Kitchen Renovation Deptford
Bespoke kitchen design and installation in Deptford, one team for the strip-out, the services and the fit.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £18,000 to £60,000+
- 3 to 5 weeks on site
- Free design visit, itemised quote
GS Renovation designs and fits kitchens throughout Deptford, from the post-war flats that make up most of SE8 and its warehouse conversions to the Georgian and Regency townhouses around Albury Street and Tanners Hill. We handle the cabinetry, worktops, services and any structural work as one project, creating kitchens that suit both period proportions and modern open-plan living.
In Deptford, a kitchen renovation typically costs £18,000 to £60,000 or more from design to fitting (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Deptford: we carry the strip-out, services and fit as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Kitchen renovation, design to fitting | £18,000 to £60,000+ |
| Opening up for a kitchen-diner, complete | £2,500 to £6,500+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Kitchen Renovation Cost.
Quick estimate for Deptford
Deptford range: choose above
How the job runs
- Free design visit at your Deptford home and an itemised quote.
- Strip-out and any structural work, first-fix plumbing and electrics, plastering.
- Units fitted and levelled; stone worktops templated and cut off site.
- Worktops, appliances, tiling and second fix. Electrics certified under Part P by a registered electrician, or notified to building control. Typically 3 to 5 weeks on site.

Open-plan kitchen-diners in Deptford homes
In Deptford, where most homes are post-war flats, a common kitchen project opens the kitchen to the adjoining room to make a kitchen-diner. That wall is often load-bearing, so we install a steel beam sized by a structural engineer and signed off by building control, with the freeholder's licence agreed first in a flat. Where the wall is shared with next door, the Party Wall Act applies: you serve the notice as building owner (or your surveyor does) before the opening is cut, and we give you the drawings it needs.
With the space opened up, we fit quality units, quartz, granite or composite worktops, integrated appliances and considered lighting. We route the plumbing and electrics to suit the new layout, tile the splashbacks and floors, and finish everything to a high standard. We plan around the fixed soil stack in a post-war flat, and around chimney breasts and uneven floors in the few Georgian houses, rather than forcing a standard template onto the room.
Housing in Deptford
By the valuation list's count, Deptford holds about 14,290 homes, 15% houses and 85% flats; by age, 9% were built before 1919, 4% between the wars and 84% since 1945. Where most homes are flats, a kitchen sink in a flat in Deptford has to stay within reach of the shared soil stack.
A new Deptford kitchen can mean three building control visits
A kitchen has its own line on Lewisham's building control fees chart: installation of a new kitchen, with 3 inspections. A kitchen that adds circuits, moves the sink or changes the extraction is work the inspector wants to see. For a Deptford refit that means the wiring and the new waste runs are checked while the walls are open, so the tiler and the worktop fitter follow the inspection rather than cover it. We put the kitchen on the application with the rest of the job and plan the programme around those visits.
The cooker hood can raise a planning question too. In a Deptford conservation area, a flat or a house split into flats has no permitted development rights, so Lewisham requires planning permission for changes to its exterior. Flats are 85% of Deptford's homes, and the conservation areas around Deptford High Street and St Paul's Church take in flats as well as houses. A new extract grille cut through the outside wall of one of those flats is therefore an exterior change to raise with Lewisham. Where an existing opening can be reused, the duct is routed to it. Where it cannot, the grille position is settled before the kitchen layout is fixed.
Bespoke kitchens for Deptford period proportions
Deptford's older townhouses have tall ceilings, deep alcoves and chimney breasts that rarely suit off-the-shelf units. Made-to-measure, in-frame cabinetry lets us use the full height of the room and fit the awkward corners that period walls create. In lower-ground kitchens, common in these Georgian houses, we plan the layout, lighting and ventilation carefully around the reduced head height and the limited natural light.
Whether you want a handleless contemporary finish or a classic Shaker kitchen, we build to suit the age and character of the house. Any new circuit or consumer unit change is notifiable under building regulations, so the wiring is certified by a registered electrician under Part P, or notified to building control. We manage the plumbing, tiling, worktops and appliance integration in-house, so the whole kitchen is delivered by one team and finished to a consistent standard.
Kitchens in creekside warehouse conversions
A kitchen in a Deptford warehouse conversion works to a different set of limits from one in a townhouse. The floors are often concrete or heavy timber with no void to run services in, so waste pipes have to be routed within a boxed plinth or the layout planned around the existing soil connection. Structural columns and window positions cannot move, and the exposed brick or steel is usually part of what you bought.
The lease matters as much as the fabric. Most conversions near the creek restrict drilling hours, prohibit new penetrations through the elevation and require the managing agent to approve the works and see your insurance before anything is delivered. We deal with that paperwork, plan the extraction route to an existing outlet where a new one is not permitted, and protect the shared lift and corridors on the days the units come in, which the agent will expect to see arranged.
- Old kitchen strip-out, disposal and making good
- Underfloor heating and kitchen ventilation
- Waste and water runs moved, and gas by a Gas Safe registered engineer, before the units are set
VOA Council Tax stock of properties, March 2025, for Deptford North, Silwood & Pepys and New Cross & Deptford South. Counts rounded by the VOA.
The GS Renovation Difference in Deptford
Deptford homeowners choose GS Renovation because one team handles the entire kitchen, including any steel beam or knock-through, the services and the finish. We are comfortable working in SE8's blocks and conversions as well as its solid-wall period and listed houses, we keep an occupied home clean and workable, and our founder's 30+ years on the tools mean the result is built properly and made to last.
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
FAQ
Frequently Asked Questions about Kitchen Renovation Deptford
How do you price kitchen renovation in Deptford?
The method for pricing kitchen renovation in Deptford is deliberately dull: measure, scope, itemise, then compare with £18,000 to £60,000 or more (indicative). Nothing is quoted over the phone, because a blind figure changes later. GS Renovation allows for the purpose-built post-war construction at SE8 and prices Part P certification for every new circuit as its own line.
Where does the waste from my SE8 kitchen actually go?
Into a rear gully or a boss on the soil stack, and it is worth confirming which before a refit. Deptford terraces vary, and some kitchens still discharge over an open hopper that is long past useful. We survey the run, connect the new sink and appliance wastes with the correct traps, and replace anything that has been extended over the years with too little fall.
How long will a Deptford kitchen take on site?
Plan on 3 to 5 weeks, stretching to 6 to 8 when a wall comes out too. Cables and pipes are roughed in ahead of the plasterer, units follow, and in a Deptford block the stone fabricator can only measure once the carcasses are level on an often uneven slab, so expect a pause with bare units before the tops return cut to fit.
Can the cooker hood in my Deptford flat vent to outside?
It must, because Part F requires mechanical extraction ducted to outside in a kitchen. In a concrete block, the duct has to reach an external wall, and core drilling through that wall usually needs the freeholder's consent. A short, straight run keeps the hood effective, which can decide where the hob goes.
Is my Deptford flat's consumer unit big enough for an induction hob?
Check before choosing the hob. Induction draws heavily and wants its own supply from the board, and the original units in many Deptford blocks were never sized for that load. Adding the circuit is Part P notifiable work, so we look inside the board on the survey visit, while there is still time to plan an upgrade rather than discover it on fitting day.
Can I have underfloor heating in a Deptford kitchen on a concrete slab?
Yes, though the build-up matters. A wet system needs screed, which raises the floor and can leave a step at the doorway, while thin electric mats add little height but need a new circuit certified under Part P. On a slab, insulation beneath the heating stops heat soaking into the concrete.
How soon can a Deptford kitchen refit start once building control is notified?
Lewisham says that once a building notice is submitted, work can commence within 48 hours. For a kitchen refit in Deptford that removes the need to hold the start date back for a plan check. The notice still has to go in before the old kitchen comes out, not after the new one is fitted. We submit it when the kitchen design and the appliance list are final, because the wiring and drainage layout follow from those two things.
Does a Deptford kitchen with new garden doors need anything beyond the kitchen application?
Yes. Lewisham's building control fees chart lists structural support for new glazing, such as a new door, as its own item, separate from the kitchen. Widening a window into doors needs a lintel or beam designed by the structural engineer we appoint, and that goes on the application alongside the kitchen. The door opening also sets the kitchen layout, so its width is fixed before the units are ordered.
What happens if a Deptford kitchen moves to the back of the house?
A new sink position may need a new underground connection, and Lewisham Building Control's typical inspection stages include drains inspection and drains testing. So a new run from the kitchen to the gully or manhole is laid, inspected and tested before it is covered. In a Deptford terrace where the kitchen moves into the back room, the trench runs under the floor or the garden path, and we book the test before the floor goes back.
Every Service, One Team
More GS Renovation Services in Deptford
One team for every GS Renovation service in Deptford:
Same Service, Nearby Areas
Kitchen Renovation Near Deptford
We carry out kitchen renovation across Deptford and the surrounding areas. Explore a nearby location:
Ready to Start Your Deptford Project?
Free, no-obligation quote for kitchen renovation in Deptford.