Kitchen Extensions Deptford

Rear, side return and wraparound kitchen extensions in Deptford, the room, the services and the kitchen built as one job.

A kitchen extension in Deptford is a job for the houses, and houses are the smaller part of the stock: 85% of homes here are flats and 15% are houses, with 14% terraced. On a terrace the choice is between a single storey rear extension and a side return infill that opens the back of the house into one kitchen and dining room. We build the shell, the steel into the house, the drainage and the kitchen itself as one programme, to the drawings you or your designer have had approved.

In Deptford, a rear kitchen extension of about 30 square metres typically costs £45,000 to £97,500 excluding VAT, or £60,000 to £100,000 for a side return (indicative London ranges, Resi, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Deptford: the structural engineer we appoint designs the foundations and steel, we build the room and fit the kitchen, and a registered electrician certifies the electrics.

Price guide

WorkIndicative London range
Rear kitchen extension, about 30 square metres, ex VAT£45,000 to £97,500
Side return kitchen extension, standard to high specification£60,000 to £100,000
Wraparound kitchen extension, standard to high specification£80,000 to £130,000
Side return build rate, per square metre of new floor£2,400 to £3,200
Kitchen supplied and fitted within the extension£5,000 to £14,000
Structural engineer's fee£950 to £2,500

Indicative London ranges (Resi, MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Extension Cost and Planning Guide.

Quick estimate for Deptford

Deptford range: choose above

Rear extension shell by GS Renovation across the back of a brick house, with the steel held on lifts and the new roof edge in place
The new walls and roof run the full width, with the old rear wall opened up beneath the steel.

What a Deptford terrace can take at the back

The depth a Deptford terrace can take at the back is set by guidance as much as by the plot, and Lewisham's Alterations and Extensions SPD, adopted on 24 April 2019, sets the frame. It says rear extensions on terraced or semi-detached properties should generally be no more than 3m deep. It also says an extension should never take up more than half the depth of the original rear garden or yard. Where the yard is short, the half depth rule becomes the limit before the 3m guide does.

For your kitchen this decides the layout early. If the yard only allows a shallow addition, a side return infill that widens the back room often gives more usable kitchen than extra depth. We measure the yard and the side passage on the first visit so that the layout you choose fits the guidance before any cabinets are drawn. That avoids redesigning the kitchen after the drawings have gone in.

Housing in Deptford

Deptford's housing, as the Council Tax list records it, is about 14,290 homes: 15% houses, 85% flats, with 9% pre-1919, 4% interwar and 84% built since 1945. Most homes here are flats, and only a ground floor flat in Deptford with its own garden can extend its kitchen.

Boundary walls, roof lights and glazing on a Deptford extension

On a Deptford rear extension the wall on the boundary governs the room. Lewisham's SPD says extensions up to 3m long should generally be no more than 3m high on the boundary, which caps the eaves on the neighbour's side, so the ceiling inside slopes or steps. A new wall on the line of junction, or steel bearing in the party wall, is notifiable under the Party Wall Act, and the building owner serves the notices. Height over the island has to come from a roof that rises away from the boundary.

The same SPD says roof lights in the original roof should ideally be flush and never project more than 150mm above its slope. That guide bites where the kitchen sits under the original back addition roof and you want light through that slope. On the new extension roof we place low profile units over the worktop and the sink, where daylight matters most. We set upstands and flashings at the frame stage, and the glazing supplier measures from the built opening, not from the drawing.

Drains under the yard in Deptford and the build over agreement

On a Deptford terrace the drain run under the back yard can decide the programme before the kitchen does. Lewisham's building control guidance says you must apply for a build over agreement before any works if your home is within 3 metres of a public drain or 1 metre of a public lateral drain. Where Lewisham is your building control body, it uses a full plans application for any proposal to build above or within 3 metres of a drain or sewer.

For a terrace this means the drain survey comes first. We lift the inspection chamber cover, trace the run and share what we find with you and your designer, so the build over agreement with the sewerage company and the building control route are in hand before the foundation is dug. The kitchen sink, dishwasher and any new gully are planned into the same drainage layout, which keeps the kitchen plumbing from needing a second dig later.

Flats in Deptford and the kitchen that stays inside

Owners of Deptford flats cannot add a kitchen extension under permitted development, because householder permitted development rules for extensions apply to houses only and not to flats and maisonettes. With 85% of Deptford homes being flats, the realistic kitchen project for many owners is a rework within the existing walls. Opening the kitchen into the living room needs building control approval where the wall is load-bearing, and in a leasehold flat the landlord usually has to consent first.

Where a ground floor flat owner does want to build out, it needs planning permission and normally the freeholder's consent under the lease, and the drawings follow from those. We can then build it in the same way as a house extension. For an upper flat, the better value is usually a new kitchen layout, relocated services and better daylight from the windows you already have, and we price that as its own job rather than stretching the extension scope.

