House Refurbishment Eltham

Whole-house refurbishments in Eltham, every floor of the house renewed from the roof down, in the right order.

House refurbishment in Eltham is mainly a question of age. Houses make up 73% of homes here, and 52% of all homes were built between 1919 and 1939. So a common brief is an interwar semi or terrace whose wiring, heating, plaster and windows are due for renewal while the plan stays as it is. We strip out, renew the services and finish the house in order, whether you live in it, let it as a whole house or are preparing it for sale.

For Eltham, published UK figures put a three-bed house refurbishment at £43,530 to £110,350, and London houses usually cost more, with a London architect allowing £1,800 to £2,200 per square metre before VAT (Checkatrade and Bradley Van Der Straeten Architects, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Eltham: we renew the wiring, pipework, heating, plaster, floors and joinery of the whole house under one contract, and a registered electrician certifies the rewire.

Price guide

WorkIndicative range
Three-bed house refurbishment, UK average£43,530 to £110,350
Non-structural house refurbishment in London, per square metre, excluding VAT£1,800 to £2,200 per square metre
Full rewire, two-bed to five-bed house£4,500 to £10,500
New heating system, three-bed house£3,000 to £8,500
Re-skim walls and ceilings, three-bed house£5,000 to £12,500

Indicative ranges from published cost guides (Checkatrade, Bradley Van Der Straeten Architects and MyJobQuote, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026. Full breakdown: House Rewire Cost.

Quick estimate from UK guide figures

Guide range: choose above

A ground floor room refurbished by GS Renovation, freshly plastered, with engineered oak boards being laid
The plaster finished and dry before the new boards go down, with an expansion gap left at every wall.

What an interwar Eltham house needs when it is renewed

An interwar Eltham house needs its services renewed before anything else. In Eltham, 52% of homes date from 1919 to 1939, and the local character is 1930s semis and Arts and Crafts estate cottages. Houses of that age were built with suspended timber ground floors, brick walls and plaster that is now nearly a century old. The rewire and heating installed in a later decade are often at the end of their life too, and the joists under the bathroom may have been notched for pipes more than once.

So the programme follows a fixed order. First the strip-out, which exposes floors, ceilings and pipe runs. Then first fix: the rewire by a registered electrician who certifies it, new heating pipework, and a boiler fitted by a gas engineer on the Gas Safe Register. Plastering follows, then second fix of sockets, radiators and joinery, and finally decoration. Floorboards lifted for cables are refixed with screws so they can come up again, and any joists found weakened are repaired before the ceilings below are boarded.

Housing in Eltham

The Council Tax list puts Eltham at about 14,360 homes, 27% flats against 73% houses; 17% went up before 1919, 52% between the wars and 30% after 1945. A semi in Eltham has a single party wall, so one neighbour hears the chasing, and 35% of homes here are semi-detached.

Pre-1919 lime and post-war fabric in Eltham houses

The 17% of Eltham homes built before 1919 need a gentler approach than the interwar stock. Their walls are often solid brick laid in lime mortar, with lime plaster on lath inside, and they rely on moisture escaping through the wall. Patching them with cement render or dense gypsum traps that moisture and brings damp back within a few winters. Where plaster has lost its key we replaster in lime, and original sash windows are overhauled with new cords, beads and draught strips before replacement is considered.

At the other end, 30% of Eltham homes were built after 1945, and post-war houses bring different fabric: concrete ground floors, early cavity walls and sometimes asbestos in textured ceilings, floor tiles or boiler cupboards. Those materials are tested before anything is drilled or stripped. With 32% of homes terraced and 39% semi-detached or detached, we also plan how materials come in and waste goes out, since a mid-terrace house has no side access and everything passes through the hall.

Windows, doors and roofs on protected Eltham streets

In Eltham, a protected street changes what a refurbishment can do to the outside of a house. Royal Greenwich has 23 conservation areas, among them the Eltham Palace Conservation Area, designated in 1971, and the Eltham Green Conservation Area, designated in 1975. The council's list marks which conservation areas are under Article 4 directions, and it says there is less permitted development in those areas, so planning permission may be needed for most works. Replacing windows, a front door or roof covering on a house there is checked before anything is ordered.

The Arts and Crafts cottages of the Progress Estate by Well Hall carry their own control: the estate was granted Article 4 Direction status by the Department of the Environment in 1973. On a refurbishment there, windows and doors are usually repaired or matched rather than swapped for a standard modern product, and your designer confirms with Royal Greenwich what needs consent. Royal Greenwich also keeps a local heritage list of over 500 buildings of local architectural or historic interest, so check whether your house is on it before changing its front.

Working hours, scaffolds and skips outside an Eltham house

A house refurbishment in Eltham runs to Royal Greenwich's hours for noisy work: usually 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays, with none on Sundays and bank holidays. Environmental Health has special powers over building noise under the Control of Pollution Act 1974. In a semi, the neighbour hears the drilling and chasing through the party wall, so we group the loud work, such as chasing, breaking out old screed and removing plaster, into the first weeks and tell next door what is coming.

