Office Fit-Out Stratford
Office fit-outs for small and medium office suites in Stratford, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Stratford serves a centre that Newham Local Plan 2018 designates as the borough's Metropolitan Centre, with catchments reaching over several boroughs. Around Stratford station and the Queen Elizabeth Olympic Park that means office floors in newer buildings, and closer to the old high street it means suites over shops and small studios. We take on the smaller jobs in that range: one floor or one suite, stripped, partitioned, lit and handed back ready for desks.
For Stratford, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Stratford: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Cat A and Cat B on a Stratford office floor
The first question on a Stratford office is which category of fit-out the landlord hands over. Cat A is the landlord's base finish: raised floor, suspended ceiling, lighting, heating and cooling, and toilets to the core. Cat B is the tenant's layer on top: partitions, meeting rooms, a tea point, glazed screens, data outlets, furniture and branding. A floor in one of the newer buildings near Stratford station often comes as Cat A, so the tenant's brief is Cat B only.
An older suite above a shop usually has neither. There we strip back to the structure, check what the ceiling void and floor will take, and build the Cat A items first, then the tenant's layout. Data cabling is run in coordination with your IT supplier, who terminates and tests it. Keeping the two categories apart on the quotation shows you what the landlord should already have provided and what your business is paying for.
Newham Building Control for office partitions, escape and lighting
An office fit-out that changes the layout or services is normally building work under the regulations, and Newham runs its own service, Newham Building Control, which covers Stratford. A new partition layout changes travel distances and escape routes, so the plans are checked against Part B for fire and means of escape, Part M for access and accessible toilets, and Part L for lighting and heating controls. Because an office falls under the fire safety order, a building notice cannot be used, so the route is full plans.
Newham Building Control decides a full plans application within five weeks of receiving it, or within two months by agreement. That period sits inside the programme, between agreeing the layout and ordering glazed screens and doors, so the approved drawings match what is built. When the work is finished, a notice of completion must reach Newham Building Control within 5 days, and we supply the electrical and fire alarm certificates that go with it.
Office stock, Class MA and Article 4 around Stratford
Class MA of the General Permitted Development Order 2015 lets a building in Class E, which includes offices, change to Class C3 homes through prior approval, where it has been in Class E use for two years and is not listed. That matters to a Stratford tenant only as background to the office stock. It is one reason office floors above shops can go to flats, why the supply of small suites shifts, and why a landlord may offer a short lease on space they are weighing up for residential use.
London Plan Policy E1 asks boroughs to use Article 4 Directions so that the CAZ, the Northern Isle of Dogs and other office clusters are not undermined by office to residential rights. Whether any such direction covers a particular Stratford building is for the landlord and their advisers to check with Newham. For the tenant, the practical question is the length and terms of the lease, which decide how much of the fit-out is worth building.
Working in an occupied Stratford building, and CDM duties
An office floor in Stratford is rarely empty around you. Newham's standard site hours are 8am to 6pm Monday to Friday and 8am to 1pm Saturday, with Sundays and bank holidays closed, and a building with other tenants usually sets tighter rules for noisy work. Noisy work such as core drilling or strip-out outside those hours needs Section 61 Control of Pollution Act consent, applied for at least 28 days before works start. With homes nearby it is rarely granted.
A business commissioning a fit-out is a commercial client under the CDM Regulations, and that brings duties of its own: appointing the right people, allowing enough time and resources, and providing the pre-construction information you hold, such as the landlord's asbestos survey. We explain those duties at the start. At lease end, the same survey work helps with dilapidations and reinstatement, where the lease requires the floor to go back to Cat A.
- Strip-out of the previous tenant's office, with disposal
- Glazed screens and glass-fronted meeting rooms
- Reception areas and internal joinery
VOA Council Tax stock of properties, March 2025, for Stratford East, Stratford Central, West Ham & Stratford Park and Carpenters Estate & Stratford New Town. Counts rounded by the VOA.
