RSJ and Steel Beam Installation Eltham
Steel beam and RSJ installation in Eltham, designed by the engineer we appoint and signed off by building control.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £1,500 to £4,000
- Free site survey, itemised quote
GS Renovation installs RSJs and steel beams across Eltham, from the 1930s semi-detached houses off the main SE9 roads to the wider interwar homes near Eltham Park and Avery Hill. We open up load-bearing walls safely, sizing every beam through a structural engineer and clearing the work with building control.
In Eltham, a steel beam for one opening typically costs £1,500 to £4,000 fitted and signed off, or £2,500 to £6,500 or more for a full knock-through with the engineer's fee and making good (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Eltham.
Price guide
| Work | Indicative London range |
|---|---|
| Steel beam, one opening: supply, install, sign-off | £1,500 to £4,000 |
| Full knock-through with engineer and making good | £2,500 to £6,500+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: RSJ & Load-Bearing Walls.
How the job runs
- Free site survey at your Eltham address and an itemised quote.
- The engineer we appoint sizes the beam, and the work is registered with the Royal Borough of Greenwich building control or an approved inspector. On a shared wall you serve the party wall notice as building owner; we supply the drawings.
- Props go in, the opening is cut and the beam is set on padstones, packed tight above.
- Building control inspects the steel before it is covered. We make good, and the completion certificate follows.

Steel beams for Eltham interwar semis
The typical Eltham job removes the wall between the front and back reception rooms of a 1930s semi, creating one long, bright living space. That dividing wall almost always carries load from the floor and roof above, so we install a steel beam sized by a structural engineer rather than guessing. The beam bears onto concrete padstones at each end, spreading the weight down through the existing brickwork of the house.
Before any brick comes down, we set up temporary propping to hold the structure, then carry out staged demolition so nothing shifts unexpectedly. Working in an interwar suburban home on a generous SE9 plot gives us room to handle steel and materials without churning up the whole street. Every stage is inspected, and the finished opening is signed off by building control for your records.
Housing in Eltham
Eltham's housing, as the Council Tax list records it, is about 14,360 homes: 73% houses, 27% flats, with 17% pre-1919, 52% interwar and 30% built since 1945. Semi-detached houses make up 35% of homes here, and a beam bearing on the shared wall of a semi in Eltham means one party wall notice.
Timing the steel and the bearing inspection in Eltham
Royal Greenwich building control needs two days notice before any work under a building notice starts, and each site inspection has to be booked at least 2 working days before it happens. On an Eltham RSJ job those two rules set the order of the week. The notice goes in before the first prop is stood up, and the bearing inspection is booked on the day the steel delivery is confirmed, not on the day the beam is already up. Book it late and the opening sits propped and half finished, ends exposed, while the household steps round the props for longer than it needs to.
The bearings are what the inspector has come to see, and in a 1930s semi one of them can land in the wall shared with next door. We leave both ends open, with the packing visible and photographed, until that visit is over, and only then does the casing go on. If the inspector asks for a change, such as a longer bearing or different packing under the steel, it is a morning's work while the beam is bare. Once the steel is boarded and skimmed in an Eltham front room, the same request means cutting the finish back out and redecorating.
Party wall steelwork in shared Eltham houses
Many Eltham semis share a party wall with the neighbouring property, and chimney breasts and dividing walls often sit within it. When a steel beam bears onto or cuts into that shared wall, the Party Wall Act applies, and you must serve notice on the adjoining owner before work starts (or your surveyor does). We flag this at the survey stage so there are no surprises and the paperwork is in place well ahead of the build.
Removing a chimney breast on the ground floor to widen a room is common in these houses, but the stack above still needs supporting, usually on a steel beam, or gallows brackets where the engineer and building control accept them. We work with the structural engineer to specify the right solution for your SE9 property, prop safely during the works, and leave the opening ready for plastering and finishing throughout.
Checking the loft before touching the wall
The loft answers questions you cannot answer from downstairs. In an Eltham 1930s semi the roof is usually a cut timber structure with purlins carrying the rafters, and those purlins are often propped by struts that come down onto an internal wall. If that wall is the one you want out, the new beam is not simply carrying a floor, it is carrying part of the roof as well, and the load is significantly higher.
We also check whether the water tank sits over the wall line, whether the ceiling joists run the way we expect, and whether anything was altered when a previous owner boarded the loft out. All of it goes to the structural engineer with the survey, because a beam sized for a floor load and then asked to carry roof struts is the sort of error that shows up as a sagging ridge years afterwards. Ten minutes with a torch in the roof space at survey stage prevents that entirely.
