HMO conversion in Eltham is controlled at both ends, by planning and by licensing. Royal Greenwich's Article 4 direction needs planning permission to convert a house into an HMO across the whole borough, and it has been in force since 27 September 2018. Every HMO in the borough must also be licensed. For a landlord turning an Eltham family house into a shared house, or upgrading an existing one to licence standard, we build the rooms, bathrooms, kitchen and fire protection to the consent and the licence conditions.
In Eltham, a light HMO conversion for four to six tenants typically costs £40,000 to £75,000 in construction, or £90,000 to £150,000 with an en-suite to every bedroom (indicative London ranges, Mayfair Studio and LetCompliance, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Eltham: we build the fire doors, detection, bathrooms and kitchens to the council's HMO standards, the landlord applies for the licence, and a registered electrician certifies the electrics.
Price guide
| Work | Indicative range |
|---|---|
| Light HMO conversion, London, 4 to 6 tenants, construction only (Mayfair Studio) | £40,000 to £75,000 |
| Full HMO conversion with en-suites, London, 5 to 6 beds (Mayfair Studio) | £90,000 to £150,000 |
| 5-bed HMO conversion, London and South East (LetCompliance) | £35,000 to £60,000 |
| Fire safety works, typical 5-bed HMO, UK guide (LetCompliance) | £5,000 to £9,500 |
| En-suite added to one bedroom, London (Mayfair Studio) | £3,500 to £8,000 per room |
| Second shared bathroom, UK guide (LetCompliance) | £4,000 to £9,000 |
Indicative ranges from published cost guides (Mayfair Studio and LetCompliance, 2026), not a quotation. Each row names its source and whether it is a London, UK or England-wide figure. Prices checked September 2026.
Quick estimate from published guides
Guide range: choose above

Planning permission for any new HMO in Eltham
In Eltham, a new HMO needs planning permission whatever its size. Nationally, Class L of the General Permitted Development Order 2015 lets a C3 dwellinghouse become a C4 house in multiple occupation without an application. Royal Greenwich's borough-wide Article 4 direction, in force since 27 September 2018, removes that right, and the council says any new HMO for 3 or more unrelated adults needs planning permission. So the planning application comes first, before layouts are fixed or rooms are advertised.
The size of the house then decides the kind of application. The London Plan defines HMOs for three to six people as Use Class C4 and HMOs for more than six people as Sui Generis, so a large Eltham semi planned for seven or more tenants is a different use again. Your planning agent or designer prepares the application and deals with the council. We cost the build from the proposed layout early, so you know whether the scheme works before the fees are spent.
Housing in Eltham
Around 14,360 homes make up Eltham on the valuation list; 27% are flats and 73% houses, and 17% date from before 1919, 52% from between the wars and 30% from after 1945.
HMO licensing across Eltham and Royal Greenwich
Every HMO in Eltham needs a licence, however small. Royal Greenwich runs both mandatory and additional HMO licensing across the whole borough. Mandatory licensing applies where 5 or more people from 2 or more households share facilities, which matches the GOV.UK definition of a large HMO. Additional licensing covers HMOs where 3 or 4 people from 2 or more households share. There is no size of shared house in the borough that falls outside both schemes.
The mandatory scheme stops short of flats in purpose-built blocks of three or more self-contained flats, which only an additional licensing scheme can catch.
The landlord applies for the licence, not the builder, and the conditions that come with it set the standard the building work has to meet. GOV.UK says renting out an unlicensed HMO can lead to an unlimited fine. So we read the Royal Greenwich HMO standards alongside the planning drawings from the first visit to the Eltham house. We then build the rooms, amenities and fire protection to them, so the property is ready for the licence inspection when the work ends.
Room sizes, ceilings and bathrooms in an Eltham HMO
Royal Greenwich's HMO standards shape the layout of an Eltham shared house room by room. No room with a floor area under 4.64 square metres may be used as sleeping accommodation, and each room should have a ceiling height of at least 2.1m over at least half of its floor area, with floor below 1.5m headroom discounted. The national minimum bedroom sizes that are mandatory licence conditions sit on top of that, so the smallest figure is a floor, not a target.
The amenities follow the number of occupants. Royal Greenwich's standards require each bath or shower room to contain a wash hand basin, and set the minimum acceptable bath size at 1700mm by 700mm. Where a scheme includes self-contained units with their own kitchen and bathroom, Royal Greenwich treats them as self-contained accommodation that must meet London Plan Policy D6 space standards. A studio inside an HMO scheme is therefore measured as a flat, which changes how many fit on each floor of the Eltham house.
Fire safety, sound and energy in an Eltham shared house
Fire protection drives the layout and specification of an Eltham HMO conversion. A shared house needs a protected escape route from every bedroom to the front door, which usually means fire doors with self-closers on each letting room and the kitchen, fire-resisting linings to the stair enclosure, and interlinked smoke and heat detection. The LACORS housing fire safety guidance is the recognised guide to the standard, and the building regulations Part B apply to the building work. We build and commission the system to the approved design.
