Kitchen Renovation Greenwich
Bespoke kitchen design and installation in Greenwich, one team for the strip-out, the services and the fit.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £18,000 to £60,000+
- 3 to 5 weeks on site
- Free design visit, itemised quote
GS Renovation designs and builds kitchens across Greenwich, from post-war flats and houses to Georgian townhouses near Greenwich Park and Victorian terraces in Woolwich and Charlton. We handle the cabinetry, worktops, plumbing, electrics and any steelwork as one project, so your new kitchen arrives finished, not left between trades.
In Greenwich, a kitchen renovation typically costs £18,000 to £60,000 or more from design to fitting (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Greenwich: we carry the strip-out, services and fit as one contract, with the electrics certified by a registered electrician.
Price guide
| Work | Indicative London range |
|---|---|
| Kitchen renovation, design to fitting | £18,000 to £60,000+ |
| Opening up for a kitchen-diner, complete | £2,500 to £6,500+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Kitchen Renovation Cost.
Quick estimate for Greenwich
Greenwich range: choose above
How the job runs
- Free design visit at your Greenwich home and an itemised quote.
- Strip-out and any structural work, first-fix plumbing and electrics, plastering.
- Units fitted and levelled; stone worktops templated and cut off site.
- Worktops, appliances, tiling and second fix. Electrics certified under Part P by a registered electrician, or notified to building control. Typically 3 to 5 weeks on site.

Open-plan kitchen-diners in Greenwich terraces
On Greenwich's terraced streets, the most popular kitchen project opens the rear of the house by knocking the kitchen through to the middle room. That dividing wall is almost always load-bearing, so we install a steel beam sized by a structural engineer and signed off by building control. The result is a bright, sociable kitchen-diner in place of two cramped rooms, common in SE7 and SE18.
Where the property has a side return, we often combine the knock-through with an infill extension to widen the space further. We manage the structure and the kitchen together, so once the steel is in we move straight to units, worktops, appliances and lighting. Working in occupied Greenwich homes, we keep dust down and services running for as long as possible during the build.
Housing in Greenwich
Greenwich has about 125,080 homes on the Council Tax list: 22% pre-1919, 17% interwar and 60% post-war, with flats making up 55% and houses 45%. Since most homes here are flats, a kitchen sink in a flat in Greenwich has to stay within reach of the shared soil stack.
Garden doors and a moved sink in a Greenwich kitchen
A Greenwich kitchen refit can grow into a new opening to the garden, and Royal Greenwich treats that as its own piece of work. Its building control charges list new domestic door or window openings as a separate item, so the widened opening needs a lintel or beam designed by the structural engineer we appoint and its own inspection. Outside, the doors may need planning. Royal Greenwich has 23 conservation areas, some under Article 4 directions, and it says there is less permitted development in those areas. Check before the doors are ordered, because their lead time sets the programme.
Moving the sink is the other decision with paperwork attached. Royal Greenwich building control lists drainage alteration among its examples of simple work suited to a building notice, alongside a through room and chimney removal. A sink moved to the far wall or an island needs a new waste run and a new connection, so it goes on the notice with the rest of the job. The notice has to be in two days before that work starts. The old units can come out on day one, but the new waste is not cut in until the notice period has run.
Bespoke kitchens for Greenwich period proportions
Greenwich's Georgian and Victorian houses come with alcoves, chimney breasts and tall ceilings that suit made-to-measure cabinetry far better than off-the-shelf units. We plan the layout around these features, then fit quartz, granite or composite worktops to match the style of the room. In lower-ground kitchens near the Maritime Museum we work with the reduced head height and limited natural light.
From handleless contemporary designs to classic in-frame Shaker kitchens, we build to suit the age and character of the house. Every kitchen includes the plumbing, the electrics, the tiling and the lighting coordinated by one team, with new circuits certified by a registered electrician under Part P or notified to building control. Across SE3 and SE9 that single-team approach means the finished kitchen looks considered and works properly from day one.
What gets inspected in a kitchen
People assume a kitchen sits outside building control, and mostly it does, but three parts of it do not. New or altered circuits are notifiable under Part P, and the Royal Borough wants them certified, either by a registered electrician through a competent person scheme or by direct notification. Mechanical extraction has to meet the ventilation rates set out in Part F. And any structural opening brings the full inspection regime with it. Gas appliances are separate again, since that work sits with a Gas Safe registered engineer and produces its own certificate.
Drainage is the fourth. Where a new waste connects into an existing gully or soil stack, that connection and its fall get looked at, and in the older SE10 properties the existing drainage is not always where the plans suggest. We book inspections as the work reaches each stage rather than saving them for the end, since a covered connection or a plastered circuit is far harder to demonstrate after the fact.
- Pantry, larder and utility room integration
- Underfloor heating and kitchen ventilation
- Quartz, granite and marble worktops templated and fitted
VOA Council Tax stock of properties, March 2025, for all 35 statistical areas in Greenwich. Counts rounded by the VOA.
