Chimney Breast Removal Havering
Chimney breast removal with steel beam support in Havering, the beam sized by the engineer we appoint and the work signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £2,200 to £3,250
- Free site survey, itemised quote
Havering is mostly 1930s semis and postwar estate houses, where stacks are shorter and lighter than in inner London terraces, plus larger detached properties that often have several. The support needed varies accordingly. A structural engineer calculates it for the house in question, and we install the steel and finish the room.
In Havering, removing a breast on one floor typically costs £2,200 to £3,250 on a steel beam, and £3,000 to £5,000 across two floors (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Havering.
Price guide
| Work | Indicative London range |
|---|---|
| One floor, steel beam (the usual route) | £2,200 to £3,250 |
| One floor, gallows brackets where the engineer and building control accept them | £1,500 to £2,500 |
| Two floors | £3,000 to £5,000 |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Chimney Breast Removal Guide.
How the job runs
- Free site survey at your Havering address: which floors the breast runs through, a shared stack, any live flue.
- The engineer we appoint designs the support, and the work is registered with Havering Council building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- The floor above is propped and the breast comes down in courses from the top; what remains sits on the support the engineer specified.
- Building control inspects the support before it is covered. We make good, and the completion certificate follows.

Chimney breasts in Havering's 1930s semis
Most of Havering's interwar homes were built with chimney breasts in the front reception and back kitchen, and in the borough's semi-detached houses those stacks and flues usually sit within the party wall shared with next door. Because the breast helps carry the masonry above, we begin every job with a structural engineer's assessment of exactly what the wall is holding before anything is taken out.
On the lower floors we support the retained stack on a steel beam bearing into the party wall, or on gallows brackets bolted into it only where the engineer and building control accept them. In taller houses, or where you want the full breast gone through both floors, we more often remove the whole stack and make the roof good, so nothing is ever left hanging unsupported.
Housing in Havering
The Council Tax list puts Havering at about 108,680 homes, 26% flats against 74% houses; 5% went up before 1919, 36% between the wars and 59% after 1945. The shared stack of a semi in Havering means a party wall notice before removal, and 29% of homes here are semi-detached.
Havering chimney stacks, satellite dishes and roof rules
Before a Havering chimney breast comes out, look at what is fixed to the stack above the roof. An aerial or a dish on the chimney has to move if the stack comes down, and in the Havering-atte-Bower Conservation Area an Article 4 Direction means planning permission is required for satellite dishes. There, a dish moving from the chimney to a wall is a planning matter, not a quick visit from the aerial fitter. Outside that area the new position is still worth agreeing before the scaffold goes up, so the cable can be run inside while the breast is open and before any plaster goes on.
The Gidea Park Article 4 Direction applies to dwelling houses within the Gidea Park Conservation Area and was confirmed on 24 June 2016. It removes Class C permitted development rights for other alterations to the roof of a dwellinghouse to the front and sides. Taking only the breasts out inside the house leaves the roof alone. Taking the whole stack down does change the roof. Whether removing a stack on a front or side slope counts as one of the alterations the direction covers is a question for Havering planning, so ask before the roofer quotes. Keeping the stack and carrying it on steel inside the house avoids the question.
Party wall and building control in RM postcodes
Because Havering's semis and terraces share a party wall with the neighbouring home, and the chimney stack usually sits within it, removing a breast or bolting on gallows brackets is notifiable under the Party Wall Act. You serve notice on the neighbour before work begins, so the shared wall is dealt with properly and there are no disputes later.
The structural support is controlled under the Building Regulations, and Havering Council's building control signs it off. No planning permission is needed for this internal work, though a listed house needs listed building consent. We manage the lot: appointing the engineer who produces the calculations, safe removal and propping, capping any redundant flue with ventilation against damp, and replastering so there is no trace the breast was there.
Postwar houses and their lighter flues
Havering is not all 1930s brick. The postwar estates around Harold Hill and the borough's later council-built housing often used precast concrete flue blocks or a slim brick stack rather than the deep breast of an interwar semi, and some have no true breast at all, only a shallow chimney block set against the wall. The support question in those houses is completely different, and in a fair number of cases far simpler.
It still has to be checked rather than assumed. We establish what the flue is built from, whether anything above bears on it, and whether a back boiler or gas fire was ever fitted, because the supply must be capped by a Gas Safe engineer before anything comes out. Where the block is genuinely non-structural, removal is quick. Where it turns out to be carrying part of the roof, the engineer designs support in the usual way.
When the wall is ready to decorate
New plaster over a removed breast is not ready for paint the moment it stops looking wet. It holds a lot of water, and even in a Havering house with the heating running it wants a proper stretch of time before it is dry through, longer in winter and longer again across a big wall in a detached property where two breasts have come out on the same elevation. Paint it early and the finish flakes.
The first coat should be a thinned mist coat of contract emulsion, which soaks in and gives the topcoats something to grip. Wallpaper wants longer still, and heavy vinyl paper hung on green plaster is the commonest reason a new wall ends up being stripped again. If the room has a textured ceiling running up to where the breast stood, mention it early, because matching an existing pattern is a different task from a flat patch.
- Steel beam support on padstones for a retained stack above
- Ventilated caps and airbricks to disused flues
- Programme planned around party wall notice periods for a shared stack
VOA Council Tax stock of properties, March 2025, for all 30 statistical areas in Havering. Counts rounded by the VOA.
The GS Renovation Difference in Havering
Havering homeowners choose GS Renovation because we treat chimney breast removal as structural work, never a quick knock-out. You get engineer-designed support, usually a steel beam, with gallows brackets only where the engineer and building control accept them, building control handled throughout, tidy working in an occupied home, and a signed-off result, backed by our founder's 30+ years on the tools.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about Chimney Breast Removal Havering
What does the chimney breast removal quotation for a Havering home cover?
Labour, materials, approvals, reinstatement and the programme are all on the chimney breast removal quotation for an RM1 home in Havering, inside £2,200 to £3,250 for one floor on a beam (indicative). GS Renovation writes it so each element can be checked against another builder's round number. The scope reflects the property, because what remains of the Havering stack above decides the beam that carries it. Email info@gsrenovationltd.co.uk to see a sample layout.
Is an unsupported chimney breast a common problem in Havering houses?
Common enough that we look for it on every survey. Plenty of RM11 and RM1 semis had a ground-floor breast taken out decades ago by someone who did not realise the masonry above needed carrying. The signs are cracking above the old opening, a bedroom breast that moves under hand pressure and doors that have started binding. An engineer assesses, we install the support they design, and Havering Council regularises it.
Do I need party wall notice to remove a chimney breast in my Havering semi?
Usually, since a semi's breast is built into the wall it shares with the house joined to it. Two months ahead of work, you as building owner, or your surveyor, serve your neighbour a party structure notice. Their fireplace often backs straight onto yours, so the engineer confirms their half stays sound once your half has gone. Dissent from them brings in surveyors, whose award governs how the cutting proceeds.
Should the stack above my Havering roof come down as well?
If no fireplace in the house will use it again, taking the whole stack down is often the simpler outcome: nothing is left needing support, and the roof is tiled over. Keeping it means supporting it on steel, or on gallows brackets only where the engineer and building control accept them. A retained stack with an unused flue should be capped at the top and ventilated.
Which floor comes out first when both breasts go in a Havering house?
The top one. Working down from the loft means no masonry is ever left hanging over an opening, and the stack is dealt with first. Removing the ground floor breast first would leave the bedroom breast and stack sitting on temporary props, which is slower and riskier. The engineer's design sets the sequence, and building control inspects at each stage.
Can a chimney breast come out of a Havering bedroom and leave the one downstairs?
Yes, and it is a common request because bedroom breasts eat wardrobe space. The downstairs breast carries on doing its job, but the stack in the loft still needs support once the bedroom section is gone, usually a beam across the loft or brackets where building control accepts them. The engineer checks the loft floor can take that load.
Does a Havering house built after 1945 still need an engineer for its chimney breast?
Yes. 59% of Havering homes were built after 1945, and in those houses the flue may be clay liners in a slim brick stack, a column of precast blocks, or a breast rebuilt at some point. The only way to know what the stack above is doing is to open up and look. The structural engineer we appoint needs that information before designing the support, and building control needs the design before it can sign the removal off.
When should the building notice go in for a Havering chimney breast removal?
Havering asks for a building notice application at least 48 hours before work starts. Those 48 hours are a minimum, not a plan. Any old gas fire must be capped by a registered engineer, the steel delivered, and any party wall notice served by the building owner and settled before the notice goes in. That way the inspector sees the support in place before it is boxed in and plastered, and nothing has to be opened up again.
Can a chimney breast come out of a Havering flat?
Yes, with more consents than in a house. 26% of Havering homes are flats, and in a flat the stack above your breast usually passes through the flat upstairs and belongs to the building, not to you. The freeholder's licence to alter comes first, and the upstairs owner needs to know how the breast in their flat will be carried. The structural engineer we appoint then designs support that works for every floor above, not just yours.
Every Service, One Team
More GS Renovation Services in Havering
One team for every GS Renovation service in Havering:
Same Service, Nearby Areas
Chimney Breast Removal Near Havering
We carry out chimney breast removal across Havering and the surrounding areas. Explore a nearby location:
Ready to Start Your Havering Project?
Free, no-obligation quote for chimney breast removal in Havering.