  • Island units with power and waste run through the slab
  • The kitchen itself fitted under the same contract as the build
  • Party wall process explained, with drawings for your notices
Service areaDeptford · SE8
Local authorityLewisham Council
Part ofSouth East London (Inner London)
Typical homesPost-war estates and new riverside flats around a small Georgian core
Housing stock9% built before 1919, 4% interwar, 84% post-war; 85% flats, 14% terraced, 1% semi-detached or detached
Also covered nearbyNew Cross, Peckham, Catford, Bermondsey and Charlton

VOA Council Tax stock of properties, March 2025, for Deptford North, Silwood & Pepys and New Cross & Deptford South. Counts rounded by the VOA.

Trusted Kitchen Extensions in Deptford

You get one team for the extension and the kitchen, so there is no gap between the builder leaving and the fitter arriving. Our founder has more than thirty years of hands-on building experience and runs the job from the first survey. The structural engineer we appoint sizes the steel, a registered electrician certifies the wiring and an engineer on the Gas Safe Register handles any gas. You get a written quotation after a site visit and a written programme you can plan your household around.

  • Our own trades on site rather than a chain of subcontractors
  • Screed left to dry before the kitchen floor finish goes down
  • Old kitchen kept in use until the new shell is weathertight
30+ YearsFounder's experience
Fully Insured5 year guarantee
4.9 / 531 MyBuilder reviews
Building ControlCompliant
Free QuotesNo obligation
Reviews

Rated 4.9 / 5 by our clients

★★★★★ 4.9 average from 31 verified reviews on MyBuilder

★★★★★
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
OscarCrofton Park, London · via MyBuilder
★★★★★
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
Adil KhanWoolwich, London · via MyBuilder
★★★★★
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
scomtottIslington, London · via MyBuilder
Read all 31 reviews

FAQ

Frequently Asked Questions about Kitchen Extensions Deptford

What drives the cost of kitchen extensions in a Deptford home?

Scope drives the price of kitchen extensions in Deptford first, condition second and access third, inside £45,000 to £97,500 excluding VAT for a rear kitchen extension of about 30 square metres (indicative). Scope is set by the regulations as much as the design: the work needs Part P certification for the new kitchen circuits and a Lewisham Council building control completion certificate for the extension. GS Renovation shows that element separately, and the SE8 survey establishes all three before a figure is committed.

How deep can a kitchen extension be on a Deptford terrace?

Lewisham's Alterations and Extensions SPD says rear extensions on terraced or semi-detached properties should generally be no more than 3m deep. It adds that an extension should never take up more than half the depth of the original rear garden or yard. On a short SE8 yard the half depth rule can bite first, so we measure both before the layout is fixed.

Can a Deptford flat owner extend the kitchen without planning permission?

No. Householder permitted development rules for extensions apply to houses only and not to flats and maisonettes, so any extension to a flat needs planning permission. Your lease will normally require the freeholder's consent as well. Where that is not realistic, a reworked kitchen inside the flat, with services moved and a wall opened up, gives more room without either.

How high can a Deptford rear extension wall be on the boundary?

Lewisham's SPD says extensions up to 3m long should generally be no more than 3m high on the boundary. That sets the eaves on the neighbour's side, so the roof slopes up away from the boundary. Building on the line of junction is notifiable under the Party Wall Act, and you as building owner serve the notices. Your designer sets the final heights on the drawings, and we build to them and check them on site.

Do you need a build over agreement for a Deptford kitchen extension?

You do if your home is within 3 metres of a public drain or 1 metre of a public lateral drain, as Lewisham's building control guidance says, and you must apply before any works start. Terraces often have a shared run behind them, so we trace the drains early to see whether the agreement applies to your extension.

Which roof lights suit a Deptford kitchen extension?

Flush or low profile units suit best. Where the roof light goes into the original roof, such as the back addition slope, Lewisham's SPD says it should ideally be flush and never project more than 150mm above that slope. On the new extension roof we place units over the worktop and sink, where the light is most useful, and set frame and flashing heights during the roof build.

Can the kitchen fit-out run in the same programme as the extension?

Yes. We plan the kitchen with the build, so first fix plumbing, waste and electrics go in before the floor and walls close up, and the cabinets are ordered to measurements taken from the finished shell. You keep one programme, one point of contact and one team responsible for how the extension and the kitchen meet.

Does a Deptford house in a conservation area need permission for a side extension?

Yes. Under the permitted development rules, all side extensions on Article 2(3) designated land, such as a conservation area, require householder planning permission. If your Deptford house sits in one of the conservation areas, your designer prepares that application and we build to the approved drawings once the decision is issued.

How long does the steel and structure stage take?

The steel stage is usually a matter of days rather than weeks once the openings are propped. The structural engineer we appoint sizes the beams, we cut the openings, set padstones and install the steel, and building control inspects before anything covers it. The kitchen work cannot start in earnest until this stage is signed off, so we programme it early.

Ready to Start Your Deptford Project?

Free, no-obligation quote for kitchen extensions in Deptford.

We use these details only to respond to your enquiry. See our privacy policy.

Free, no-obligation quote. We reply within 24 hours. Or call 07472 424 226.

Call 07472 424 226Free quote