Trusted Kitchen Renovation in Greenwich
Greenwich homeowners choose GS Renovation because one accountable team handles the whole kitchen, including any steel beam or knock-through, the services and the finish. With our founder's 30+ years on the tools, you get transparent pricing, tidy working in an occupied home and a bespoke kitchen built to suit your flat or house and last.
Reviewed jobs near Greenwich
1 MyBuilder review from Woolwich, with each customer's own job title:
- Replace kitchen extractor hob, Woolwich, 27 Apr 2024 (5 out of 5)
Read all 31 on our reviews page.
Giorgio is an excellent and intelligent workman, and with very reasonable prices! He installed a kitchen extractor fan in a complicated situation…
George was brilliant. Lovely bloke, very reasonably priced and a perfectionist to boot. He completed our small kitchen renovation with care and great…
George was very friendly and helpful from start to finish. He worked really hard to ensure our kitchen was installed to a high standard and was…
FAQ
Frequently Asked Questions about Kitchen Renovation Greenwich
Can I get a fixed price for kitchen renovation at an SE10 address?
A fixed price for kitchen renovation at an SE10 address is possible wherever the scope can be pinned down at survey. GS Renovation quotes most Greenwich jobs as a fixed project price within £18,000 to £60,000 or more (indicative), covering labour, materials and Part F extraction and Part P certification for the circuits. Where an unknown sits behind plaster, it is named before starting, and any variation is agreed in writing.
What is under the kitchen floor in a Victorian Greenwich terrace?
Usually a suspended timber deck over a shallow void, occasionally an old solid screed where a scullery once stood. In SE10 we lift a board and look before pricing any tiling, since the two need completely different preparation. A ventilated void must keep its airbricks clear, and a screed that has taken up moisture needs the cause resolved before a tile seals the damp underneath it.
How long will my Greenwich kitchen be out of action?
Allow 3 to 5 weeks of work in the room itself; a knock-through that needs steel stretches that to 6 to 8. Much of the wait sits between fixing carcasses and fitting worktops, since stone is templated only once units are level and fixed, then fabricated off site. A temporary sink and a plug-in hob elsewhere in the house make those weeks far more bearable.
Can the hob move onto an island in my Greenwich kitchen?
Usually, but the gas and extraction come first. A Gas Safe registered engineer runs and connects any new supply, and Part F still requires mechanical extraction ducted to outside, so the duct has to run within the ceiling or floor to an external wall. Where joists run in the same direction as the duct route, that is straightforward; running across them means a dropped ceiling or a downdraft unit.
Will my Greenwich fuse board cope with an induction hob and new appliances?
Not always. Induction hobs need their own dedicated circuit, and older consumer units often lack the spare ways or protection a new kitchen demands. A new circuit is notifiable under Part P, so a registered electrician checks board capacity, installs and certifies it. That assessment happens at first fix, before plastering, because upgrading the board afterwards means reopening walls.
Moving the kitchen to another room in my Greenwich flat: what must be checked?
Three things, in order. The lease usually needs the freeholder's written consent before a kitchen moves. The waste must reach the soil stack, normally shared with the flats above and below, at a proper fall, so distance from that stack limits where the sink can go. Finally the extraction duct needs a route to an outside wall. With 55% of Greenwich homes being flats, this sequence matters often.
Can a kitchen extension over the drain run in a Greenwich garden go in on a building notice?
Not if the drain is a public sewer within three metres. Royal Greenwich requires a full plans application to build over or within three metres of a public sewer, and that applies to a kitchen extension like any other. Find out what the run is before the kitchen layout is fixed. If the sink, dishwasher and washing machine can drain to the same point the old kitchen used, the new connections stay short and the extension footprint is the only question.
What should a kitchen refit in a Greenwich home built since 2000 check first?
The warranty and the hidden services. In Greenwich 26% of homes were built in 2000 or later, and a home that young may still be inside its structural warranty period, so ask the provider before any wall is cut for a hatch or opening. Newer homes can also carry pipes and cables behind plasterboard or inside the floor zone. A scan and the developer's service drawings, where they exist, come before drilling for wall units.
Does a Greenwich kitchen extension need a gas certificate at the end?
It may. For a domestic extension Royal Greenwich may need a gas certificate before completion, alongside the electrical, fire alarm and glazing paperwork. In a kitchen extension the gas certificate covers a hob or boiler that has been moved or connected, and it comes from the gas engineer on the Gas Safe Register who did that work, not from us. Ask for it on the day of connection, so it is ready when the completion notice goes in.
Every Service, One Team
More GS Renovation Services in Greenwich
One team for every GS Renovation service in Greenwich:
Same Service, Nearby Areas
Kitchen Renovation Near Greenwich
We carry out kitchen renovation across Greenwich and the surrounding areas. Explore a nearby location:
Ready to Start Your Greenwich Project?
Free, no-obligation quote for kitchen renovation in Greenwich.