- Lintel and catnic support to smaller openings
- Temporary propping and staged, controlled demolition
- Structural engineer's calculations arranged and followed
VOA Council Tax stock of properties, March 2025, for all 5 statistical areas in Eltham. Counts rounded by the VOA.
Why Eltham Homeowners Choose GS Renovation
Eltham homeowners choose GS Renovation because we treat steelwork as structural engineering, not guesswork. We coordinate the engineer's calculations, padstones, propping and building control sign-off, and give you the drawings for the party wall notice where the beam meets a shared wall. With our founder's 30+ years on the tools, we open up your home safely and leave it ready to finish.
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
FAQ
Frequently Asked Questions about RSJ and Steel Beam Installation Eltham
Which parts of an RSJ and steel beam installation project in Eltham cost the most?
Labour and the making good usually cost the most on an RSJ and steel beam installation project in Eltham, within £1,500 to £4,000 for one beam opening (indicative). The days on site at SE9 depend on access, condition and how many trades must follow each other: the steel is delivered and checked before the wall is opened. GS Renovation sequences them to avoid idle time, which is the practical way to control cost.
Do I need a party wall notice to fit a steel beam in my Eltham semi?
Usually yes. Most Eltham semis share a party wall with next door, and if the steel beam bears onto or cuts into that wall, the Party Wall Act requires you to serve notice on the adjoining owner first. We identify this at survey, arrange the structural engineer's design and building control sign-off, and make sure the programme allows for the notice you serve before any work begins.
How does the steel get into an Eltham semi for installation?
Usually through the front door or down the side access, which the generous plots here tend to have. A beam for a front-to-back opening is long and heavy, so the route is measured at survey: the turn from porch to hall, radiator positions, the stair newel. Where it will not pass in one length, the engineer can design a beam in bolted sections that are joined in the room.
Does a steel beam in an Eltham house need to be boxed in?
In almost every case, yes, and not just for looks. Building control will expect the steel protected against fire, which normally means casing it in fire-rated plasterboard before skimming, or a specified intumescent coating where you want the steel showing. The timing matters: the casing goes on only after the inspector has seen the beam seated on its padstones, because the bearings cannot be checked once hidden.
When does building control inspect an RSJ going into an Eltham home?
At the point the beam is sitting on its padstones with the ends still visible, before any casing or plaster. The Royal Borough of Greenwich inspector, or a registered building control approver, checks the bearing lengths, the packing and that the section matches the engineer's calculations. A final visit then leads to the completion certificate, which is the record you will need when the Eltham house is eventually sold.
Could a timber or flitch beam be used instead of steel in an Eltham semi?
For a short opening carrying nothing but a floor, a flitch beam is sometimes enough: two timbers sandwiching a bolted steel plate. Once roof struts or a chimney stack bear on the line, as they often do in a 1930s Eltham semi, steel is generally the practical choice because the loads rise sharply. The engineer decides from the calculations, not from preference.
Which Royal Greenwich charge line covers an RSJ over a new rear opening in Eltham?
New domestic door or window openings have their own line in the Royal Greenwich building control charges, separate from the line for a domestic through room. A beam over a rear window widened for garden doors belongs on the first. A beam replacing the wall between two reception rooms belongs on the second. Where one Eltham job does both, describe both when the notice is made, so the charge and the inspections match what is actually being built.
Does fitting an RSJ inside a house in the Eltham Palace Conservation Area need planning permission?
Not for the steel itself, which is internal work under the Building Regulations, unless the house is listed, when listed building consent covers inside work too. Eltham Palace Conservation Area was designated in 1971 and its character appraisal was adopted in January 2008, and the designation bears on the outside of the house. Where the beam forms a wider rear opening for new doors, check the council's list of 23 conservation areas, which marks those under Article 4 directions, before the doors are ordered.
Who sends Royal Greenwich the completion notice once an Eltham RSJ is in?
Royal Greenwich says a completion notice must be sent within five days of completing the work, and that the client, agent or builder can send it. On an Eltham beam job we agree at the start which of us is sending it, so it does not fall between two people. That notice leads to the completion certificate, and a sound beam with no certificate behind it becomes a question for a buyer's surveyor years later.
Every Service, One Team
More GS Renovation Services in Eltham
One team for every GS Renovation service in Eltham:
Same Service, Nearby Areas
RSJ and Steel Beam Installation Near Eltham
We carry out RSJ and steel beam installation across Eltham and the surrounding areas. Explore a nearby location:
Ready to Start Your Eltham Project?
Free, no-obligation quote for RSJ and steel beam installation in Eltham.