Every trade under one contract across East Barnet and EN4. Structural work, extensions, kitchens and bathrooms, building control handled for you.
East Barnet mixes interwar semis with older terraces, and your useful space is nearly always at the back. Houses around Oak Hill Park and East Barnet Village tend to have generous rooms at the front and a cramped kitchen behind, with a garden that is long enough to give something up. The structure behind the plaster differs between the two stocks, so the survey comes before the design rather than after it. We appoint the structural engineer and coordinate the Barnet Council building control application and inspections.
In most East Barnet houses the answer is a rear extension, sometimes with a side infill where the plot has a gap to one boundary. That adds usable floor area where the plan is weakest without consuming the whole garden, and it puts the kitchen alongside the outside space instead of looking away from it.
How far out you build is settled by daylight rather than by the maximum footprint. Extending deeply pushes the original rear rooms further from any window, and the space in the middle can become a corridor. Rooflights over the junction between old and new are usually what stops that.
The relationship between the internal floor and the garden governs more than people expect. Where the ground outside sits higher than the floor inside, the threshold detail, the damp proof course and where surface water goes all have to be designed rather than discovered. Levels are surveyed before the foundations are set out.
Rainwater from a new roof has to reach a surface water drain or a soakaway sized for the volume and positioned far enough from the building that it does not saturate the new foundations. Connecting it into a foul drain is not acceptable. Where a shared drain crosses the site, the water authority's agreement comes before anything is built over it.
A rear extension is largely built outside the existing walls, so the house stays usable until the point where the two are joined and the back wall comes out. That stage is the disruptive one, and it is kept short by having everything prepared before the opening is formed.
The kitchen is the exception, because it is usually out of use for weeks rather than days. Where you cook and wash during that period is worth settling at the outset. Screens, protected routes and daily clearing make the rest of the programme workable with the family in place.
Every Service, One Team
One accountable team for every trade in East Barnet. Choose the work you need:
RSJ and Steel Beam Installation in East Barnet: steel beam installation, RSJ and structural alterations.
Load-Bearing Wall Removal in East Barnet: safe load-bearing wall removal with steel beam support.
Structural Alterations in East Barnet: structural alterations, new openings and steel support.
Chimney Breast Removal in East Barnet: chimney breast removal with gallows bracket or beam support.
Open-Plan Conversions in East Barnet: open-plan kitchen, diner and living conversions.
House Extensions in East Barnet: single and double storey extensions.
Home Renovation in East Barnet: full refurbishments and whole-house renovations.
Kitchen Renovation in East Barnet: bespoke kitchen design and installation.
Bathroom Renovation in East Barnet: luxury bathroom and wet-room refurbishment.
Nearby
FAQ
Not always. Some single storey rear extensions on houses fall within permitted development, subject to limits on depth, height and materials, while side and wraparound designs commonly exceed them. Flats have no permitted development rights. Building regulations approval applies in every case, and which route applies is established at survey before a design is priced.
Deeper than most owners expect, and the engineer sets the depth from the ground rather than from a standard detail. Where the soil is clay, foundations are taken below the level at which seasonal moisture change moves the ground, and nearby trees push that further. The inspector sees the open trench before any concrete is poured.
It is dealt with rather than built over blind. The options are diverting the run, relocating the chamber outside the new footprint, or building over it with sealed covers and access retained. Where the drain is shared, the water authority's agreement is required alongside building control. A camera survey before the foundations are set out establishes which applies.
That is decided at the outset rather than left to the bricklayer. The choice is between matching the existing brick or render as closely as the available materials allow, or a deliberate contrast in a modern material. A near miss reads worse than an honest difference, and where permission is needed the materials usually form part of what is approved.
George did a great job on our new bathroom. He is a really friendly and helpful guy and always ready to discuss any issues or concerns and come up with a sensible solution. Best of all, he works to budget and does not try and find…
George was a great find. The job required re-plastering the walls before fitting acrylic panels. He also re-plumbed the shower waste under the solid floor and then re-tiled the bathroom floor. He had to build a timber frame for a new…
George is a very hard working builder, and has done a fantastic job on replacing my Bathroom. His attention to detail was great and I wouldn't hesitate to recommend him to my friends and family. I will always keep his details handy and…
Free, no-obligation quote for any renovation work in East Barnet. Rated 4.9 from 31 reviews on MyBuilder, fully insured, and building control handled for you.