House Refurbishment Old Street
Whole-house refurbishments in Old Street, every floor of the house renewed from the roof down, in the right order.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £43,530 to £110,350
- Free site survey, itemised quote
House refurbishment in Old Street is a small, specific job, because the valuation list puts houses at 1% of homes here and flats at 99%. The houses that exist are terraced, and 16% of all homes in the area were built before 1919. If yours is one of them, a refurbishment means renewing the wiring, plumbing, heating, plaster, joinery, windows and roof of a whole house without re-planning its rooms. If it lies in the St Luke's conservation area, which straddles Whitecross Street and Old Street, check whether an article 4 direction reaches its front windows and doors.
For Old Street, published UK figures put a three-bed house refurbishment at £43,530 to £110,350, and London houses usually cost more, with a London architect allowing £1,800 to £2,200 per square metre before VAT (Checkatrade and Bradley Van Der Straeten Architects, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Old Street: we renew the wiring, pipework, heating, plaster, floors and joinery of the whole house under one contract, and a registered electrician certifies the rewire.
Price guide
| Work | Indicative range |
|---|---|
| Three-bed house refurbishment, UK average | £43,530 to £110,350 |
| Non-structural house refurbishment in London, per square metre, excluding VAT | £1,800 to £2,200 per square metre |
| Full rewire, two-bed to five-bed house | £4,500 to £10,500 |
| New heating system, three-bed house | £3,000 to £8,500 |
| Re-skim walls and ceilings, three-bed house | £5,000 to £12,500 |
Indicative ranges from published cost guides (Checkatrade, Bradley Van Der Straeten Architects and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026. Full breakdown: House Rewire Cost.
Quick estimate from UK guide figures
Guide range: choose above

What an older Old Street terrace needs when it is refurbished
An older Old Street house is refurbished from the fabric outwards, and the valuation list shows why its age matters: 16% of all homes here, flats included, predate 1919, 5% date from between the wars and 76% from after 1945. A house from before 1919 commonly has lime mortar, lath and plaster ceilings, suspended timber floors and voids that have carried several generations of wiring and pipework. We open those up carefully, record what is there, and keep breathable finishes on solid walls rather than sealing them with gypsum and plastic paint, which traps moisture.
The services are renewed as one sequence rather than room by room. A registered electrician certifies the full rewire, a registered gas engineer handles the boiler and any gas appliances, and the heating pipework and radiators are replaced while the floorboards are up. Joists notched by earlier pipe runs are repaired or strengthened, the stair is eased and refixed, and sash windows are overhauled or renewed. Only then do the plasterers return, using lime where the walls need it, before second fix, joinery and decoration.
Housing in Old Street
Take the 6,800 or so homes the valuation list gives Old Street: 99% flats, 1% houses, 16% from before 1919, 5% interwar and 76% post-war. A whole house in Old Street is refurbished as one building, roof down, which matters here because most homes are flats.
Conservation area rules on windows, doors and roofs in Old Street
Before a window, door or roof covering on an Old Street house is changed, find out whether the house sits in a conservation area and whether an article 4 direction applies. Islington says there are currently 42 conservation areas in the borough and that it has removed permitted development rights in 40 of them by article 4 direction. The St Luke's conservation area straddles Whitecross Street and Old Street and is described by the council as an important surviving part of historic Finsbury.
In Islington's article 4 conservation areas, planning permission may be needed for minor alterations such as changing external doors and windows or painting brickwork on the outside. A house covered by an Article 4 direction needs householder planning permission to install or replace front windows or doors. That sets the order of work: repairs to existing sashes, doors and brickwork go ahead while any replacement waits for the owner's consent, and roof and chimney repairs are specified like for like. Pruning or felling a tree in a conservation area needs six weeks written notice to the council, which matters when scaffold goes up beside one.
Hours, skips and parking for an Old Street house refurbishment
Noisy work on an Old Street house refurbishment runs inside Islington's permitted hours: 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays, unless the council approves otherwise. Stripping out, chasing walls for the rewire and lifting floors are the loud stages, so we put them early in the week and keep plastering, joinery and decorating for the later days. On a terrace the party walls carry noise to both neighbours, so we tell them the loud days in advance.
A whole house produces far more waste than a flat, and on an Old Street road it has to leave from the kerb. A skip on the road needs a licence from the council, any other obstruction such as scaffolding or stored materials needs a highways licence, and Islington asks for scaffolding licence applications at least 10 working days in advance. Most parking bay suspensions must be applied for at least 14 days before they begin, and on City Road, a red route, permission comes from Transport for London. Where a skip will not fit we use bagged waste on a set collection day.
Occupied or empty: programming an Old Street house refurbishment
Whether you stay in an Old Street house during the refurbishment changes the programme more than any other choice. An empty house is stripped in one go, then first fix, plaster, second fix and finishes follow floor by floor, which is the shortest route. If you live in it, we phase the work so one bathroom, a working kitchen and a bedroom stay usable, and services are isolated only in planned windows. Renewing a roof covering, replastering external walls or replacing windows can bring Part L insulation requirements into play for those elements, so we price that from the start.
The building control route is simpler for a house than for a flat. Islington says a building notice cannot be used for residential premises with common areas, which a single house does not have, and under a building notice work can start 48 hours after the notice is given with the correct fee. Islington Council issues completion certificates after satisfactory completion of works in line with the building regulations and full payment of fees. For a landlord re-letting the house, a pre-sale job or executors preparing a probate sale, we gather those certificates with the electrical and gas records into one pack.
- Lime plastering on solid walls and lath and plaster ceiling repairs
- New boiler, cylinder and radiators sized to every room, fitted by a Gas Safe registered engineer
- Sash boxes overhauled with new cords, parting beads and brush seals
VOA Council Tax stock of properties, March 2025, for Old Street & St Luke's. Counts rounded by the VOA.
Why Choose GS Renovation in Old Street
A house in Old Street is an unusual job in a place of flats, and it needs a builder who runs the whole sequence rather than one trade at a time. We visit, look at the fabric, check which planning rules touch the front windows and doors, and give you a written quotation with a programme for an occupied or an empty house. One site team carries the job from strip out to decoration, a registered electrician certifies the rewire, a registered gas engineer does the gas work, and you receive a single handover pack.
- Our own trades on site rather than a chain of subcontractors
- Every wall of the house tapped and every circuit tested before the refurbishment is priced
- Damp traced to its source before anyone suggests an injected course
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about House Refurbishment Old Street
What should I budget for a full house refurbishment in Old Street?
Start from the published UK range of £43,530 to £110,350 for a three-bed house (Checkatrade, 2026) and expect a London house to sit higher. Add a contingency for what only shows once plaster and floors are opened. The itemised quote after the Old Street survey shows each trade separately, so the work can be phased if the total is more than you want to spend at once.
How many houses are there to refurbish in Old Street?
Very few. The valuation list shows 99% of homes in Old Street are flats and 1% are houses, and those houses are terraced, with 0% recorded as semi-detached or detached. A house refurbishment here therefore means a terraced house. We treat each one as its own job, survey the fabric and price from what we find behind the plaster.
Does replacing the front windows of an Old Street house need permission?
Possibly, if the house is in an article 4 conservation area. Islington says a house covered by an Article 4 direction needs householder planning permission to install or replace windows or doors on the front, and it has removed permitted development rights in 40 of its 42 conservation areas. Your designer or agent checks the status and applies where needed, and we repair or build to what is approved.
What hours can builders work on a house in Old Street?
Noisy work in Islington is limited to 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays, unless the council gives prior approval for other times. Quiet trades such as decorating are less of a problem for neighbours. On a terrace we tell the houses either side which days will be loud before they happen.
How far ahead should skips, scaffolding and parking be booked in Old Street?
Parking comes first: most Islington bay suspensions must be applied for at least 14 days before they begin. Scaffolding licence applications should go in at least 10 working days in advance, and a skip on the road needs a council licence. We give you the dates and the number of bays as soon as the programme is agreed.
Does a whole-house refurbishment need building regulations approval?
Parts of it do. A rewire (Part P), new heating, replacement windows, a renewed roof covering and structural repairs to joists come under the building regulations, while redecoration and like-for-like repairs generally do not. In Islington a house can use a building notice, and work can then start 48 hours after the notice is given with the correct fee. A completion certificate follows once the works are complete and the fees paid.
Can we live in the house while it is refurbished?
Yes, with phasing. We keep a working kitchen, one bathroom and a bedroom in use while other floors are stripped, and move the dust screens and temporary services as the work progresses. It takes longer than refurbishing an empty house, because trades cannot move through every room at once, and we show that difference in the programme before you decide.
What does rewiring and replumbing a pre-1919 Old Street house involve?
Mostly careful opening up. A house from before 1919 tends to have lime mortar, lath and plaster and old service runs in the floor voids. We lift boards along planned routes, replace the wiring and pipework, repair joists where earlier trades cut them and make good with compatible plaster. The valuation list puts homes built before 1919 at 16% of the area's stock.
Can you refurbish an inherited house before it is sold?
Yes. For a probate or pre-sale refurbishment we agree a scope with the executors that deals first with what a buyer's survey will pick up: electrics, heating, damp, roof and gutters, then kitchens, bathrooms and decoration. Certificates from the registered trades and the building control completion are collected into one pack for the conveyancing.
Every Service, One Team
More GS Renovation Services in Old Street
One team for every GS Renovation service in Old Street:
Same Service, Nearby Areas
House Refurbishment Near Old Street
We carry out house refurbishment across Old Street and the surrounding areas. Explore a nearby location:
Ready to Start Your Old Street Project?
Free, no-obligation quote for house refurbishment in Old Street.