's validation requirements, a Heritage Statement is required where the property is statutory or locally listed, sits within a conservation area, or affects a heritage asset or its setting. A Design and Access Statement is required in a conservation area only where the floor area of the proposal exceeds 100 square metres. Those requirements were adopted on 5 February 2026, and an application that falls short of them is not validated.
Every Service, One Team
The same trusted team, 30+ years' hands-on experience and free, no-obligation quotes apply to every GS Renovation service in Maidenhead. Explore what else we do locally:
Same Service, Nearby Areas
We carry out RSJ and steel beam installation across Maidenhead and the surrounding areas. Explore a nearby location:
Free, no-obligation quote for RSJ and steel beam installation in Maidenhead. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.