Outside the house, the paperwork depends on where things stand. A skip on your own drive or front garden needs no licence from Royal Greenwich, which suits an Eltham semi with a front drive. For a skip in the road, an approved skip company applies for the licence, which is usually valid for 30 days. Scaffolding over the pavement for gutter, chimney-stack or roof repairs needs a scaffolding licence charged by the month, so roof and stack work is programmed early and the scaffold is struck as soon as it is done.

  • Lime plastering on solid walls and lath and plaster ceiling repairs
  • Hack-off and replaster, or a skim over sound plaster
  • Pre-sale and probate refurbishments of empty houses
Service areaEltham · SE9
Local authorityThe Royal Borough of Greenwich
Part ofSouth East London (Inner London)
Typical homes1930s semis and Arts and Crafts estate cottages
Housing stock17% built before 1919, 52% interwar, 30% post-war; 27% flats, 32% terraced, 39% semi-detached or detached, 2% bungalows
Also covered nearbySidcup, Chislehurst, Charlton, Welling and Woolwich

VOA Council Tax stock of properties, March 2025, for all 5 statistical areas in Eltham. Counts rounded by the VOA.

Why Choose GS Renovation in Eltham

A house refurbishment involves many trades working through one building, and time is lost in the gaps between them. We run the strip-out, first fix, plastering, second fix and decoration in sequence under one site lead, so each room is ready when the next trade arrives. The registered electrician certifies the rewire, a gas engineer on the Gas Safe Register does the gas work, and at the end you have the certificates and a record of what was found behind the walls of your Eltham house.

  • Neighbours given notice before the noisy stages
  • Radiators, sockets and switches positioned at first fix, never after decorating
  • Every wall of the house tapped and every circuit tested before the refurbishment is priced
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
★★★★★
We loved working with George and Ibrahim and would highly recommend them. They have done splendid job on our new kitchen refurb which including new…
kath833Wood Green, London · via MyBuilder
★★★★★
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Adil KhanWoolwich, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about House Refurbishment Eltham

How much does a house refurbishment cost in Eltham?

Published UK figures put a three-bed house refurbishment at £43,530 to £110,350 (Checkatrade, 2026), and London houses usually cost more: a London architect allows £1,800 to £2,200 per square metre before VAT (Bradley Van Der Straeten Architects, 2026). For a Eltham house the survey decides where the job sits, from the wiring and pipework to the plaster, damp and roof. Each trade is then priced as its own line.

Is a building notice enough to refurbish an Eltham semi?

Often yes, for the simple notifiable parts. Royal Greenwich building control says a building notice should only be used for simple work, such as a through room, chimney removal or drainage alteration, and it needs two days notice before that work starts. A rewire and a new boiler are notified separately by the registered electrician and the Gas Safe engineer who do them.

How far ahead are building control inspections booked on an Eltham house?

At least 2 working days before each visit, which is what Royal Greenwich building control asks. We book as the work approaches a stage the inspector needs to see open, such as a new lintel or altered drainage, so the plasterer does not close up anything that has not yet been inspected.

Can new windows go into a Progress Estate cottage in Eltham?

Only after checking what consent is needed. The Progress Estate was granted Article 4 Direction status in 1973, and Royal Greenwich says there is less permitted development in Article 4 areas, so planning permission may be needed for most works. Repairing the existing windows or matching them closely is the safer brief, and your designer confirms the position before anything is ordered.

Does a tree outside an Eltham house affect scaffolding in a conservation area?

Yes, if branches need cutting back to fit the scaffold. In Royal Greenwich conservation areas you must give six weeks written notice for work to, or felling of, trees more than 75mm in diameter. We raise it at the survey visit so the notice runs before the scaffold is booked rather than holding up the start.

Should sash windows in an older Eltham house be repaired or replaced?

Repair comes first where the frames are sound. 17% of Eltham homes were built before 1919, and where their original sashes survive they can usually be overhauled with new cords, parting beads, draught seals and fresh putty. Where a sash has rotted beyond splicing, a matching replacement is made. Secondary glazing is an option where you want warmth without changing the front of the house.

Can we stay in our Eltham house during the refurbishment?

Yes, with phasing. We work on one part of the house at a time, seal it off, and keep a working bathroom and a basic kitchen available. Power and water go off only for short, planned spells during the rewire and the heating changeover. A lived-in job takes longer than an empty one, and the programme shows each phase before we start.

Does replastering or re-roofing a house bring in insulation rules?

Often it does. When a whole external wall is replastered or a roof covering is renewed, Part L of the building regulations generally expects that element to be brought up to a better insulation standard where that is practical. On a solid-walled older house the choice of insulation matters, because it has to let the wall breathe, so we settle the build-up before the old plaster comes off.

What should executors refurbish before selling a house?

Start with the defects a buyer's surveyor will flag. Old wiring, a failing boiler, damp and roof leaks affect mortgage valuations, while decoration and flooring affect how the house shows. We walk the house with you or the solicitor, price the essential repairs and the cosmetic work separately, and give a programme so you can decide whether to refurbish or sell as it stands.

Same Service, Nearby Areas

House Refurbishment Near Eltham

We carry out house refurbishment across Eltham and the surrounding areas. Explore a nearby location:

Ready to Start Your Eltham Project?

Free, no-obligation quote for house refurbishment in Eltham.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote