Office Fit-Out Battersea
Office fit-outs for small and medium office suites in Battersea, partitions, ceilings, lighting and small power for your office, with the IT and specialist trades coordinated.
- Rated 4.9 from 31 reviews on MyBuilder
- UK guide: £70 to £120 per sq ft
- Free site survey, itemised quote
Office fit-out in Battersea runs from small suites to floors in newer buildings, and we describe the work plainly. Settings to expect include suites above shops near Clapham Junction station, studios in converted buildings, and floors in the developments around Battersea Power Station. Each job runs on a landlord's licence for alterations and Wandsworth building control for non-domestic work, and each starts from how finished the space is on the day you take it.
For Battersea, the construction part of an office fit-out is published at £70 to £120 per sq ft as a UK guide, and an all-in London office fit-out at £148 to £359 per sq ft (Oktra and Cushman and Wakefield, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Battersea: we build the office partitions, ceilings, lighting and finishes as one contract and coordinate the IT supplier and specialist trades around them.
Price guide
| Work | Indicative range |
|---|---|
| Office fit-out, construction only | £70 to £120 per sq ft |
| London office fit-out, all-in | £148 to £359 per sq ft |
| Metal stud partition, boarded both sides | £55 to £65 per m² |
| Suspended ceiling, grid and tile | £22 to £35 per m² |
| Dilapidations at lease end | £15 to £20 per sq ft |
Indicative ranges from published cost guides (Cushman and Wakefield, Oktra and Checkatrade, 2026), not a quotation. Most are UK-wide figures and London work usually costs more; a row marked London is a London figure. Prices checked September 2026.
Quick estimate from UK guide figures
Guide range: choose above

Where office space sits in Battersea
Office space in Battersea comes in several settings, and each needs a different fit-out. Suites over shop units near Clapham Junction station, studios in older buildings, and floors in the mixed-use schemes around Battersea Power Station are the ones to expect. An upper floor above a shop has a narrow stair, shared services and neighbours below. A floor in a newer scheme is more likely to be handed over at Cat A, so the work starts from your layout rather than from the base building.
Wandsworth has protected its office stock from conversion to housing for some years. Its Article 4 Direction removing the office (B1a) to residential (C3) permitted development right was confirmed on 26 February 2018 and came into force on 16 May 2018. The later direction removing the Class E to C3 right came into force on 29 July 2022 across 60 areas. For an office tenant this is background: where a direction covers the building, the floor you are looking at is likely to stay in office use.
Cat A and Cat B in a Battersea office
Cat A and Cat B describe how finished a Battersea office is when you take it. A Cat A space has the landlord's basic finish: raised floor or screed, suspended ceiling, lighting, heating and cooling, and working toilets, but no rooms or furniture. Cat B is the tenant's own fit-out on top of that: partitions and glazed screens, meeting rooms, a tea point or kitchenette, small power to the desks, and signage and decoration inside the office.
In the smaller Battersea suites above shops, the starting point is often below Cat A, with old ceilings, tired wiring and radiators that need renewing before any layout goes in. We price the two stages separately so you can see what is base-building work and what is your own layout. Data cabling is coordinated with your IT supplier, who specifies it; we provide the containment, floor boxes and power so their installation drops straight in.
Building control for non-domestic work in Battersea
An office fit-out in Battersea needs building control approval where it alters escape routes, fire separation, toilets or drainage, or renews fixed services such as lighting and ventilation. Wandsworth runs its own Building Control service, and applications go through the Planning Portal or by emailed form to buildingcontrol@wandsworth.gov.uk. For a full plans application Wandsworth takes 40% of the total charge on application and invoices the remaining 60% after the first site visit. A registered building control approver is the alternative route.
The approval covers fire and means of escape under Part B, access and toilets under Part M, and lighting and services efficiency under Part L. In an office, new partitions can lengthen an escape route or cut off a fire alarm sounder, so the layout is checked against the escape strategy before walls are built. As a commercial client you have duties of your own under the CDM Regulations, including allowing time and information for the work to be planned safely.
Working in occupied Battersea buildings and leaving at lease end
An office above a Battersea shop or below residential flats is rarely empty around the work. Noisy tasks such as cutting openings, breaking out floors or chasing walls are agreed with the landlord for set hours, and quieter work like decoration or ceiling grid can run later. The landlord's licence for alterations sets these limits, alongside the drawings the landlord has approved. We programme around them and keep common stairs and entrances clear for the other occupiers.
