Chimney breast removal with gallows bracket or beam support in Maidenhead. Trusted, professional, 30+ years' hands-on experience.
A chimney breast carries the brickwork above it, so removing one at ground floor leaves the stack overhead needing support. That is either gallows brackets bolted to sound brickwork or a steel beam, and the structural engineer we appoint decides which. We build to the calculations issued and never write them. This page covers the consent route, the charge and the roofline question in Maidenhead.

The Royal Borough of Windsor and Maidenhead no longer accepts building regulations applications through the Planning Portal. Applications must be made using the council's own online forms. If you have used the Portal for work in another borough, that route is closed here, and a notice sent the wrong way is a delay rather than a submission. We make the application for you and keep the reference.
The council's building control charge category C3 covers structural alterations of a single beam or chimney breast removal. From 1 April 2026 the full plans charge is £300.00 with inspection included, a building notice is £345.00, and regularisation of work already done is £431.25, all inclusive of VAT at 20 per cent. Regularisation is what you pay when a breast came out without a notice.
On the build cost, indicative London ranges, MyBuilder and Checkatrade, 2026, put a chimney breast removed on one floor with gallows brackets accepted at £1,500 to £2,500, and £2,200 to £3,250 where a steel beam is needed. Removal across two floors runs from £3,000 to £5,000. Which of those applies is the engineer's decision rather than a preference.
Code CA4.03 of the Maidenhead design code states that where there is a presence of Victorian dwellings in the Boyn Hill character area, building extensions and conversions should retain as much original feature and detailing as possible. It names a retention of timber window frames and a consistent roofline with retained chimneys. Removing a breast internally while leaving the stack and pots in place answers that.
The code describes the Ray Mill character area as late Victorian and early Edwardian two to three storey villas with tiled roofs and ornate chimneys, with facade materials largely red brick, stucco or a mix. Where the stack is part of the elevation, the support design has to hold it up rather than take it down. We price both options so the choice is visible.
The council's Altwood Road conservation area appraisal records the principal building material there as the orange red brick typical of this part of Berkshire, and records the chimneys as tall brick built structures. Gallows brackets only work where the brickwork they fix into is sound and thick enough. A tall stack adds load and lengthens what is being carried above the removal.
That is why the survey comes before the price rather than after it. We expose enough of the breast and of the brickwork above to let the engineer judge whether brackets are acceptable or a beam is required. Where a beam is required, the padstones and bearings are designed with it, and the inspection sequence follows from that.
The decision that moves the price on a chimney breast is brackets or beam, and that is the structural engineer's call rather than ours or yours. We appoint the engineer, expose enough brickwork for a proper judgement, then build to the calculations issued. The building control application goes on the borough's own online forms, and we make it, book the inspections and return the completion paperwork. Everything from the temporary support to the plastering and the hearth sits with one point of contact. GS Renovation Ltd is fully insured, registered in England, company number 14611254, and quotations are free and without obligation.
Saiid did a complete refurbishment of our small bathroom. This involved ripping out the existing bath/shower, basin, toilet, pipework, and tiles and…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
The kitchen has been fitted to the high standard. Saaid was polite, professional, tidy, he pays attention to a little details that make huge…
FAQ
Not from us, though there are unknowns and we name them upfront. On an older Maidenhead property chimney breast removal can uncover wiring, timber or drainage that nobody could see at the SL6 survey, and we tell you what we suspect before starting. Anything additional is priced and agreed in writing first. GS Renovation has never treated a surprise as a licence to inflate a Maidenhead invoice. Ring 07472 424 226 and GS Renovation will name the likely unknowns at your SL6 address. As a rough guide, chimney breast removal in London costs roughly £1,500 to £2,500 for a single floor where gallows brackets are accepted, or £2,200 to £3,250 where a steel beam is needed, which is the more common route now that LABC has withdrawn its standard gallows detail; two floors run £3,000 to £5,000 (indicative London ranges, MyBuilder and Checkatrade, 2026). Your figure depends on the size, specification and condition of the property, which is why we survey before quoting.
Taking the stack down changes the roofline, and the roofline is what the conservation area designation looks at. Code CA6.07 of the Maidenhead design code lists the features to respect in the Furze Platt Triangle as local red brick, tile hanging, half timbering, white finished render, pebbledash, decorative ridge tiles and distinctive finials. Furze Platt Triangle has a boundary map published but no appraisal statement, so the design code is the published detail to work to.
A completion certificate from the borough's building control service, and two things have to happen first. The council states that if it is not called in to carry out the relevant inspections, it cannot issue one. It also requires a Notice of Completion form to be completed by all parties and returned before a certificate is issued. We book the inspections and return that form, and the certificate goes in your file with the engineer's calculations.
Yes, and the list bears on what shows outside rather than on the room. The Maidenhead Neighbourhood Plan carries a local list of 40 non designated heritage assets compiled in 2025. Policy BH-4 asks alterations and extensions to those assets to respect the scale, height, massing, detailing, materials palette and roofline of the asset. A stack is part of that roofline, so keeping it and supporting it is designed in from the start.
The work is inspected either way, because it is building control work whichever support the engineer specifies. Where a steel beam is used, the council's recommended stages include steel beams and columns before encasing, booked with one day's notice. The Royal Borough runs building control itself from the Town Hall, St Ives Road, Maidenhead SL6 1RF, so the plan check and the site visits sit with one body. We book them around the programme.
Every Service, One Team
The same trusted team, 30+ years' hands-on experience and free, no-obligation quotes apply to every GS Renovation service in Maidenhead. Explore what else we do locally:
Same Service, Nearby Areas
We carry out chimney breast removal across Maidenhead and the surrounding areas. Explore a nearby location:
Free, no-obligation quote for chimney breast removal in Maidenhead. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.