Sound and energy come next. Tenants in separate households live on the other side of partition walls and floors, so new stud walls between letting rooms get acoustic insulation, and the floors over bedrooms are packed before ceilings close. An HMO is a private let, and since 1 April 2020 landlords cannot let or continue to let properties covered by the MEES Regulations below an EPC rating of E without a valid exemption. Insulation and heating controls in an interwar Eltham semi are chosen with that rating in view.
- En-suite shower rooms added to bedrooms
- Hot water sized for several sharers showering at once, with any gas work by a Gas Safe registered engineer
- Thumb-turn bedroom locks that open from inside without a key
VOA Council Tax stock of properties, March 2025, for all 5 statistical areas in Eltham. Counts rounded by the VOA.
Working With GS Renovation in Eltham
An HMO conversion is judged twice: by planning and by the licence inspection. We build to the approved planning drawings and the Royal Greenwich HMO standards together, setting out rooms, bathrooms and the kitchen to the licence numbers and installing the fire doors, detection and escape route in the right order. A registered electrician certifies the installation and the alarm, a Gas Safe Register engineer does the gas work, and you receive the certificates your licence application for the Eltham house needs.
- Materials priced at options, so you choose the finish
- EPC upgrades done while the walls and floors are still open
- Every bedroom measured against the national minimum room sizes
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about HMO Conversions Eltham
Why do HMO conversion quotes in Eltham vary?
Because they rarely build to the same standard. One includes fire doors, interlinked detection, and bathrooms and a kitchen sized to the council's amenity standards; another prices a lower specification that may fail inspection. The published figure of £40,000 to £75,000 for a light conversion (Mayfair Studio, 2026) is a starting point. Compare Eltham quotes against the licence standards.
Can an Eltham house be let to three sharers without planning permission?
No. Royal Greenwich says any new HMO for 3 or more unrelated adults needs planning permission, and its Article 4 direction, in force across the whole borough since 27 September 2018, removes the national right to convert a house into an HMO. The planning application is made by you or your agent before the work and the letting begin.
Is an Eltham HMO for seven or more tenants treated differently?
Yes. The London Plan glossary defines HMOs for three to six people as Use Class C4 and HMOs for more than six people as Sui Generis. A large house with seven or more tenants is therefore a sui generis use needing its own planning application, and it will also need a mandatory licence and larger kitchen and bathroom provision.
Does a small HMO in Eltham with three tenants need a licence?
Yes. Additional HMO licensing in Royal Greenwich covers HMOs where 3 or 4 people from 2 or more households share facilities, and mandatory licensing covers 5 or more, so all HMOs in the borough must be licensed. The landlord applies, and the property has to meet the licence conditions when it is inspected.
What is the smallest bedroom allowed in an Eltham HMO?
Under Royal Greenwich's HMO standards no room under 4.64 square metres may be used for sleeping, and national mandatory licence conditions set larger minimum sizes for rooms slept in by one or two adults. Ceiling height also counts: the standards expect 2.1m over at least half of the room. We set out partitions to the approved figures before any stud goes up.
What bathroom standards apply to a shared house in Royal Greenwich?
Royal Greenwich's HMO standards require each bath or shower room to also contain a wash hand basin, and set the minimum acceptable bath size at 1700mm by 700mm. The number of bathrooms and WCs follows the number of occupants in the licence conditions, so the layout is fixed once the tenant numbers are agreed.
Can one Eltham house become two separate HMOs under Class L?
No. Class L does not permit the use of a building previously used as a single C3 dwellinghouse as two or more separate C4 HMOs. In Royal Greenwich the borough-wide Article 4 direction removes the Class L route anyway, so any HMO scheme, single or divided, goes through a planning application.
Does the London Plan protect existing HMOs?
It supports them. London Plan Policy H9 says boroughs should take account of the role of HMOs in meeting housing needs, and that HMOs of a reasonable standard should generally be protected. For an existing Eltham HMO, the building work is then about meeting the licence standards, which is usually simpler than a new conversion.
Do you apply for the HMO licence on the landlord's behalf?
No. The landlord, or their managing or licensing agent, applies for the licence and deals with the council. Our part is the building work: rooms, bathrooms, kitchen, fire doors, detection and escape routes built to the licence standards and the planning consent, with the electrical and alarm certificates handed over for the application.
Every Service, One Team
More GS Renovation Services in Eltham
One team for every GS Renovation service in Eltham:
Same Service, Nearby Areas
HMO Conversions Near Eltham
We carry out hmo conversions across Eltham and the surrounding areas. Explore a nearby location:
Ready to Start Your Eltham Project?
Free, no-obligation quote for hmo conversions in Eltham.