Office Fit-Out Old Street

Office fit-outs for small and medium office suites in Old Street, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.

Office fit-out in Old Street serves a real office market. Islington's Local Plan names Tech City around Old Street and the Clerkenwell Design Cluster among the borough's economic clusters, so the typical brief is a floor, a studio or a small suite turned over between tenants. The work is strip-out, partitions and glazed screens, ceilings, lighting and power, meeting rooms, tea points, WCs and showers, all under non-domestic building control and the landlord's licence for alterations.

For Old Street, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Old Street: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.

Price guide

WorkIndicative range
Office fit-out, construction only£70 to £120 per sq ft
London office fit-out, all-in£148 to £359 per sq ft
Metal stud partition, boarded both sides£55 to £65 per m²
Suspended ceiling, grid and tile£22 to £35 per m²
Dilapidations at lease end£15 to £20 per sq ft

Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.

Quick estimate from UK guide figures

Guide range: choose above

A test meter like this checks each new circuit before the electrician certifies it, illustrating office fit-out in Old Street.
A test meter like this checks each new circuit before the electrician certifies it.

Office floors in Tech City around Old Street

Office work sits at the centre of Old Street's economy as the council describes it: the Local Plan names Tech City around Old Street as one of Islington's economic clusters. A typical brief might be a floor in a warehouse or a post-war commercial block changing hands between tenants. Partitions are stripped, meeting rooms rebuilt, lighting and power relaid under a raised floor or along exposed soffits, and a tea point or shower room is added. We price from the landlord's fit-out guide as well as your layout, because the lease often fixes finishes and contractors' rules.

Two terms come up in every Old Street office letting. Cat A is the landlord's base finish: a clean floor with a suspended ceiling or finished soffit, raised floor, lighting, heating and cooling, and WCs, ready for a tenant. Cat B is the tenant's fit-out on top of that: partitions and glazed screens, meeting rooms, a tea point or kitchenette, data cabling coordinated with your IT supplier, furniture power and signage inside. Settling which one you are buying, and what the landlord has already provided, is the first step, because it fixes the scope.

Landlord consent, building control and CDM for an Old Street office

Every Old Street office fit-out with building work needs full plans approval or a registered building control approver, because Islington Council says a building notice cannot be used for non-domestic properties. The drawings show means of escape and fire separation under Part B, accessible routes and WCs under Part M, and lighting and services efficiency under Part L. The council has a statutory obligation to process full plans applications within five weeks, or two months if agreed, and it issues a completion certificate once the work is done and the fees are paid.

Two other obligations run alongside. The landlord's licence for alterations is normally conditional on approved drawings and the building's fit-out rules, so it goes in together with the building control application rather than after it. As a commercial client you also carry duties of your own under the Construction (Design and Management) Regulations, including passing on what you know about the building, such as its asbestos survey, and allowing enough time for the work. We prepare the construction phase plan for the works we run, and keep it on site.

Working in an occupied office building near the Old Street roundabout

An office fit-out in Old Street often happens in a building where other tenants carry on working, so noise and dust are managed as closely as the build. Islington only allows noisy construction work 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays unless it gives prior approval, while a building manager may want core drilling and cutting kept away from office hours. Where those two clash, the noisy work either gets the council's prior approval for other times or is squeezed into a smaller daily window, and we settle which before the programme is fixed.

Deliveries around the Old Street roundabout are booked, not improvised. Glass partition panels, ceiling grid, raised floor pedestals and plant arrive in timed slots through the goods entrance, and an obstruction on City Road, a red route, needs permission from Transport for London. Where a hoist or gantry has to stand on the pavement, Islington asks for the licence application at least 10 working days in advance. Inside, we protect lifts and common parts, and fire alarm zones are isolated only with the building manager's agreement and reinstated the same day.

Office stock, Class MA and lease end in Old Street

Islington's planning policy leans towards keeping office floorspace as offices, and for a tenant that mainly means the stock stays in office use. Class MA normally lets Class E premises change to homes, but Islington made four non-immediate Article 4 Directions withdrawing that right, covering areas including the CAZ and the Kings Cross CAZ Fringe. The council's map shows which side of the CAZ boundary a building sits. Policy B3 also refuses net loss of business floorspace in the CAZ, town centres and similar areas unless the space has been vacant and continuously marketed for at least 24 months. A fit-out that keeps the office use is untouched by either rule.

At the end of an Old Street office lease the question turns to dilapidations and reinstatement. A lease commonly requires the tenant to remove its partitions, cabling and kitchen points and return the floor to the condition set out in the lease or a schedule of condition. We strip a Cat B fit-out back to the landlord's base, make good the ceilings and raised floor tiles, and give you a photographic record of the finished floor. Reading the reinstatement clause before a new fit-out starts can save a second strip-out later.

  • Office WCs, accessible WCs and staff showers
  • Office fit-out and refurbishment for small and medium office suites
  • Strip-out of the previous tenant's office, with disposal
Service areaOld Street · EC1 and N1
Local authorityIslington Council
Part ofNorth London (Inner London)
Typical homesPost-war council estates and modern apartment blocks with some warehouse conversions
Housing stock16% built before 1919, 5% interwar, 76% post-war; 99% flats, 1% terraced, 0% semi-detached or detached
Also covered nearbyShoreditch, Hoxton, Clerkenwell, Angel and Whitechapel

VOA Council Tax stock of properties, March 2025, for Old Street & St Luke's. Counts rounded by the VOA.

Why Choose GS Renovation in Old Street

An Old Street office fit-out has a landlord, a building manager, building control and a moving date to satisfy at once. We visit, read the landlord's fit-out rules against your layout, and give a written quotation with a programme that shows when each zone is handed back. One site team runs the strip out, partitions, ceilings, services and finishes, the data cabling is coordinated with your IT supplier, and a registered electrician certifies the electrical installation. You receive the completion records for the landlord in one pack.

  • Asbestos survey checked before any office ceiling, floor tile or boxing is disturbed
  • Photographs kept at each stage for your records
  • A programme built back from the date your staff move in
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
volkan50816Stoke Newington, London · via MyBuilder
★★★★★
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
ariabuffadesignerHornsey, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Office Fit-Out Old Street

How much does an office fit-out cost in Old Street?

Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.

What is the difference between Cat A and Cat B for an Old Street office?

Cat A is the landlord's base finish: ceilings, raised floor, lighting, heating and cooling, and WCs, with the floor empty and ready to let. Cat B is the tenant's fit-out on top: partitions, meeting rooms, a tea point, cabling, furniture power and branding. We confirm with the landlord what the Cat A includes before pricing the Cat B.

Can a building notice be used for an office fit-out in Old Street?

No. Islington Council says a building notice cannot be used for non-domestic properties, so an office fit-out that includes building work goes through full plans or a registered building control approver. Partitions that change escape routes, new WCs and new kitchen points are the items that usually bring it in, and the drawings are checked before work starts.

Is Old Street a recognised office location in Islington's plan?

Yes. Islington's Local Plan names Tech City around Old Street and the Clerkenwell Design Cluster among the borough's economic clusters. For a fit-out, that makes an office brief here ordinary rather than unusual, and landlords of multi-let buildings commonly issue a fit-out guide with rules on contractors, hours and finishes that we price against.

Could an Old Street office be converted to flats instead of refitted?

Not freely. Class MA normally allows Class E premises to become homes, but Islington's Article 4 Directions withdraw that right in areas including the CAZ and the Kings Cross CAZ Fringe. Policy B3 also resists net loss of business floorspace in the CAZ, town centres and similar areas unless the space has been vacant and continuously marketed for at least 24 months. That is the owner's planning question, not the tenant's.

When can noisy fit-out work run in an Old Street office building?

Islington allows noisy construction work from 8am to 6pm on weekdays and 8am to 1pm on Saturdays unless the council gives prior approval. Occupied buildings often want the loudest work kept away from office hours, so we agree the drilling and cutting slots with the building manager and seek prior approval where the two cannot be reconciled.

What duties does a business have under CDM for a fit-out?

A commercial client has duties of its own under the Construction (Design and Management) Regulations. You pass on the information you hold about the building, such as the asbestos survey, allow enough time and resource for the work, and make sure the right appointments are made where more than one contractor is involved. We prepare the construction phase plan for our works.

How long do Islington's building control checks take for an Old Street office?

Islington Council has a statutory obligation to process full plans applications within five weeks, or two months if agreed. The drawings and the landlord's licence request are best lodged at the same time so both run together, and we use the waiting weeks for surveys, soft strip and ordering long lead items such as glazed screens.

What happens to the fit-out when the office lease ends?

The lease decides it. A reinstatement clause commonly requires partitions, cabling and kitchen points to be removed and the floor returned to its original condition, and the landlord's surveyor assesses dilapidations against that. We strip the fit-out back, make good ceilings and floor tiles, and record the finished condition for the handover.

Ready to Start Your Old Street Project?

Free, no-obligation quote for office fit-out in Old Street.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote