Home Renovation Hoxton
Whole-home renovations in Hoxton, layout, structure, kitchen and bathroom planned as one job, structure first, then services, then finishes.
- Rated 4.9 from 31 reviews on MyBuilder
- London guide: £40,000 to £150,000+
- Free site survey, itemised quote
GS Renovation takes on whole-home refurbishments across Hoxton, bringing tired post-war flats and the few period houses back to life with one team managing every trade. From the streets near Hoxton Square to the estates towards De Beauvoir, our founder's 30+ years on the tools cover the rewiring, replumbing, replastering and structural changes these homes need, in the right order.
In Hoxton, a full house refurbishment typically costs £40,000 to £150,000 or more (indicative London ranges, MyBuilder and Checkatrade, 2026). GS Renovation Ltd, a building contractor based in Potters Bar, does the work in Hoxton: we carry the structure, services and finishes as one contract.
The two rooms that cost the most have their own pages, with prices: kitchen renovation in Hoxton and bathroom renovation in Hoxton. With 98% of homes in Hoxton flats, the soil stack usually fixes where a bathroom can go, and the lease may need the freeholder's consent for either room.
Price guide
| Work | Indicative London range |
|---|---|
| Full house refurbishment | £40,000 to £150,000+ |
| Kitchen renovation | £18,000 to £60,000+ |
| Bathroom renovation | £6,000 to £20,000+ |
Indicative London ranges (MyBuilder and Checkatrade, 2026), not a quotation. Prices checked September 2026. Full breakdown: Full House Renovation Cost.
Quick estimate for Hoxton
Hoxton range: choose above

Refurbishing Hoxton flats and houses
Most Hoxton homes are post-war flats, where a full refurbishment is about layout, services and finishes rather than period detail, and the lease sets the limits: licence to alter, the freeholder's sound specification, working hours and waste routes. In the few Victorian terraces that remain, we restore rather than rip out, repairing cornicing and mouldings, easing and draught-proofing the sashes and lifting and relaying boards.
Behind dated finishes, Hoxton flats often hide tired wiring, corroded pipework and layouts chopped about over the decades. We reconfigure the plan for modern living, moving a kitchen or bathroom only where the shared stack and the lease allow. Condensation is usually the main damp problem in these blocks, so we trace the cause, whether poor extraction, cold bridging or a failed seal, and fix it before the new plaster and finishes go on.
Housing in Hoxton
Count the homes in Hoxton and you get about 9,920: 81% built since 1945, 4% between the wars and 8% before 1919, with flats at 98% and houses at 2%. Since most homes here are flats, refurbishing a flat in Hoxton starts with the freeholder's licence for alterations.
Windows, doors and railings in a Hoxton renovation
A full renovation is often when owners want new windows and a new front door, and in Hackney that is where the paperwork catches people out. Two Hackney conservation areas carry Article 4 Directions made on 7 July 2008 and approved by the Secretary of State on 27 November 2008. In the De Beauvoir conservation area, the direction requires planning permission for alterations to windows, front doors, railings and additions to the roof of a dwelling house. The St Mark's direction was made on the same dates, but not every property in that conservation area is affected, so the check is by address.
For a Hoxton flat the position differs but is no simpler. 98% of homes in Hoxton are flats, a flat lacks the householder permitted development rights a house has, and the windows may belong to the freeholder under the lease. Replacing them with a different frame material, glazing pattern or colour can be a planning matter and a lease matter at once. Hackney says there are now 35 conservation areas across the borough, so check the map for your address before specifying frames, and order windows only once consent is in hand.
Sequencing a full renovation in Hoxton
A whole-house renovation only runs smoothly when the trades follow the right sequence. We start with the structural work and any steel beams, then first-fix the wiring and plumbing, plaster, and move through second-fix, kitchens, bathrooms, tiling and decoration in turn. Getting this order right in an occupied or empty Hoxton flat avoids the rework and delays that come when jobs are done out of step, and keeps the whole project on programme.
With one team running the job, the electrics are tested and certified by a registered electrician, notifiable work is notified under Part P, and any structural openings are inspected and signed off by Hackney building control. You get a single point of contact rather than chasing separate trades, a clear schedule for a house you may still be living in, and a finished home where the services, structure and decoration have all been planned together from the start.
- Planning permission and building control coordination
- First and second fix sequenced around a realistic decorating date
- Plastering, flooring, painting and decorating
VOA Council Tax stock of properties, March 2025, for Hoxton North & West and Hoxton South & East. Counts rounded by the VOA.
Trusted Home Renovation in Hoxton
Homeowners across Hoxton choose GS Renovation for whole-house projects because one accountable team manages everything, avoiding the gaps that appear when trades are hired piecemeal. We understand how Hoxton's blocks and few older houses are built, restore period features where they survive, and keep the work tidy. Our founder's 30+ years on the tools mean a lasting result.
- One itemised quote covering structure, services and finishes
- Photographs kept at each stage for your records
- First fix and second fix planned around a realistic decorating date
George always kept to commitments and arrived on time. He offered helpful suggestions during his initial visit and promptly provided a reasonably…
Saaid is the best craftsman I have worked with. He knows what he is doing from the very beginning. He has a great knowledge of construction…
It's the second time I have hired George and he has been absolutely professional and the work he did resembles perfectly what I had in mind. Being an…
FAQ
Frequently Asked Questions about Home Renovation Hoxton
What should I budget for home renovation in Hoxton?
Setting a home renovation budget in Hoxton works best from a scoped quotation within £40,000 to £150,000 or more (indicative), not from a headline rate. Once the N1 property has been surveyed, GS Renovation can say what the job involves there, including the order it must follow: strip-out comes before first fix, and first fix before plaster. Every line is itemised so the budget holds. Email info@gsrenovationltd.co.uk to book the survey.
Can you renovate my whole Hoxton terrace while keeping the period features?
Yes. Hoxton's Victorian terraces are few, but we refurbish them while protecting and restoring cornicing, ceiling roses, sash windows and original floors. We plan the rewire, replumb and replaster around the features worth keeping, repair what has been damaged, and can reinstate period detail where it was lost. The character stays while the wiring, plumbing and layout are brought fully up to date.
Do I need an asbestos survey before renovating a post-war Hoxton flat?
Yes. Buildings from before 2000 can contain asbestos, and 81% of Hoxton dwellings date from after 1945, the decades when it went into textured ceilings, floor tiles, panels and pipe lagging. The survey comes before strip-out. In a block the freeholder may already hold one for communal areas, but it will not cover the inside of your flat.
What does the lease control in a Hoxton flat renovation?
More than owners tend to expect. N1 leases typically need the freeholder's written licence before structural changes or before a kitchen or bathroom moves, and they often fix working hours, floor sound insulation and rules for the lift and communal stairs. Apply before booking trades, because the freeholder's surveyor may attach conditions that change the design.
In what order should a full renovation of a Hoxton flat be done?
Lease consent and the asbestos survey first. Then strip-out, then new wiring and pipework run while walls and floors are open, and only after that plastering. Second-fix electrics, sanitaryware and kitchen units follow, with flooring and decoration last. Decide the heating, a new boiler or an electric system, before first fix, since it fixes where pipes and cables go.
Can I stay in my Hoxton flat during a full renovation?
For a whole-flat refurbishment, moving out through strip-out, first fix and plastering is usually more practical: a compact flat has nowhere to retreat from dust, and water or power go off for days at a time. Some owners move back once second fix begins and the bathroom works again. In a house, phasing floor by floor can make staying possible.
How many building control applications does a full Hoxton flat renovation need?
One can cover all of it. Hackney offers full plans, building notice and regularisation applications, and a single full plans application can take in a removed wall, new drainage for a relocated bathroom and altered ventilation together. New electrical circuits go through a registered electrician's self-certification instead. Bundling the notifiable items means one sequence of inspections and one completion certificate for the whole flat, which is simpler to hand a buyer's solicitor than several separate ones.
Can a satellite dish go on a Hoxton building as part of a renovation?
In a Hackney conservation area a satellite dish can need planning permission that it would not need elsewhere, and on a block the outside wall usually belongs to the freeholder in any case. The better route in a renovation is a connection to the building's communal aerial or dish system, or a broadband television service, wired to the new media point during first fix. Then nothing is fixed to the outside wall and no planning consent is needed. A listed building is the exception: work that affects its character, inside or out, including an extension or taking out a wall or chimney breast, needs listed building consent from Hackney Council, and doing it without consent is a criminal offence.
What changes when a Hoxton flat renovation is inside a building from before 1919?
8% of Hoxton homes were built before 1919, and a flat in one of those older buildings behaves differently from a post-war flat. Floors are usually timber joists rather than a concrete slab, so sound and water travel down more easily and the floor can need acoustic treatment between flats. Walls are solid brick, and damp lime plaster is repaired in lime rather than gypsum. Pipe and cable runs can pass between joists, within notching limits, which gives more layout freedom than a slab.
Every Service, One Team
More GS Renovation Services in Hoxton
One team for every GS Renovation service in Hoxton:
Same Service, Nearby Areas
Home Renovation Near Hoxton
We carry out home renovation across Hoxton and the surrounding areas. Explore a nearby location:
Ready to Start Your Hoxton Project?
Free, no-obligation quote for home renovation in Hoxton.