Office Fit-Out Maidenhead

Office fit-outs for small and medium office suites in Maidenhead, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.

Office fit out in Maidenhead covers a business taking, renewing or reconfiguring its workspace: a suite in an office building, a floor above shops in the town centre, a studio or a professional office. We strip out, build partitions and glazed screens, ceilings, lighting, small power and tea points, then decorate and hand over. Before any of that, the landlord's licence for alterations and a building regulations approval have to be in place, and the Royal Borough runs its own building control service for non domestic work.

For Maidenhead, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Maidenhead: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.

Price guide

WorkIndicative range
Office fit-out, construction only£70 to £120 per sq ft
London office fit-out, all-in£148 to £359 per sq ft
Metal stud partition, boarded both sides£55 to £65 per m²
Suspended ceiling, grid and tile£22 to £35 per m²
Dilapidations at lease end£15 to £20 per sq ft

Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Berkshire prices follow a site visit. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

A test meter like this checks each new circuit before the electrician certifies it, illustrating office fit-out in Maidenhead.
A test meter like this checks each new circuit before the electrician certifies it.

Where Maidenhead office space sits and why it stays offices

Maidenhead's office stock is partly protected by planning policy, which shapes how it gets used. On 30 October 2024 the Royal Borough's Cabinet confirmed a non immediate Article 4 Direction removing the right to change from Class E to C3, the office to home right, on protected employment sites. It came into force on 30 January 2025 for the employment areas in Borough Local Plan Policy ED2. For an owner that closes the permitted development route to flats, so turning a vacant floor there into homes needs planning permission, while reletting it as offices needs none.

That is context, not your problem as a tenant. What matters to you is the building you are taking and what the landlord hands over. The neighbourhood plan's design code names a Town centre character area, and an office there can be an upper floor above ground floor shops, reached by a stair with no lift. A suite in a purpose built Maidenhead office block is a different job, usually with a raised floor, a suspended ceiling grid and a landlord's services contractor who controls the fire alarm and the air conditioning.

Cat A and Cat B in a Maidenhead office, explained plainly

Cat A is the landlord's shell made usable: ceilings, raised floor, base lighting, heating and cooling to open plan, and working toilets. Cat B is the tenant's layout on top of that: meeting rooms, glazed screens, a tea point or kitchenette, extra small power, data routes and the finishes. We can build either, or both as one job when a landlord strips a floor for a new tenant. We price Cat B from your layout and coordinate the data cabling with your IT supplier, who installs and tests the network itself.

An office is often fitted out around people still working, either in the building or in the suites next door. The Royal Borough recommends noisy building work only between 7am and 7pm on weekdays and 7am to 1pm on Saturdays, with none on Sundays or bank holidays. Inside a Maidenhead multi let building the landlord may want drilling and cutting kept to the first hours from 7am. We do the noisy strip out and fixings then, never before 7am, and run quieter work such as partition boarding, ceiling tiles and decoration through the day. Noisy work outside the borough's hours needs the council's agreement, usually through a prior consent under the Control of Pollution Act.

Fire escape, access and lighting rules for a Maidenhead office

New partitions in an office change the fire strategy, so building regulations approval comes first. Part B covers means of escape: travel distances, protected routes, fire doors on inner rooms and alarm coverage, which new meeting rooms can block. Part M covers access to the office and its WCs, and Part L covers the energy performance of new lighting and services. Your designer or fire engineer sets the strategy, and the application for a Maidenhead office goes to the Royal Borough or to a registered building control approver.

The Royal Borough runs its own building control service, a member of Local Authority Building Control based at the Town Hall in St Ives Road, Maidenhead. It no longer accepts applications through the Planning Portal, only through its own online forms. Workplaces covered by the fire safety order cannot use the short notice route, so the drawings are checked before we build. Its non domestic charges also add a separate charge for a change of use on top of the works, which applies if part of the building changes its use under the regulations.

Landlord consent, CDM and the end of a Maidenhead office lease

Before a Maidenhead fit out starts, the landlord's licence for alterations has to be in place. The landlord will want drawings, a method statement and the building control approval, and may require its own surveyor to inspect. As a business client you also hold duties under the Construction (Design and Management) Regulations, such as appointing a principal designer and principal contractor where more than one contractor is involved. You also pass on what you know about the building, including any asbestos survey.

Keep the paperwork, because the lease ends one day. The Royal Borough states that if it is not called for the relevant inspections it cannot issue a completion certificate, and all parties must return a Notice of Completion form first. That certificate, the electrical certificates and the fire alarm records are what a landlord asks for at lease end. A dilapidations claim often turns on reinstatement, so we record the layout we found and the layout we built, which makes stripping it back at the end of a Maidenhead lease simpler to price.

