Bathroom Renovation Havering
Bathroom and wet-room refurbishment in Havering, tanked, plumbed and tiled by one team.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £6,000 to £20,000+
- 10 to 15 working days on site
- Free design visit, itemised quote
GS Renovation fits bathrooms and en-suites across Havering, working in the post-war houses and 1930s semis that fill RM1 to RM14. Across Romford and Upminster, drawing on our founder's 30+ years on the tools, we handle the full job, from stripping out and tanking through drainage, ventilation, tiling and underfloor heating to a finished, watertight bathroom or wet room.
In Havering, a full bathroom refit typically costs £6,000 to £20,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Havering: we carry the tanking, plumbing and tiling as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Bathroom renovation, full refit | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Bathroom Renovation Cost.
Quick estimate for Havering
Havering range: choose above
How the job runs
- Free design visit at your Havering home and an itemised quote.
- Strip-out, then first-fix plumbing and electrics.
- Tanking to the wet areas, then tiling.
- Sanitaryware and second fix, with notifiable electrics certified by a registered electrician. Typically 10 to 15 working days on site.

Wet rooms and en-suites in Havering
The 1930s semis of Havering were built with a single family bathroom, often over the hallway or above the kitchen, so adding an en-suite or a second bathroom is a frequent request. In these homes we carve space from a large main bedroom or the landing, and we design compact, well-planned layouts that fit without feeling cramped. Every wet area is properly tanked and waterproofed before tiling, so moisture never reaches the timber floors of an interwar house.
Walk-in showers and full wet rooms are popular in RM11 and RM12 homes, whether for a sleek modern finish or to make a bathroom easier to use over time. A wet room needs the floor tanked, the gradient formed correctly to the drain, and reliable extraction to manage humidity, all of which we build in from the start. We upgrade the drainage and soil connections where the original interwar pipework is undersized or in the wrong place.
Housing in Havering
Around 108,680 homes make up Havering on the valuation list; 26% are flats and 74% houses, and 5% date from before 1919, 36% from between the wars and 59% from after 1945. Semi-detached houses make up 29% of homes here, and a semi in Havering can vent its bathroom through the flank.
En-suites for shared houses and newer Havering homes
Adding en-suites so that a Havering house can be let room by room can be a planning question before it is a plumbing one. Havering's two Article 4 Directions on houses in multiple occupation were made on 3 November 2015 and came into force on 13 July 2016. Notice 1 covers the Brooklands, Romford Town, Heaton and Gooshays wards, and outside those wards a second direction means turning a flat, terraced house or semi-detached house into a house in multiple occupation needs planning permission. Settle the planning position before the bathrooms are designed, because the use, the fire separation and the number of rooms are decided together.
13% of Havering homes were built in 2000 or later, and a new bathroom in one of those meets a different floor. Upstairs joists in newer houses may be engineered timber joists with a thin web, which can be drilled only in the zones the manufacturer allows and never notched. Others are metal web joists, whose open webs let a pipe pass through but whose timber top and bottom must not be cut. A waste pipe for a new shower or basin therefore follows the routes the joist allows, or drops into a boxed route below. Find the joist type and direction before choosing where the shower tray goes, because that decides whether the waste can reach the stack at all in this Havering house.
Waterproofing and comfort across Havering
Getting a bathroom right in an older Havering home is as much about what sits behind the tiles as the tiles themselves. We tank showers and wet areas thoroughly, seal around trays and junctions, and detail the waterproofing so leaks never start. Ventilation matters just as much in these interwar houses, so we fit effective extraction to clear steam and protect the plaster and paintwork, keeping the room fresh and free of damp.
Underfloor heating under tiled or stone floors takes the chill off a north-facing Havering bathroom and frees up wall space by removing the radiator. We can pair it with heated towel rails, thermostatic showers and quality brassware to suit your budget. New circuits and changes around the bath or shower are notifiable under Building Regulations, so the wiring, extraction and any electric underfloor heating are installed correctly and the electrics certified under Part P by a registered electrician. From a family bathroom in RM1 to an en-suite in RM14, we finish the whole room to a high standard.
- Wall and floor tiling in stone, porcelain or mosaic
- Downstairs cloakroom and WC installation
- Freestanding and built-in bath installation
VOA Council Tax stock of properties, March 2025, for all 30 statistical areas in Havering. Counts rounded by the VOA.
