Flat Refurbishment Havering
Flat refurbishments in Havering, your flat renewed within the lease, the licence and the rules of the block.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £33,000 to £48,000
- Free site survey, itemised quote
Flat refurbishment in Havering is a smaller market than house work, but a real one: 26% of homes in the borough are flats. They range from maisonettes and low blocks on the post-war estates to newer purpose-built flats among the 13% of all Havering homes built in 2000 or later. We renew a flat inside its own walls, working to the lease, the managing agent's rules and the neighbours above and below.
For Havering, published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one, with budget kitchen and bathroom fittings, at £15,000 to £18,000, and London flats usually cost more (Checkatrade and MyJobQuote, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Havering: we refurbish the flat within the terms of your lease and licence to alter, protect the common parts throughout, and a registered electrician certifies the new consumer unit and circuits.
Price guide
| Work | Indicative range |
|---|---|
| Flat, full refurbishment | £33,000 to £48,000 |
| Flat, basic refurbishment | £15,000 to £18,000 |
| Full rewire, one-bed flat | from £3,900 |
| Consumer unit replacement | £350 to £750 |
| Sound insulation under a new floor | £45 to £160 per square metre |
Indicative ranges from published cost guides (Checkatrade and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

The lease and the managing agent come before the first Havering site visit
Refurbishing a leasehold flat in Havering starts with the lease, not the tools. Flats are 26% of homes here, and a flat is normally held on a lease that requires the freeholder's licence to alter before any work to walls, floors, plumbing or wiring runs that cross the structure. Read it early: it may also fix working hours, ban hard floors without an acoustic layer, and set rules for deliveries, lifts and bins in the common parts.
The managing agent usually handles the licence, and it can ask for your designer's drawings, a method statement and a description of each trade before it signs. We supply the schedule of works and the programme for that pack, so the paperwork matches what will be built. Build the licence into the start date. A job that begins without it can be stopped by the freeholder, and putting right unapproved work in a shared building costs more than waiting. Building regulations run alongside the lease: Havering treats a building notice as the route for changes inside your home, lodged at least 48 hours before the work.
Housing in Havering
For Havering the Council Tax list gives about 108,680 homes; by type 26% flats and 74% houses, by age 59% post-war, 36% interwar and 5% older than 1919.
Working inside a Havering block without upsetting the neighbours
A flat refurbishment in a Havering block is as much about the shared parts as the flat itself. We protect the stair treads, handrails and lift car before the first delivery, carry materials up at agreed times and take waste out in bags rather than leaving it on the landing. Where the block has residents' parking, we agree a bay for the van with the agent so nobody's space is taken.
Noise travels through a block in ways it does not through a house. Breaking out screed, chasing walls and cutting tiles are kept to the hours the lease or the block rules allow, and we give the flats above, below and alongside a note of the noisy days. Water is the other risk. Before a bathroom or kitchen is stripped we find the stopcock, test it and cap the supplies, because a leak into the Havering flat below is the fastest way to lose the goodwill of a building.
Letting a Havering flat after refurbishment: EPC and licensing
A flat refurbished for letting in Havering has to meet the energy rules before the next tenancy. GOV.UK says that since 1 April 2018 private landlords may not let domestic properties on new tenancies if the EPC rating is F or G unless an exemption applies. In a flat the easy wins are electric heating controls or a new combination boiler, LED lighting and insulation behind any external wall we open, since the loft and roof usually belong to the freeholder.
A better rating also lowers a licence cost. Havering offers a discount on the Part B licence fee for properties with an EPC rating of C and above, and the flat has to be licensed in the selective wards. Havering's Scheme 2 selective licensing runs from 18 March 2026 until 17 March 2031 in Beam Park, Harold Wood, Rainham and Wennington, Rush Green and Crowlands, Squirrels Heath, St Albans and St Edwards. The landlord applies for the licence, and we bring the flat up to the condition the application will describe.
Floors, fire doors and services inside a Havering flat
New hard floors are the change most likely to cause a complaint in a Havering block. A lease may require carpet or an acoustic underlay to limit impact sound to the flat below. We lay an approved resilient layer under laminate, timber or tiles and keep a gap at the skirting so the floor does not touch the walls. Check the lease wording before choosing a finish, because a floor laid against it may have to come up.
Fire safety inside a block follows different rules from a house. The flat entrance door and the compartment walls and floors protect the whole building, and they are normally the freeholder's or the responsible person's concern. We leave the entrance door alone unless the agent approves a like for like fire door. Inside the flat, a registered electrician renews and certifies the consumer unit and wiring. New smoke and heat alarms for Havering flats go in with the first fix.