  • Acoustic partitions and door seals for private meeting rooms
  • Office carpet tiles and sheet vinyl in tea points and WCs
  • Suspended grid ceilings and plasterboard ceilings with access panels
Service areaMaidenhead · SL6
Local authorityRoyal Borough of Windsor and Maidenhead
Part ofBerkshire · about 26 miles from our base
Typical homesPost-war suburbs with Victorian and Edwardian villas nearer the river
Housing stock12% built before 1919, 8% interwar, 78% post-war; 33% flats, 18% terraced, 45% semi-detached or detached, 5% bungalows
Also covered nearbySlough, Windsor, Beaconsfield and High Wycombe

VOA Council Tax stock of properties, March 2025, for all 7 statistical areas in Maidenhead. Counts rounded by the VOA.

Why Choose GS Renovation in Maidenhead

An office fit out is judged on the day your staff move in, so the programme is built backwards from that date. We give you a written quotation after surveying the space, a dated programme with the landlord's approvals and building control inspections on it, and one point of contact from strip out to handover. We build to your designer's layout and the consents you or your landlord hold, and the registered trades supply the electrical and fire alarm certificates for the handover pack.

  • Method statement and programme supplied for your landlord's licence for alterations
  • Lease reinstatement clauses read before any partition is fixed to the structure
  • Free follow-up visit after completion if anything needs attention
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
mr52782Barnet · via MyBuilder
★★★★★
George is a very hard working builder, and has done a fantastic job on replacing my Bathroom. His attention to detail was great and I wouldn't…
manders_53St Albans · via MyBuilder
★★★★★
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
khalid75711Barnet · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Office Fit-Out Maidenhead

How much does an office fit-out cost in Maidenhead?

Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.

Can a Maidenhead office in a protected employment area become flats without planning permission?

No. The Royal Borough's Article 4 Direction removing the Class E to C3 right came into force on 30 January 2025 for the protected employment areas in Borough Local Plan Policy ED2. For a tenant this rarely matters directly, but it means offices in those areas stay in office use unless planning permission for homes is granted.

What is the difference between a Cat A and a Cat B fit out?

Cat A makes an empty shell usable: ceilings, floors, base lighting, heating and cooling, and toilets. Cat B fits it to one occupier: partitions, meeting rooms, a tea point, extra power, data routes, furniture and branding. A landlord usually pays for Cat A and a tenant for Cat B, though a lease can say otherwise. We can build either or both.

How are building regulations applied for on a Maidenhead office fit out?

Through the Royal Borough's own online forms, or through a registered building control approver. The borough no longer accepts building regulations applications via the Planning Portal. An office covered by the fire safety order needs its drawings checked before work starts, so your designer makes the application early and we build to the approved plans.

Who carries out building control inspections for offices in Maidenhead?

Either the Royal Borough's own building control service or a registered approver you appoint. The borough's service describes itself as local, independent, impartial and not for profit, is a member of Local Authority Building Control, and is based at the Town Hall in St Ives Road. We call the inspections at each stage the approver asks to see.

Can noisy strip out in a Maidenhead office run at weekends?

Only within the borough's recommended limits for noisy work: 7am to 7pm Monday to Friday and 7am to 1pm on Saturday, with no works on Sundays or bank holidays. Quiet work such as decoration and ceiling tiles can often run later with the landlord's agreement. We plan the loud work into mornings so the occupied floors around you are disturbed as little as possible.

Does scaffold for an office front near Maidenhead town centre cost more to licence?

Yes. The Royal Borough prices commercial scaffold and hoarding licences at the higher major road rate on any A or B road and any road within half a mile of a town centre. Central Maidenhead streets can fall under that rate, so we allow for it in the quotation whenever window, cladding or signage work outside the office needs scaffold.

What duties does a business have as a client under CDM?

A commercial client must make suitable arrangements for managing the project, allow enough time and resources, and pass on information it holds about the building, such as asbestos surveys and drawings. Where more than one contractor is involved, the client appoints a principal designer and a principal contractor in writing. Where appointed, we act as principal contractor and prepare the construction phase plan.

What happens to the fit out when the office lease ends?

The lease decides. A lease may require the tenant to remove its alterations and reinstate the original layout, and the landlord's surveyor lists what is owed in a schedule of dilapidations. We can strip out partitions, ceilings and cabling back to the Cat A shell, make good the finishes and hand the landlord the records of what was done.

Same Service, Nearby Areas

Office Fit-Out Near Maidenhead

We carry out office fit-out across Maidenhead and the surrounding areas. Explore a nearby location:

Ready to Start Your Maidenhead Project?

Free, no-obligation quote for office fit-out in Maidenhead.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote