Office Fit-Out Haringey
Office fit-outs for small and medium office suites in Haringey, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Haringey is small-scale work, and it is honest to say so. The borough is mainly residential, and its office space is most likely to be found in and around a network of one metropolitan centre, six district centres and 38 local shopping centres. Expect a floor above shops, a studio or a small professional suite rather than a corporate tower. We strip out, build partitions, ceilings, lighting and power, and fit the tea point and WCs to suit a business moving in or reorganising.
For Haringey, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Haringey: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The office space that exists in Haringey
Haringey's office stock is spread thinly through its centres rather than gathered in a business district. The borough's centres run from one metropolitan centre and six district centres, including a new centre at Tottenham Hale, down to 38 local shopping centres. In practice that points to first and second floor suites over shops, and to former banks and showrooms. It can also mean small studios in back-street workshops, and professional rooms in converted period buildings around places such as Crouch End and Muswell Hill.
That stock sets the scope. An upper floor over a shop usually shares a staircase with the unit below, has no lift, and was last fitted out decades ago. The job often starts with a strip-out to the shell and a survey of what the landlord's building can take. We check the stair width, the incoming electrical supply and where a small kitchen can drain before the layout is fixed, because those set what your Haringey office can hold.
Cat A and Cat B fit-out for a Haringey office
The first question on a Haringey office job is what state the space is handed over in. Cat A is the landlord's base finish: a clean shell with ceilings, lighting, raised floor or trunking, and working heating and WCs. Cat B is everything that makes it your office, such as meeting rooms, glazed screens, the tea point, data cabling points, furniture and signage inside. A small suite over a shop may be let below Cat A, so part of the Cat A work may fall to you.
Read the lease to see which works are yours and which are the landlord's, and agree that split in writing. Your landlord's licence for alterations usually needs drawings and a method statement before work starts. We coordinate the data cabling routes with your IT supplier, so containment is in place before ceilings close, and we build partitions and power to the layout you sign off rather than a generic plan.
Building regulations and CDM for office work in Haringey
An office fit-out in Haringey is non-domestic building work, so it is checked against the Building Regulations. Haringey Council runs its own Building Control Service, and a registered building control approver is the alternative. The main parts are Part B for fire and means of escape, Part M for access and WCs, and Part L for lighting and services. A new partition that cuts off an escape route, or a kitchenette on the stair, is exactly what building control looks at.
On the full plans route Haringey must grant or reject an application within 5 weeks unless you agree an extension, and rejected plans can be resubmitted at no extra cost within 12 weeks. As a commercial client you also have duties of your own under the CDM Regulations, including allowing enough time and appointing a principal designer and principal contractor where more than one contractor is involved. We work to the designer's fire strategy and hand over the certificates from the registered trades.
Landlord services, protected offices and lease-end reinstatement in Haringey
Haringey says an office to residential Article 4 direction removes permitted development rights for converting offices to homes in its main town centres and designated growth areas. Office floors there are likely to stay offices and be refitted for the next occupier. For a tenant the day-to-day questions are about the building. In a multi-let property the landlord usually keeps the fire alarm, the heating and the incoming supply, recovered through the service charge. New detectors, changes to alarm zones or extra circuits from the landlord's board therefore need its engineer or its written consent, and we agree those tie-ins before the programme is fixed.
The other end of a lease matters just as much. If your lease requires the space to be reinstated or dilapidations to be settled when you leave, the fit-out installed now may have to come out later. We keep a record of what was there before the strip-out, fix partitions so they can be removed cleanly, and label services, which makes a later reinstatement quicker and easier to price for a Haringey tenant.
- Metal stud office partitions boarded both sides
- Dilapidations and reinstatement works at the end of an office lease
- Tea points and kitchenettes on the existing risers
VOA Council Tax stock of properties, March 2025, for all 36 statistical areas in Haringey. Counts rounded by the VOA.
The GS Renovation Difference in Haringey
You get one contractor for strip-out, partitions, ceilings, lighting, power, the tea point and WCs, working to your lease dates and your landlord's licence conditions. We coordinate with your IT supplier and the registered electrician, plan noisy work around the hours your building is occupied, and keep the building control paperwork moving. At handover you receive the electrical and fire alarm certificates and the completion records your landlord and insurer will ask for.
- Free follow-up visit after completion if anything needs attention
- One named contact for the landlord, the building manager and your office manager
- Data cable routes agreed with your IT supplier before partitions are boarded
Reviewed jobs near Haringey
2 MyBuilder reviews from Wood Green and Hornsey, with each customer's own job title:
- New kitchen install moving plumbing, elecs, flooring, Wood Green, 19 Jan 2022 (5 out of 5)
- New Kitchen Assembly & Others for Interior Designer, Hornsey, 5 Jan 2022 (5 out of 5)
Read all 31 on our reviews page.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Haringey
How much does an office fit-out cost in Haringey?
Published guides put the construction part of an office fit-out at £70 to £120 per square foot (Oktra, 2026) and an all-in London fit-out at £148 to £359 per square foot (Cushman and Wakefield, 2026). The survey and your layout fix the scope, and the quote itemises strip-out, partitions, ceilings, lighting, power and making good.
Is there much office space to fit out in Haringey?
Not in large blocks. Haringey's office space is most likely to be found in and around its centres, one metropolitan centre, six district centres and 38 local shopping centres, as suites over shops, studios and professional rooms. The work is small in scale, and we price and programme it that way rather than as a corporate fit-out.
What is the difference between Cat A and Cat B in a Haringey office?
Cat A is the landlord's base finish of ceilings, lighting, floor, heating and WCs. Cat B is the fit-out that makes it your office, such as meeting rooms, the tea point, glazed screens and data points. A small Haringey suite may be let below Cat A, so check the lease to see which works fall to you.
Does a Haringey office fit-out need building control approval?
Usually, yes, where it affects fire escape, access, WCs or lighting and services. Haringey Council's Building Control Service or a registered building control approver checks the work against the Building Regulations. New partitions and a kitchenette are the common triggers, so the application goes in with the layout drawings.
How long does Haringey take to decide full plans for an office fit-out?
Haringey must grant or reject a full plans application within 5 weeks, or longer if you agree an extension of time. If plans are rejected they can be resubmitted and rechecked at no extra cost within 12 weeks. We put the decision date into the programme before ordering partitions or glazing.
Who pays for changes to the landlord's fire alarm in a Haringey office?
Usually the tenant pays for the change, but the landlord controls how it is done. In a multi-let Haringey building the alarm panel, the heating plant and the risers are normally the landlord's, maintained through the service charge. Adding detectors for new meeting rooms or moving a call point is then carried out by the landlord's alarm contractor, or by ours with its written approval, and recorded in the building's fire log.
Does moving a Haringey shop unit into office use need planning permission?
Usually not for the use itself, because Haringey notes that shops, cafes, offices and gyms all fall in Class E. The fit-out still needs building control where it touches escape, access or services, and your landlord's licence for alterations is needed before any work starts on site.
Can office fit-out work be done while staff are still working?
Yes, in phases. We screen off the work area, move teams floor by floor or room by room, and keep noisy work within Haringey's hours of 8am to 6pm on weekdays and 8am to 1pm on Saturdays. Noisy work outside those hours needs the council's agreement, usually through a prior consent. Quiet work such as decorating can run after hours. Power and data to the occupied part stay live, and fire alarm cover is maintained throughout.
What happens to the fit-out at the end of an office lease?
The lease usually decides it. Many leases require the tenant to reinstate the space or pay dilapidations, so partitions, ceilings and data points may have to come out. We record the original condition before strip-out and build removable elements, which keeps a later reinstatement simpler.
Every Service, One Team
More GS Renovation Services in Haringey
One team for every GS Renovation service in Haringey:
Same Service, Nearby Areas
Office Fit-Out Near Haringey
We carry out office fit-out across Haringey and the surrounding areas. Explore a nearby location:
Ready to Start Your Haringey Project?
Free, no-obligation quote for office fit-out in Haringey.