Chimney Breast Removal Merton
Chimney breast removal with steel beam support in Merton, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £2,200 to £3,250
- Free site survey, itemised quote
Approval under the building regulations comes before the first brick moves, and the inspector wants to see the propping, the beam and its bearings while they are still exposed. Those visits go into the programme. The design comes from a structural engineer we appoint; our job is to build it accurately and make good.
In Merton, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Merton.
Price guide
| Work | Indicative London range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your Merton address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Merton Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Chimney breast removal in Merton's terraces
Most Merton terraces still carry their original breasts in the two front rooms and often in the closet wing behind. Homeowners usually want the ground or first-floor breast removed to reclaim the alcoves, but the masonry stack continues up through the floors and out at the roof. That retained weight cannot be left hanging, so every removal starts with a structural engineer confirming exactly what is being supported.
Where we take out a breast on the lower floor and keep the stack above, we carry it on a steel beam set on padstones; gallows brackets are used only where the engineer and building control accept them. Where the stack is yours alone and the whole flue is redundant, taking it down and making the roof good can be the better answer, because it removes the load and the future damp risk, but a stack shared with next door usually stays.
Housing in Merton
Around 87,830 homes make up Merton on the valuation list; 42% are flats and 58% houses, and 26% date from before 1919, 37% from between the wars and 36% from after 1945. 43% of homes here are terraced; the breasts of a terrace in Merton usually sit on the party wall back to back with next door's, so removing one needs a party wall notice.
Chimney breast certificates and Merton Park roof slopes
Merton building control issues a completion certificate when the work is finished and advises keeping it because it will be needed to sell the property. That matters for chimney breasts in particular. A removed breast is easy to spot from the loft, or from a stack on the roof with nothing visible beneath it in the rooms, and a buyer's solicitor then asks for the certificate. Keep it with the engineer's calculations and photographs of the steel taken before it was boxed in, so a sale in Merton is not held up while an old removal is investigated.
The roof needs its own check in the John Innes Merton Park conservation area, one of the two Merton conservation areas, with Wilton Crescent, where planning permission is needed for the changes set out in four Article 4 directions. The second John Innes Article 4 (2) direction withdraws permitted development for altering a roof where the roof slope would front a public highway or other public space. Taking a redundant stack down below the roof and retiling the gap alters that roof, so ask Merton Council before the scaffold is booked. Carrying the stack on steel and leaving it standing avoids the question.
Party wall and damp control in SW19
Merton's terraces share a party wall with the house next door, and the chimney stack almost always sits within it. Removing the breast, or bearing a beam into that shared wall, is notifiable under the Party Wall Act, so you, as building owner, serve notice on the adjoining owner before work begins. We give you the drawings and programme the notice needs and keep the neighbour informed throughout the work.
The structural support is notifiable under the Building Regulations, and Merton Council's building control signs it off, not the planning department. Once the stack is secured we cap any redundant flue with proper ventilation so the old brickwork breathes and stays dry, then replaster the wall and reinstate the skirting so there is no sign a breast was ever there.
What the house is like meanwhile
A chimney breast removal is noisy and dusty for a short period rather than mildly disruptive for a long one, which most people find easier to live with. Expect two or three days of breaking out. Through those days the room is out of use and sealed off, and we would suggest not working from home in the room directly above it if your week can be arranged any other way. If you have small children or anyone with a respiratory condition at home, tell us at survey and we will phase the noisy work differently.
The rest is manageable. Water and power stay on. Heating may be off in that one room while a radiator is moved. Dust is caught at source with extraction rather than left to settle, and the route from the room to the front door is boarded and sheeted. In a Wimbledon or Mitcham terrace where the front door opens straight into the hall, we set the screen at the room doorway so the stairs stay clean.
- Hearth removal and floor structure reinstatement
- Ceiling and joist support where the breast carried them
- Programme planned around party wall notice periods for a shared stack
VOA Council Tax stock of properties, March 2025, for all 25 statistical areas in Merton. Counts rounded by the VOA.
The GS Renovation Difference in Merton
Merton homeowners choose GS Renovation because we treat chimney breast removal as the structural job it is. You get an engineer-checked support, usually a steel beam on padstones, with gallows brackets only where the engineer and building control accept them, building control handled end to end, tidy working in an occupied home, and a signed-off, replastered finish, backed by our founder's 30+ years on the tools.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about Chimney Breast Removal Merton
How much should a Merton homeowner set aside for chimney breast removal?
The right sum to set aside for chimney breast removal in Merton is fixed after the survey, not before it, and usually falls within £2,200 to £3,250 for one floor on a beam (indicative). Guessing usually means guessing wrong, and the SW19 visit costs nothing. GS Renovation then gives an itemised total including Merton Council building control approval of the steel carrying the retained stack. Call 07472 424 226 or email info@gsrenovationltd.co.uk.
How disruptive is a chimney breast removal in an occupied Merton house?
Manageable, provided the room is treated as a sealed site. One room is out of use for roughly a fortnight, there is a noisy demolition day or two, and the rest is propping, steelwork and making good. In an SW19 house we screen the doorway, protect the stair, and keep the kitchen and bathrooms working throughout. Plaster then needs drying time before you decorate, which is the part people underestimate.
Can the whole chimney come down, stack and all, on my Merton house?
If the stack is yours alone, often yes. Taking everything down to below the roof means nothing is left hanging, so there is no beam or bracket to design. The roof is then repaired over the old opening. If the stack is shared with next door, it usually stays, and your breasts are removed below with support.
Where is the chimney breast likely to be in a Merton 1930s semi?
Often on the party wall with the attached neighbour, stacked through both floors. That means any removal is party structure work, needing notice at least two months before work starts. The stack above usually serves both houses, so it is supported rather than removed, and their flues stay intact.
How is the flue sealed off after a chimney breast removal in Merton?
It is capped at the pot but never sealed airtight. A ventilated cowl goes on top, and a grille is fitted low down inside the room where the breast once stood, so a slow draught runs up the empty flue. That stops condensation and driven rain soaking into the brickwork that remains. Flues belonging to next door in the same stack are left as they are.
Will the steel for our Merton chimney removal show in the ceiling?
Sometimes as a small boxed section. The beam carrying the upper breast sits in or under the ground floor ceiling, depending on the joist direction and the steel size. Where it can sit within the floor depth it disappears; where not, it is boxed in plasterboard. Building control inspects it before it is covered.
Will a buyer ask for paperwork on a chimney breast removed years ago in Merton?
A buyer's solicitor may well ask, and the certificate is the answer. Merton building control issues a completion certificate when the work is finished and advises keeping it for a sale. If an earlier owner took a breast out and no certificate can be found, have the support opened up and checked by a structural engineer before the house is marketed. Merton building control can then be asked about regularising the work, so it is not left to the middle of a sale.
Does removing a stack from a street-facing roof in John Innes Merton Park need planning permission?
It can. The second John Innes Article 4 (2) direction withdraws permitted development for altering a roof where the roof slope would front a public highway or other public space. It is one of the directions that apply in the John Innes Merton Park conservation area. Check with Merton Council before the stack comes down. Keeping the stack and carrying it on steel below leaves the roof unaltered.
How soon should Merton building control be called to see a chimney support?
Book it at least 24 hours ahead. Merton's rule is that a site inspection must be requested at least 24 hours from the commencement of work, and on a chimney breast removal the visit that matters is the one to the new beam or brackets. Leave the ceiling under the retained breast open until the inspector has been, and time the removal so the new support is finished and still exposed on the day of the visit.
Every Service, One Team
More GS Renovation Services in Merton
One team for every GS Renovation service in Merton:
Same Service, Nearby Areas
Chimney Breast Removal Near Merton
We carry out chimney breast removal across Merton and the surrounding areas. Explore a nearby location:
Ready to Start Your Merton Project?
Free, no-obligation quote for chimney breast removal in Merton.