- EPC improvements to meet the minimum standard for let flats
- Boiler replacement on the flue route the building allows, by a Gas Safe registered engineer
- Unvented cylinder replacement, notified to building control
VOA Council Tax stock of properties, March 2025, for all 30 statistical areas in Havering. Counts rounded by the VOA.
Why Choose GS Renovation in Havering
Refurbishing a flat means answering to more people than the owner: the freeholder, the managing agent and the neighbours. We prepare the schedule and programme the agent needs for the licence to alter, protect the common parts and keep to the building's hours. Work follows a fixed order: strip out, first fix, plaster, kitchen and bathroom, second fix and decoration. Waste leaves in bags by the agreed route, the lift is lined before the first delivery, and the neighbours know the noisy days in advance.
- The lease and licence to alter read before a flat is quoted
- New pipework pressure tested so nothing leaks into the flat below
- Our own trades on site rather than a chain of subcontractors
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid…
I am very happy to recommend George after he completed the work on my 2 bathrooms. He worked very hard to make sure everything was completed and even…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
FAQ
Frequently Asked Questions about Flat Refurbishment Havering
How much does a flat refurbishment cost in Havering?
Published UK averages put a full flat refurbishment at £33,000 to £48,000 and a basic one at £15,000 to £18,000 (Checkatrade and MyJobQuote, 2026), and London flats usually cost more. In a Havering block the building adds its own lines: protecting the common parts, carrying materials up, working in the managing agent's hours and meeting the lease's floor rules. The quote after the survey itemises each one.
Does refurbishing a Havering flat need the freeholder's consent?
Usually, yes. 26% of homes in Havering are flats, and a lease normally asks for the freeholder's licence to alter before work to walls, floors, plumbing or wiring. The managing agent often handles it and may ask for your designer's drawings and our method statement. Allow a few weeks for the licence before the start date, and we work to the conditions it sets.
Which Havering wards need a selective licence for a let flat?
Seven wards. Havering's Scheme 2 selective licensing covers Beam Park, Harold Wood, Rainham and Wennington, Rush Green and Crowlands, Squirrels Heath, St Albans and St Edwards. A licence is needed there to rent a house or flat to a single family or 1 to 2 unrelated occupants from 18 March 2026 until 17 March 2031. The landlord applies, and we carry out the works the licence conditions call for.
What EPC rating does a let flat in Havering need?
At least E for a flat covered by the MEES Regulations, unless a valid exemption applies. GOV.UK says that from 1 April 2020 landlords cannot let or continue to let below E. Havering's private rented accommodation standards also expect effective insulation and efficient heating to reach E where applicable. We plan heating and insulation upgrades so the finished flat can be reassessed.
Does Havering discount the licence fee for a let flat rated EPC C?
Yes, on licensed properties. Havering offers a discount on the Part B licence fee for properties with an EPC rating of C and above. For a flat in a selective licensing ward that is worth weighing when choosing between a basic boiler swap and a fuller upgrade of heating controls, lighting and wall insulation during the refurbishment.
Can we lay wooden floors in a Havering leasehold flat?
Often, if the lease allows it and the floor has an acoustic layer. A lease may require carpet or an approved underlay to stop footsteps carrying to the flat below. We lay a resilient layer under timber, laminate or tile and isolate the edges from the walls. Show the managing agent the specification before ordering, because some Havering blocks set their own standard.
Who replaces the front door of a Havering flat in a block?
Normally the freeholder or the responsible person decides, because the flat entrance door is part of the fire protection for the whole building. Some leases make it the leaseholder's door, but the fire rating and self closer still matter to everyone. Ask the managing agent before changing it. If they approve a like for like fire door, we fit it to the certified specification.
What if the Havering flat is in a high-rise block?
Work in a higher-risk building, broadly a residential block of at least seven storeys or eighteen metres, falls under the Building Safety Act regime, where building control approval comes from the Building Safety Regulator rather than the local council. That adds time before work starts. Confirm with the managing agent whether the block is registered as higher-risk before we price the job.
How do you stop a leak into the flat below during a refurbishment?
By isolating and testing before anything is stripped. We find and test the stopcock, cap the supplies to the kitchen and bathroom, and pressure test new pipework before it is boxed in. A new shower gets a tanked floor and walls. If a leak does happen, water is turned off at once and the neighbour and the managing agent are told the same day.
Every Service, One Team
More GS Renovation Services in Havering
One team for every GS Renovation service in Havering:
Same Service, Nearby Areas
Flat Refurbishment Near Havering
We carry out flat refurbishment across Havering and the surrounding areas. Explore a nearby location:
Ready to Start Your Havering Project?
Free, no-obligation quote for flat refurbishment in Havering.