Think about the end of the lease when the fit-out starts. Office leases commonly contain a reinstatement clause, and dilapidations claims at lease end often turn on partitions, ceilings and cabling left behind. Keeping a record of what was there before, and fitting partitions that can be removed cleanly, makes that exit simpler. When a tenant is leaving a Battersea office, we can carry out the strip-out and reinstatement the landlord's schedule of dilapidations requires.
- Internal office signage and manifestation on glazed screens
- Raised access floors laid, repaired or adapted for new desk layouts
- Small power to desks, floor boxes and perimeter trunking
VOA Council Tax stock of properties, March 2025, for all 6 statistical areas in Battersea. Counts rounded by the VOA.
Working With GS Renovation in Battersea
A small office fit-out needs one contractor who can run the strip-out, partitions, ceilings, lighting, power and finishes as one programme, not a string of separate trades. We work from your designer's drawings and the landlord's licence, coordinate the IT supplier's cabling, and plan noisy work around the building's other occupiers. You have one point of contact throughout. At handover you receive the electrical certificates from the registered electrician and the building control completion paperwork for your records and the landlord's.
- Full plans building control coordinated for the new office layout from the outset
- A programme built back from the date your staff move in
- Honest updates if a date or a detail has to move
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
FAQ
Frequently Asked Questions about Office Fit-Out Battersea
What should a business budget for an office fit-out in Battersea?
Treat the UK guide of £70 to £120 per square foot for the construction work (Oktra, 2026) as a floor; London all-in figures run £148 to £359 per square foot (Cushman and Wakefield, 2026). Add the landlord's fees for the licence for alterations, any dilapidations at lease end, and your IT and furniture, which sit outside the building work. A Battersea quote follows a survey of the space.
What is the difference between Cat A and Cat B in a Battersea office?
Cat A is the landlord's basic finish, with ceilings, lighting, heating and toilets in place but no layout. Cat B is the tenant's fit-out on top: partitions, meeting rooms, tea point, desk power and decoration. In older Battersea suites the base finish often needs renewing first, which we price separately.
Does an office fit-out in Battersea need building control approval?
Yes, where it affects escape routes, fire separation, access, toilets or lighting. Wandsworth runs its own Building Control service, taking applications through the Planning Portal or by emailed form. A registered building control approver is the alternative. Get the approval route agreed before partitions are ordered, because it can change the layout.
How is Wandsworth building control paid on an office fit-out?
In two stages on a full plans application. Wandsworth takes 40% of the total charge when the application is made and invoices the remaining 60% inspection charge after the first site visit. Build both payments into the fit-out budget and programme, so the first inspection is not held up by an unpaid invoice.
Could the Battersea office building be converted to flats under permitted development?
Not where Wandsworth's Class E to C3 Article 4 Direction applies. It came into force on 29 July 2022 and covers 60 areas where commercial and business uses are concentrated, including parts of the Central Activities Zone. An earlier direction on the old office (B1a) to residential right came into force on 16 May 2018. For a tenant this is context, and the landlord or agent can confirm whether the building is covered.
What are the CDM duties for a business fitting out a Battersea office?
As a commercial client you must make suitable arrangements for managing the project, allow enough time, and provide the information the contractor needs about the building, such as any asbestos survey. We take on the contractor's duties for planning and running the site. On a project with more than one contractor, a principal designer and principal contractor are appointed.
Who needs to approve the fit-out of a Battersea office?
The landlord first, through a licence for alterations with approved drawings, then building control for the regulated work. In a newer building near Battersea Power Station the landlord will also check how your layout ties into the base-build services. An internal office fit-out does not need planning permission, though in a listed building listed building consent covers internal works too. External changes can need planning permission, and new signs can need advertisement consent.
Can you fit out an office outside normal working hours?
Yes, where the landlord and building allow. Noisy work such as drilling and cutting stays within the council's permitted hours. Outside them it needs the council's agreement, usually through a prior consent under the Control of Pollution Act, which is rarely given where homes are nearby. Quieter work such as decorating or ceiling tiles can run into evenings. We confirm the permitted hours in writing before the programme is fixed, so the move-in date depends on time that is really available.
What should a Battersea office tenant do about dilapidations at lease end?
Read the reinstatement clause before the fit-out starts, and keep a record of the space as it was taken. Partitions, ceilings and cabling left behind are the usual subjects of a claim. Demountable partitions and a clear record make the exit easier, and we can carry out the strip-out and reinstatement the landlord's schedule asks for.
Every Service, One Team
More GS Renovation Services in Battersea
One team for every GS Renovation service in Battersea:
Same Service, Nearby Areas
Office Fit-Out Near Battersea
We carry out office fit-out across Battersea and the surrounding areas. Explore a nearby location:
Ready to Start Your Battersea Project?
Free, no-obligation quote for office fit-out in Battersea.