Why Choose GS Renovation in Havering
Havering homeowners choose GS Renovation for bathrooms because we treat waterproofing, drainage and ventilation as seriously as the finish. In the borough's interwar semis, getting the tanking and extraction right protects the timber floors and plaster for years. With our founder's 30+ years on the tools, one team handles the plumbing, notifiable electrics, tiling and heating to a lasting standard.
Excellent service. George's knowledge and skills are the best in the market. He knows what he is doing, does really high quality work, gives good…
My husband and I are extremely pleased with the work. The standard of the work is outstanding and Saiid has a great eye for detail and will not leave…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
FAQ
Frequently Asked Questions about Bathroom Renovation Havering
How accurate is a bathroom renovation quote for a Havering house?
A bathroom renovation quote for a Havering house is accurate when it is written after a survey rather than before one. GS Renovation inspects the RM1 property and prices the work, including Part F extraction to outside, and Part P certification for any new circuit, against £6,000 to £20,000 or more (indicative). The figure holds unless the specification changes or opening up the post-war suburban property reveals something hidden, and both risks are explained first.
Can you add an en-suite to my 1930s semi in Havering?
Usually, yes. In Havering's interwar semis we often create an en-suite by taking a little space from a large main bedroom or the landing, then designing a compact layout that works. We tank the wet areas, run new drainage and ventilation, and have the notifiable electrics certified under Part P by a registered electrician. The result is a neat, watertight en-suite that suits the age of the house.
How long will my only bathroom be out of use in a Havering home?
Roughly 10 to 15 working days from strip-out to handover. Early on, the toilet can usually go back on each evening, but from tanking through tiling the room is closed. A ground floor cloakroom makes this bearable in a Havering semi; without one, some households arrange a few nights with relatives while the tiler is in.
Can the floor in my Havering bathroom take a cast iron or stone bath?
Not always as built. Cast iron or stone, full of water and a bather, concentrates serious weight on four feet, and 1930s joists were sized for a pressed steel tub before decades of plumbers notched them. Joist depth, span and direction get checked first. Doubling up joists, or turning the bath so its feet land across several of them, is the usual fix.
Does electric underfloor heating in a Havering bathroom need a new circuit?
Usually yes. A new circuit from the consumer unit is notifiable under Part P, as are changes to circuits around the bath or shower, so a registered electrician installs and certifies it. The board must have spare capacity and suitable protection. The heating mat is laid before tiling, and its thermostat sensor is placed so it can be replaced without lifting the floor.
Can I swap the bath for a walk-in shower in my Havering bathroom?
Usually, with the waste as the deciding detail. A shower tray drains more slowly than a bath and needs its trap below it, so on a timber floor the joists may have to be notched or the tray raised. Falls are set before the tray goes down, and the walls are tanked before tiling. Tray position depends on the soil pipe route.
Who inspects a Havering bathroom that moves the soil pipe?
Building control, because a new or altered soil connection is drainage work under the building regulations. Havering Council runs its own building control service, carried out by a team of experienced surveyors, and the new pipework should be inspected before it is boxed in. Electrical work near the bath or shower is certified separately by a registered electrician. Keep both sets of paperwork together, since a buyer's solicitor will ask for them when you sell.
What limits moving the bathroom in one of Havering's flats?
The soil stack and the flat below. 26% of Havering homes are flats, and in a flat the WC has to reach a stack shared with the rest of the building, with a fall that works over the length of the run. Moving the WC across the room can make that impossible without raising the floor. The lease may also restrict new pipe runs through the floor void, so read it before choosing a layout.
Does a second bathroom in a Havering semi need the same notice as a building job?
Only when it involves notifiable work. A second bathroom that adds a new drain connection or alters structure goes to building control, and Havering asks for a building notice application at least 48 hours before work starts. The extract fan the new room needs is checked at the same time. Plan the notice around the date the new soil connection is made, not the date the tiler arrives.
Every Service, One Team
More GS Renovation Services in Havering
One team for every GS Renovation service in Havering:
Same Service, Nearby Areas
Bathroom Renovation Near Havering
We carry out bathroom renovation across Havering and the surrounding areas. Explore a nearby location:
Ready to Start Your Havering Project?
Free, no-obligation quote for bathroom renovation in Havering.