Kitchen Extensions Merton
Rear, side return and wraparound kitchen extensions in Merton, the room, the services and the kitchen built as one job.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £45,000 to £97,500
- Free site survey, itemised quote
A kitchen extension in Merton starts from the house type. Terraced houses make up 43% of the borough's homes against 15% semi-detached or detached. On a terrace the brief is a side return infill or a rear box that pulls the kitchen into the garden; a semi or detached house has the width for a wraparound. Before anything is drawn we check whether a public sewer runs near the back wall, because in Merton that decides which building control route you take and how early the paperwork has to start.
In Merton, a rear kitchen extension of about 30 square metres typically costs £45,000 to £97,500 excluding VAT, or £60,000 to £100,000 for a side return (indicative London ranges, Resi, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Merton: the structural engineer we appoint designs the foundations and steel, we build the room and fit the kitchen, and a registered electrician certifies the electrics.
Price guide
| Work | Indicative London range |
|---|---|
| Rear kitchen extension, about 30 square metres, ex VAT | £45,000 to £97,500 |
| Side return kitchen extension, standard to high specification | £60,000 to £100,000 |
| Wraparound kitchen extension, standard to high specification | £80,000 to £130,000 |
| Side return build rate, per square metre of new floor | £2,400 to £3,200 |
| Kitchen supplied and fitted within the extension | £5,000 to £14,000 |
| Structural engineer's fee | £950 to £2,500 |
Indicative London ranges (Resi, MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Extension Cost and Planning Guide.
Quick estimate for Merton
Merton range: choose above

Side returns and rear boxes on Merton terraces and semis
On a Merton terrace the side return is where the extra kitchen space comes from. The narrow strip beside the back addition is filled in, the old outrigger wall is opened up, and the kitchen, dining space and garden door end up in one room. With terraced houses at 43% of the borough's homes, this is a common shape of extension here, and it is the one that needs most care over the neighbour's wall, the boundary and the light reaching the next house.
Permitted development sets the outer limit for a simple rear box. Nationally a single storey rear extension can go three metres beyond the original rear wall of a terrace or semi, or four metres on a detached house, and no higher than four metres. Merton semis and detached houses, 15% of homes, have the width for an L shaped wraparound, which joins a side extension to the rear one and in most cases takes the project out of permitted development and into a planning application.
Housing in Merton
Merton counts roughly 87,830 homes for Council Tax; 26% are older than 1919, 37% interwar and 36% post-war, with 42% flats and 58% houses. A terrace kitchen extension in Merton starts in a narrow side return, and 43% of homes here are terraced.
Flats, John Innes and designated land in Merton
If you own a flat in Merton, you start from planning permission, not permitted development. The householder extension rules apply to houses only, and flats are 42% of the borough's homes, so this affects a large group of owners. A ground floor flat with a garden needs a planning application and, on a leasehold, the freeholder's written consent as well. We price the build once those are in hand, and we keep the construction within the approved footprint and materials.
Designated land narrows the options further. Every side extension on land such as a conservation area needs householder permission, which catches a wraparound on a semi inside one. In the John Innes Merton Park and Wilton Crescent conservation areas, four Article 4 directions also bring changes such as a roof slope or a porch that fronts the highway under control. Merton's fast track householder decision runs up to 30 days from validation outside a conservation area and up to 46 days inside one, so we plan the start date around that.
Why a nearby sewer changes the Merton building control route
In Merton the position of the public sewer decides your building control route. If the extension comes within 3 metres of a Thames Water sewer, a full plans submission has to be made before work starts, and a building notice is not available. Older terraces often have a shared run behind the houses, so we find the manhole covers and trace the run on the first visit. Building over or close to a public sewer can also need Thames Water's own agreement, which the owner or designer arranges.
The full plans route has its own timing. Merton issues a decision within five weeks, or up to two months if agreed, from the date the first payment is received, and work may begin once 48 hours notice of commencement has been given. Merton's example inspection stages for an extension include the foundation excavation, the oversite, and the new walls with the below ground drainpipes. We leave each stage open until it has been seen, then close it up and move on.
Steel, roof lights and the new kitchen in a Merton extension
Opening the back of the house is the structural heart of a Merton kitchen extension. Merton's full plans application needs structural calculations where the work removes load bearing walls or forms new openings, so the structural engineer we appoint produces them before submission. Where the steel bears on a party wall, or new footings sit close to a neighbour's and go deeper, the Party Wall etc. Act applies and you, as building owner, serve the notices. We then prop, cut the opening and set the steel on its padstones.
Light and services come next. A deep side return can leave the middle of the house dark, so roof lights over the old passage and a wide glazed opening to the garden do the work that the lost window used to do. We run the kitchen fit in the same programme. Drainage and first fix go in while the floor is open and the steel stays visible until it has been inspected. Then the screed goes down, and the units, worktops and appliances go in once plaster has dried.
- Sliding, bifold and steel-framed glazed doors to the garden
- Foundations, drainage and slab with the kitchen services cast in
- Flat roofs with rooflights or a roof lantern over the kitchen
VOA Council Tax stock of properties, March 2025, for all 25 statistical areas in Merton. Counts rounded by the VOA.
The GS Renovation Difference in Merton
You get one team from the first opening in the back wall to the last kitchen door. We price from a visit, set out the sequence on paper, and work to the approved drawings and the structural engineer's design. The inspector's stages are built into the programme rather than squeezed in, and the kitchen trades follow the builders without a gap for you to manage. Our founder brings more than three decades of hands-on building to the site, and you deal with the same people throughout.
- Drains surveyed by camera before the footprint is fixed
- Boiler flue, soil pipe and gully moved off the rear wall in the right order
- Registered in England, Companies House no. 14611254
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Kitchen Extensions Merton
Are there hidden costs with kitchen extensions in Merton?
Every extra cost on kitchen extensions in Merton needs your written agreement, and the foreseeable ones are already priced within £45,000 to £97,500 excluding VAT for a rear kitchen extension of about 30 square metres (indicative). Work in 1930s suburban housing around SW19 occasionally reveals something behind plaster; when it does, GS Renovation stops, costs it and waits for your decision. The sequence of work stays fixed: the kitchen layout is fixed before the slab, so the waste, ducts and island services are cast in the right place.
Can a Merton terrace get a kitchen extension without planning permission?
Yes, if it is a single storey rear extension within the national limits and the house still has its permitted development rights. On a terrace it can go three metres beyond the original rear wall and no higher than four metres. A side return infill that also wraps the back is assessed against the side extension rules, and on designated land such as a conservation area any side element needs planning permission.
Can the owner of a ground floor flat in Merton extend the kitchen?
Yes, but only with planning permission. Householder permitted development applies to houses only, not to flats or maisonettes, so every flat extension goes through a planning application. On a leasehold you also need the freeholder's consent. We build once both are in place and keep the work inside what was approved.
What happens if a Thames Water sewer runs behind a Merton house?
You need a full plans submission before work starts if the extension is within 3 metres of that sewer, and a building notice is not available for those works. Building over or near the sewer may also need Thames Water's agreement. We locate the manholes early, so the route is settled before the programme is fixed and the structural engineer can design the footings around the run.
How long does Merton building control take to decide a full plans application?
Merton issues a decision notice within five weeks, or a maximum of two months if agreed, counted from the date the first payment is received. Work may begin once 48 hours notice of commencement has been given, and work started before that is at your own risk. We prefer to hold the start until the plans are approved, so the structure is not built ahead of any amendment the plans need.
Does a wraparound extension in a Merton conservation area need planning permission?
Yes. All side extensions on Article 2(3) designated land, which includes a conservation area, need householder planning permission, and a wraparound includes a side element. Your designer prepares and submits the application; we build to the approved drawings and conditions, and we raise anything on site that would take the work away from them.
What does the inspector check during a kitchen extension build?
The inspector looks at the work at stages before it is covered. Merton's example stages for an extension include the excavation for foundations, the oversite, and the new walls with the below ground drainpipes. We plan the day around each visit so nothing is backfilled or boarded before it has been seen.
Should the kitchen be fitted by the same team that builds the extension?
It usually makes the job simpler to run. The drainage and first fix go in while the floor is open, and the kitchen layout decides where the waste, water and sockets land. When one team holds both, the units go onto walls that were set out for them, and there is one programme rather than two contractors waiting on each other.
Do roof lights help a side return kitchen in Merton?
Yes, they are what brings light back to the middle of the house. Infilling the side return removes the window that lit that part of the plan, so roof lights over the old passage and a glazed opening to the garden replace it. We fix the positions early so the steel and the roof joists are laid out around them.
Every Service, One Team
More GS Renovation Services in Merton
One team for every GS Renovation service in Merton:
Same Service, Nearby Areas
Kitchen Extensions Near Merton
We carry out kitchen extensions across Merton and the surrounding areas. Explore a nearby location:
Ready to Start Your Merton Project?
Free, no-obligation quote for kitchen extensions in Merton.