HMO Conversions Romford
House to HMO conversions and licence upgrades in Romford, fire doors, detection and shared amenities built to the council's licence standards.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £40,000 to £75,000
- Free site survey, itemised quote
HMO conversion in Romford starts with planning. Havering's two HMO Article 4 Directions, in force since 13 July 2016, remove the usual permitted change to a small shared house for most house types. Every ward is now inside an additional licensing scheme for smaller HMOs. For a landlord that means consent first, then a build to the council's room, kitchen and fire standards, then the licence. We carry out the building work to those standards.
In Romford, a light HMO conversion for four to six tenants typically costs £40,000 to £75,000 in construction, or £90,000 to £150,000 with an en-suite to every bedroom (indicative London ranges, Mayfair Studio and LetCompliance, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Romford: we build the fire doors, detection, bathrooms and kitchens to the council's HMO standards, the landlord applies for the licence, and a registered electrician certifies the electrics.
Price guide
| Work | Indicative range |
|---|---|
| Light HMO conversion, London, 4 to 6 tenants, construction only (Mayfair Studio) | £40,000 to £75,000 |
| Full HMO conversion with en-suites, London, 5 to 6 beds (Mayfair Studio) | £90,000 to £150,000 |
| 5-bed HMO conversion, London and South East (LetCompliance) | £35,000 to £60,000 |
| Fire safety works, typical 5-bed HMO, UK guide (LetCompliance) | £5,000 to £9,500 |
| En-suite added to one bedroom, London (Mayfair Studio) | £3,500 to £8,000 per room |
| Second shared bathroom, UK guide (LetCompliance) | £4,000 to £9,000 |
Indicative ranges from published cost guides (Mayfair Studio and LetCompliance, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.
Quick estimate from published guides
Guide range: choose above

HMO Article 4 Directions and Policy 8 in Romford
Letting a Romford house by the room is a different route from flats, and Havering has removed the usual permitted change. Class L would normally let a house become a small HMO without an application, but Havering's two HMO Article 4 Directions have been in force since 13 July 2016. The first covers the Brooklands, Romford Town, Heaton and Gooshays wards. The second covers flats, terraced and semi-detached houses in the rest of the borough. The wards are named as they stood when the directions were made, so check the address against the direction's plan.
If the change needs consent, Havering tests it against Local Plan Policy 8. The original house has to measure 120 sq m or more, and the shared house cannot take a street past 10% HMOs. A shared living or dining room must also seat every occupant together. So before buying a Romford house to let by the room, measure the floor area as first built and count the shared houses already on the street.
Housing in Romford
By the valuation list's count, Romford holds about 20,230 homes, 65% houses and 35% flats; by age, 15% were built before 1919, 42% between the wars and 43% since 1945.
Mandatory, additional and selective licensing in Romford
A shared house in Romford is likely to need a licence whatever its size. Five or more people from two or more households sharing a kitchen, bathroom or WC puts the house in the mandatory scheme, the 5 and 2 thresholds Havering uses. Smaller shared houses fall under Scheme 3, Havering's additional licensing for every ward, running from 18 March 2026 until 17 March 2031. The landlord makes the application; we build to the conditions the licence will set.
Sequence matters here. Apply before the C3 to C4 change has planning consent and Havering grants a 1 year licence only, and the council says the fee is not refundable if permission is then refused. Scheme 2, the selective scheme, is a separate matter: it covers single-family lets in seven named wards, Rush Green and Crowlands and Squirrels Heath among them, which counts if the house later goes back to one household.
Kitchens, bathrooms and shared space in a Romford HMO
Havering's accommodation standards set how much kitchen a shared house needs. Where lettings do not have their own, it requires one full set of shared cooking facilities per 5 persons, and the shared kitchen should be no more than one floor away from the letting. On a three-storey Romford house with rooms at the top, that can mean a second kitchen on the upper floor, which sets the drainage and extract routes before any partition is built.
Any kitchen formed in the conversion gets a mechanical extractor, whether or not its window opens. Communal space counts only as an unlocked room with seating of 4.6 sq m or more, or as a kitchen with 4.6 sq m added for a table. Bathrooms and WCs are sized to the headcount the licence will allow. We mark out every room against those figures on the bare floor first, along with the national licence minimums: 6.51 sq m for one sleeper over 10, 10.22 sq m for two, and no sleeping room under 4.64 sq m.
Fire safety, sound and EPC rating in a Romford shared house
Fire safety is the core of an HMO build. In the kitchen Havering wants a fire blanket, a mains heat detector and a fire rated door. Beyond it, the designer specifies fire doors to each letting, linked smoke detection and a protected escape route, following Part B and the LACORS housing fire safety guidance. We fit closers, intumescent seals and fire stopping round every pipe and cable that passes through.