Trusted Office Fit-Out in Stratford
An office fit-out asks a small business to deal with a landlord, a building manager, IT and building control at once. Abdelaaziz Saaid, the founder, visits the floor himself, reads the landlord's pack and lease plan, and prices the Cat A and Cat B work separately against a written programme. You deal with one contact from strip-out to handover. A registered electrician certifies the electrics, the structural engineer we appoint checks any new loads, and your designer's drawings are what we build to.
- Full plans building control coordinated for the new office layout from the outset
- Honest updates if a date or a detail has to move
- Every new office circuit certified to BS 7671 by a registered electrician
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Stratford
Why do office fit-out quotes in Stratford vary so much?
Because the scope differs. One quote covers only partitions and ceilings; another includes fire alarm changes, lighting, data containment, the tea point and out-of-hours working. Published guides give £70 to £120 per square foot for the construction element (Oktra, 2026). Compare quotes against the same written scope.
Is there much office space in Stratford for a small business?
Stratford is the borough's Metropolitan Centre under Newham Local Plan 2018, serving catchments that can extend over several boroughs. For a small business the realistic options are a floor in a newer building near the station or the Olympic Park, or a suite above a shop. We fit out both, one floor or suite at a time.
What is the difference between Cat A and Cat B in a Stratford office?
Cat A is the landlord's base: ceilings, raised floors, lighting, heating and cooling and core toilets. Cat B is the tenant's own layout on top, such as partitions, meeting rooms, a tea point and data outlets. A floor in a newer building near Stratford station often comes as Cat A. We price them separately, so you can check which items your Stratford landlord should already have provided before you pay for them.
How long does Newham Building Control take to approve office plans?
Newham Building Control decides a full plans application within five weeks of receiving it, or within two months by agreement. For an office in Stratford that approval covers fire and escape, access and lighting. We allow the period in the programme before the glazed screens and doors are ordered, so the built layout matches the approved one.
Can a Stratford office fit-out happen in the evenings?
Quiet work can, where it is agreed. Newham's standard hours are 8am to 6pm on weekdays and 8am to 1pm on Saturday. Noisy work outside them needs Section 61 Control of Pollution Act consent, applied for at least 28 days before works start, and near homes it is rarely granted. Decoration and second fix can run later once the building manager agrees access, lifts and alarms.
Does a tenant need the landlord's permission to fit out a Stratford office?
Almost always. A lease normally requires the landlord's licence for alterations before partitions, ceilings or services change, and the landlord will want to see drawings and method statements. We provide the programme and the details they ask for. Starting without the licence risks having to remove the work and can put the lease in breach.
What duties does an office tenant in Stratford have under the CDM Regulations?
A business commissioning building work is a commercial client under the CDM Regulations. You make sure the project has suitable people, time and resources, and pass on the information you hold, such as an asbestos survey from the landlord. We set out what that means on a Stratford job at the start, so nothing holds up the work.
Could a Stratford office building be converted to flats under Class MA?
The owner may have that option. Class MA of the General Permitted Development Order 2015 lets a Class E building, including offices, change to Class C3 homes through prior approval, if it has been in Class E use for two years and is not listed. That is a landlord decision, not the tenant's. For you it bears on the lease length, and so on how much fit-out is worth doing.
What happens to a Stratford office fit-out when the lease ends?
The lease sets the reinstatement terms. Many require the tenant's partitions, cabling and kitchen to be removed and the floor returned to its original state, often Cat A, and the landlord's surveyor serves a schedule of dilapidations. We can price the strip-out and making good against that schedule, and the photographs taken at the start help settle what was there before.
Every Service, One Team
More GS Renovation Services in Stratford
One team for every GS Renovation service in Stratford:
Same Service, Nearby Areas
Office Fit-Out Near Stratford
We carry out office fit-out across Stratford and the surrounding areas. Explore a nearby location:
Ready to Start Your Stratford Project?
Free, no-obligation quote for office fit-out in Stratford.