Sound and energy come next. Lettings share walls and floors, so we add insulation and a resilient layer where a bedroom sits over a kitchen or next to a stair. Havering's rented housing standards look for effective insulation and efficient heating to reach an EPC of E or better where applicable. GOV.UK adds that from 1 April 2020 a property below E cannot be let, or stay let, without a valid exemption.
- Shared kitchens enlarged or added for the number of occupants
- Bedroom layouts checked against the national minimum room sizes
- Hot water sized for several sharers showering at once, with any gas work by a Gas Safe registered engineer
VOA Council Tax stock of properties, March 2025, for all 5 statistical areas in Romford. Counts rounded by the VOA.
Working With GS Renovation in Romford
An HMO in Romford only earns once it is licensed, and the licence inspection looks at the exact things builders tend to skimp: fire doors, detection, extraction and room sizes. We build to the approved plans and the council's standards as one programme under one contact. Our founder has more than three decades of hands-on building experience. A registered electrician certifies the alarm and electrical work, and you get a written quotation after a survey and a programme that runs from consent to licence inspection.
- Sound lining between bedrooms so one sharer does not keep another awake
- Detection laid out to the grade the council's HMO fire guidance sets
- Materials priced at options, so you choose the finish
Excellent service. George's knowledge and skills are the best in the market. He knows what he is doing, does really high quality work, gives good…
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about HMO Conversions Romford
Why do HMO conversion quotes in Romford vary?
Because they rarely build to the same standard. One includes fire doors, interlinked detection, and bathrooms and a kitchen sized to the council's amenity standards; another prices a lower specification that may fail inspection. The published figure of £40,000 to £75,000 for a light conversion (Mayfair Studio, 2026) is a starting point. Compare Romford quotes against the licence standards.
Can a Romford house become a small HMO without planning permission?
No, for a flat, terrace or semi anywhere in the borough. Havering's first HMO Article 4 Direction covers the Brooklands, Romford Town, Heaton and Gooshays wards, and the second covers flats, terraced and semi-detached houses everywhere else. A detached house outside those four wards is not named in the second direction, so check its position with the council. The owner or their agent applies, and we start once consent is granted.
What does Havering look for in a Romford HMO proposal?
Policy 8 asks for an original property of 120 sq m or more and caps shared houses at 10% of the properties in any one street. The house also needs a communal dining or living room big enough for every occupant to use together, which shapes the layout we build.
Does a small shared house in Romford need a licence?
Yes. Havering's additional licensing scheme for smaller HMOs covers every ward from 18 March 2026 to 17 March 2031, and a mandatory licence applies once 5 or more people from 2 or more households share facilities. The owner applies, ideally after planning consent is in place. One exception matters here: a flat in a purpose-built block of three or more self-contained flats falls outside mandatory licensing, although a council's additional scheme can still cover it.
What kitchen standards apply to a Romford HMO conversion?
Where lettings have no kitchen of their own, Havering asks for a full set of shared cooking facilities for every 5 people. A newly converted kitchen needs a mechanical extractor even if it has a window that opens, plus a fire blanket, a mains heat detector and a fire rated door. We fit all of these in the build.
Does a Romford HMO for more than six people follow a different planning route?
Yes. The London Plan glossary treats an HMO for three to six people as Use Class C4 and one for more than six as Sui Generis. No permitted development class covers a change to a Sui Generis HMO, so the owner needs planning permission. Class L also cannot turn one house into two or more separate C4 HMOs. The larger layout adds kitchens, bathrooms and fire protection, which we build to the approved plan.
What happens if a Romford HMO licence is applied for before planning consent?
Havering then grants a licence for 1 year only, rather than the full term, because the C3 to C4 change has no consent yet. If permission is later refused, the council says the fee cannot be refunded. The safe sequence for a Romford landlord is planning consent, then the build, then the full licence application.
What fire safety work does a Romford HMO conversion need?
Havering's standards require a fire blanket, a mains powered heat detector and a fire rated door for the kitchen. The designer adds fire doors to each letting, linked smoke detection and a protected escape route under Part B and the LACORS guidance. We fit the doors, closers, seals and fire stopping to that specification.
What EPC rating does a Romford HMO need before it is let?
At least E. Havering's private rented standards expect an EPC rating of at least E where applicable, and GOV.UK says landlords cannot let or continue to let properties below E without a valid exemption since 1 April 2020. Havering also discounts part of the licence fee for properties rated C and above, so insulation during the build can pay back.
Every Service, One Team
More GS Renovation Services in Romford
One team for every GS Renovation service in Romford:
Same Service, Nearby Areas
HMO Conversions Near Romford
We carry out hmo conversions across Romford and the surrounding areas. Explore a nearby location:
Ready to Start Your Romford Project?
Free, no-obligation quote for hmo conversions in Romford.